Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Quebec Precious Metals Corporation V.QPM

Alternate Symbol(s):  CJCFF

Quebec Precious Metals Corporation is a Canada-based gold explorer with a land position in the prospective Eeyou Istchee James Bay territory, Quebec, near Newmont Corporation’s Eleonore gold mine. The Company’s flagship project is the Sakami project with significant grades and drill-ready targets. The Sakami project is located in the Eeyou Istchee James Bay territory of northern Quebec. The project consists of approximately 281 claims covering a total area of 143 square kilometers. Its 100% owned Elmer East project is located along trend from the recent Patwon prospect gold discovery made by Azimut Exploration Inc. The project has gold potential totaling about 929 claims (488.4 square kilometers) and includes the adjacent Annabelle block, and the Opinaca Gold West block. Its 100% owned Cheechoo-Eleonore Trend project comprises about 128 claims (66.4 square kilometers) and is adjacent to the northwest to the Company’s Sakami project. It also owns various non-core assets.


TSXV:QPM - Post by User

Post by rockyfanon Nov 09, 2020 8:45am
152 Views
Post# 31861525

Good news this morning...9/11/2020

Good news this morning...9/11/2020

Montreal, November 9, 2020 – Quebec Precious Metals Corporation (“QPM” or the “Company”)(TSX.V: QPM, OTCQB: CJCFF, FSE: YXEP) is pleased to report the drill results of the first five holes at the La Pointe Extension discovery obtained following the 19-hole summer and fall diamond drilling program on the Sakami Project (the “Project”) in Quebec’s Eeyou Istchee James Bay territory (see the Company’s press releases of September 10, August 13, June 23, June 18 and April 21, 2020). The program aimed to better define and expand the zone of 600 m in strike length at the la Pointe Extension discovery made during the 2020 winter campaign. A total of 4,912 m in 19 holes were completed during this campaign. Results from 14 holes are pending.

Normand Champigny, CEO of QPM, stated: “We are very pleased with these results. They show the expansion of the discovery along strike and at depth and confirm the strong exploration potential of the Sakami Project.”

Highlight of the recent results received to date is 0.93 g/t Au over 101 m, including 1.10 g/t Au over 80 m, in hole PT-20-159. Table 1 presents the complete results of the program. Figures 1, 2 and 3 show the drill results in plan, longitudinal section and cross-section. 

The La Pointe deposit and the new La Pointe Extension discovery are part of a larger 2- kilometre-long mineralized trend on the Project striking SSW-NNE. This discovery has potential kilometre-scale extensions that have been subject to very limited surface exploration and no drilling before 2020. Two high-grade surface grab samples (23.82 g/t Au, 9.52 g/t Au) located 700 m apart further illustrate the potential of this discovery.

The drilling results indicate to date that gold-bearing mineralization at the La Pointe Extension discovery and at La Pointe have a similar geological character: hosted within a volcano-sedimentary sequence of the Yasinski Group (La Grande Subprovince) which is metamorphosed to amphibolite facies and strongly deformed by a regional WSW to ENE event. This sequence is in contact with sedimentary rocks of the Laguiche Group (Opinaca Subprovince) to the east. 

The lithologies are composed mainly of: 1) biotite-rich and silicified paragneiss with intrusions of granodiorite, tonalite and pegmatite, and 2) amphibolite (metamorphosed sedimentary iron formation and mafic volcanic rock). The gold mineralization is accompanied by disseminated arsenopyrite, pyrite and pyrrhotite and cross-cutting quartz-carbonate veinlets.

The Project provides the Company with a controlling position over a 23-kilometre-long segment of a favourable geological contact and comprises of 259 claims (131.1 km2). It is located 570 km north of Val d’Or, Quebec, 120 km east of the municipality of Wemindji, 90 km from the lonore gold mine and 47 km northeast of the paved James Bay Road. Good infrastructure is present including major access roads, a hydro-powered electric grid and airports. Drilling can be carried out throughout the year.

Quality Assurance/Quality Control

The drilling contract was awarded to Forage Val-d’Or Inc. based in Val-d’Or, Quebec. The hole diameter is NQW. Drilling took place from January 15 to March 24, 2020. Quality assurance and quality control procedures have been implemented to ensure best practices in sampling and analysis of the core samples. The drill core was logged and then split, with one-half sent for assay and the other retained in the core box as a witness sample. Duplicates, standards and blanks were inserted regularly into the sample stream. The samples were delivered, in secure tagged bags, directly to the ALS Minerals laboratory facility in Val-d’Or, Quebec. The samples are weighed and identified prior to sample preparation.  All samples are analyzed by fire assay with AA finish on a 30 g sample (0.005-10 ppm Au), with a gravimetric finish for assays over 10 ppm Au.

Qualified Persons

Normand Champigny, Eng., Chief Executive Officer of the Company, and Tony Brisson, P. Geo., Senior Exploration Manager, both Qualified Persons under NI 43- 101 on standards of disclosure for mineral projects, have prepared and approved the technical content of this release.

About Quebec Precious Metals Corporation

QPM is a gold explorer with a large land position in the highly-prospective Eeyou Istchee James Bay territory, Quebec, near Newmont Corporation’s lonore gold mine. QPM’s flagship project is the Sakami project with significant grades and well-defined drill-ready targets. QPM’s goal is to rapidly explore this project to advance it to the mineral resource estimate stage.

For more information please contact:

Jean-Franois Meilleur
President
Tel.: 514 951-2730
jfmeilleur@qpmcorp.ca

Normand Champigny
Chief Executive Officer
Tel.: 514 979-4746
nchampigny@qpmcorp.ca

 
<< Previous
Bullboard Posts
Next >>