Highlights

The 2022 MRE demonstrates an extensive gold resource suited for potential underground mining (see Table 1):

  • 41,300 tonnes grading 3.99 grams per tonne ("gpt") gold ("Au") for 5,300 ounces (Measured)
  • 639,900 tonnes grading 4.09 gpt Au for 84,100 ounces (Indicated)
  • 681,200 tonnes grading 4.08 gpt Au for 89,400 ounces (total Measured and Indicated)
  • 1,099,000 tonnes grading 3.89 gpt Au for 137,600 ounces (Inferred)
  • Project has valid certificate of authorization for 1,000 tonnes per day production
  • Considerable exploration upside along strike and at depth

¹There is no certainty that Indicated mineral resource estimates will be converted to the Measured resource and Proven and Probable mineral reserve categories and there is no certainty that the 2022 MRE will be realized. There is no guarantee that Inferred mineral resource estimates can be converted to Indicated or Measured mineral resource categories, or that Indicated or Measured mineral resource estimates will be converted to mineral reserves. Mineral resource estimates that are not mineral reserves do not have demonstrated economic viability. The 2022 MRE may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant risks, uncertainties and other factors, as more particularly described in the Cautionary Statements at the end of this news release. See "Caution Regarding Forward-Looking Statements".

"Lac Pelletier is a unique asset located in the heart of the Abitibi mining district, with several operating mines and development projects within driving distance. The project benefits from over 85,000 metres of surface and underground drilling, 2,500 metres of ramp access and underground development plus the completion of three separate bulk sampling programs that demonstrated the geological and grade continuities and gold recoveries of 96% at a nearby mill. A certificate of authorization from the Province for 1,000 tonnes per day of mine production remains in effect," comments Garett Macdonald, President and CEO. "The current deposit has been defined to 250 metres below surface with excellent potential for expansion along strike and at depth. The 1,200 metre deep former Stadacona mine lies only 1 kilometre east of the Lac Pelletier gold deposit. Further exploration upside potential exists within a nickel-copper-PGM zone found on the edge of a gabbro intrusion located on the west side of the project, where previous drilling intersected extensive nickel and copper sulphides with associated palladium and platinum over wide intervals. We are excited about this project's potential and are evaluating all opportunities to unlock value for Maritime and its shareholders."

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4548/123533_fa4ecb07549d7989_001.jpg
 
Figure 1: Lac Pelletier Location Map (click to enlarge)
 
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4548/123533_fa4ecb07549d7989_001full.jpg
 

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4548/123533_fa4ecb07549d7989_002.jpg
 
Figure 2: Lac Pelletier Deposit North View (click to enlarge)
 
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4548/123533_fa4ecb07549d7989_002full.jpg
 

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4548/123533_fa4ecb07549d7989_003.jpg
 
Figure 3: Lac Pelletier Deposit West View (click to enlarge)
 
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4548/123533_fa4ecb07549d7989_003full.jpg
 

Table 1: 2022 Mineral Resource Estimate of the Lac Pelletier Gold Deposit (effective date of May 10, 2022).

Lac Pelletier
Gold Deposit
Cut-off Grade
(gpt Au)
Metric
Tonnes
Grade
(gpt Au)
Troy ounces
(oz Au)
Total
Ounces
Total Measured UG (LH) 2.01 1,000 2.41 100 5,300
UG (C&F) 2.60 40,300 4.03 5,200
Total Indicated UG (LH) 2.01 15,700 3.50 1,800 84,100
UG (C&F) 2.60 624,200 4.10 82,300
Total Inferred UG (LH) 2.01 302,700 4.44 43,200 137,600
UG (C&F) 2.60 796,300 3.69 94,400

 
Note: Numbers may not add due to rounding. Please review "Notes to the 2022 MRE" at the end of the news release for additional information.

2022 MRE

The 2022 MRE is based on 455 drill holes totaling approximately 66,000 metres ("m") of drilling information, based on meters/DDHs intersecting the BM.

Unsampled boreholes are not included in the count and follows the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014) and the 2019 CIM Mineral Resources and Mineral Reserves Best Practice Guidelines (collectively, the "CIM Standards").

The 2022 MRE was generated using various cut-off grades depending on the proposed underground ("UG") potential extraction method: 2.01 gpt Au for potential long hole operation ("LH") when the dip of the zones are higher than 45° and 2.60 gpt Au for the potential cut & fill ("C&F") method when the dip of the zones is shallower than 45°. Specific extraction methods are used only to establish reasonable cut-off grades for various portions of the deposits. No Preliminary Economic Analysis, Pre-Feasibility Study or Feasibility Study has been completed to support economic viability and technical feasibility of exploiting any portion of the mineral resources, by any specified mining method. The reasonable prospect for an eventual economical extraction is met by having used reasonable cut-off grades both for a potential LH and C&F extraction scenarios and constraining volumes (Deswik shapes).

Assumptions and Parameters

The 2022 MRE includes a few assumptions and parameters that are in accordance with today's mining reality, which are indicated in the "Notes to the 2022 MRE" section below.

Qualified Persons

Technical information related to the 2022 MRE contained in this news release has been reviewed and approved by Vincent Nadeau-Benoit, P.Geo., Martin Perron, P. Eng. and Simon Boudreau, P.Eng. of InnovExplo, who are Independent and Qualified Persons as defined by NI 43-101, with the ability and authority to verify the authenticity and validity of this data.

