Got another update from Pilar Gold in Brazil with some recent high grade drill results at their Sertao mine which they plan to start up next year and process through their 4500 tonnes per day Pilar mill (used to be an EQX mine but Pilar purchased it last year). 

Average width and grade from all the mineralized holes that have been hit so far there is 1.3m @ 40.5 g/tonne. They're expecting 15-20g/ tonne from Sertao when it starts producing which will be blended with ore from their other operating mines to go through the plant.