A site visit was conducted by Vincent Nadeau-Benoit, P. Geo. A review of the general access and a visual check of the overall condition of the site was completed. Drill collar coordinates were validated in the field and assays certificates were verified as well as a review on available drill core. Underground access was not possible so no validation of underground holes was possible, but the validation of assays certificates for u/g holes was performed.

Jeremy Niemi, P.Geo., technical advisor to Maritime for the Lac Pelletier project, who is Independent and a Qualified Person as defined by NI 43-101, has also reviewed and approved of the scientific and technical disclosure contained in this news release.

Notes to the 2022 MRE

  • The effective date of the 2022 MRE is May 10, 2022.
  • The independent and qualified persons for the 2022 MRE are Vincent Nadeau-Benoit, P. Geo., Martin Perron, P. Eng. and Simon Boudreau, P.Eng. all from InnovExplo Inc.
  • The 2022 MRE follows the CIM Standards.
  • These mineral resources are not mineral reserves, as they do not have demonstrated economic viability. The results are presented undiluted and are considered to have reasonable prospects of economic viability.
  • The estimate encompasses 19 mineralized lenses in two (2) zones (Zone 3 and Zone 4) using the grade of the adjacent material when assayed or a value of zero when not assayed. Dilution zones encompassing all mineralized zones were created to better reflect the internal dilution within the constraining shapes.
  • High-grade capping supported by statistical analysis was done on raw assay data before compositing and established on a per-zone basis varying from 25 to 50 gpt Au for mineralized zones and 5 to 10 gpt Au for the dilution zones. Composites (1.5-m) were calculated within the zones using the grade of the adjacent material when assayed or a value of zero when not assayed.
  • The estimate was completed using a sub-block model in Leapfrog Edge 2021.2.4. A 5m x 5m x 5m parent block size was used.
  • Grade interpolation was obtained by Inverse Distance Squared (ID2 )using hard boundaries. Dynamic anisotropy was used for the interpolation of all mineralized lenses.
  • A density value of 2.826 g/cm3 was assigned all mineralized zones.
  • The mineral resource estimate is classified as Measured, Indicated and Inferred. The Inferred category is defined with a minimum of two (2) drill holes within the areas where the drill spacing is less than 50 m and shows reasonable geological and grade continuity. The Indicated mineral resource category is defined with a minimum of three (3) drill holes within the areas where the drill spacing is less than 25 m and shows reasonable geological and grade continuity. Measured mineral resources were classified as Mineral Resources present within 10 m of an underground opening within a mineralized zone. Clipping boundaries were used to refine classification based on those criteria.
  • The 2022 MRE is locally constrained within Deswik Stope Optimizer shapes using a minimal mining width of 1.8 m for LH and 3.6 m for C&F. It is reported at a rounded cut-off grade of 2.01 gpt Au using the LH method, and 2.60 gpt Au, using the C&F method. The cut-off grades were calculated using the following parameters: mining cost = C$60/t to C$100.00/t; transport to process cost = C$15.00/t; processing cost = C$45.00/t; G&A = C$15.00/t; refining costs = C$5.00/oz; selling costs = C$22.00/oz; gold price = US$1,700.00/oz; USD:CAD exchange rate = 1.30; and mill recovery = 96.0%. The cut-off grades should be re-evaluated in light of future prevailing market conditions (metal prices, exchange rates, mining costs etc.).
  • The number of metric tonnes was rounded to the nearest hundred, following the recommendations in NI 43-101 and any discrepancies in the totals are due to rounding effects. The metal contents are presented in troy ounces (tonnes x grade / 31.10348) rounded to the nearest hundred.
  • The independent and qualified persons for the 2022 MRE are not aware of any known environmental, permitting, legal, political, title-related, taxation, socio-political, or marketing issues that could materially affect the Mineral Resource Estimate.

Table 2: Sensitivity of the 2022 MRE to different gold prices (Effective date of May 10, 2022).

Gold Price
(US$/oz)
Cut-off Grade
(gpt Au)
Lac Pelletier Gold Deposit
  UG (LH) UG (C&F) Metric
Tonnes
Grade
(gpt Au)
Troy Ounces
(oz Au)
MEASURED RESOURCES  
1530 2.23 2.89 36,200 4.13 4,800
1700 2.01 2.60 41,300 3.99 5,300
1870 1.82 2.36 46,700 3.76 5,700
INDICATED RESOURCES  
1530 2.23 2.89 555,300 4.36 77,800
1700 2.01 2.60 640,000 4.09 84,100
1870 1.82 2.36 738,500 3.84 91,300
INFERRED RESOURCES  
1530 2.23 2.89 921,000 4.14 122,600
1700 2.01 2.60 1,099,000 3.89 137,600
1870 1.82 2.36 1,268,600 3.67 149,600

 

Note: Numbers may not add due to rounding. The reader is cautioned that the figures provided in Table 2 should not be interpreted as a statement of mineral resources. Quantities and estimated grades for different gold prices (and cut-off grades) are presented for the sole purpose of demonstrating the sensitivity of the resource model to the choice of a specific gold price.