SOME HERESEEM TO STILL BE PERPLEXED AS TO WHY THE ATV SP STAYS SO LOW.
ADDING AND EXPANDING WITH MORE DRILLING BESIDE DISCOURAGING PAST NUMBERS COULD TELL THE TALE.
COULD BE WHY A POTENTIAL FLOOD OF BUYERS HAVE CHOSEN TO WAIT UNTIL THESE NEXT MUD LAKE SHEAR ZONE ASSAYS COME OUT.
THE RISK OF BEING CAUGHT IN THIS ONE IF MORE OF THE SAME POOR SHOWINGS ARE RELEASED RESULTING IN A DEVASTATING DROP IN SHARE PRICE ARE THE CHANCES YOU TAKE.
THE CHANCE THEY COME BACK WITH DECENT SHOWINGS IS POSSIBLE BUT THIS AREA HAS HAD MUCH WORK DONE IN THE PAST. THE RESULTS HAVEN'T BEEN TOO ENCOURAGING.
MUD LAKE WITH ASSAYS PENDING IS ONLY ONE OF ATV'S PROJECTS.
# Drilling in 2007 intersected up to 13.9 g/t gold across 1.0 m within 6.1 m wide mineralized zone averaging 3.3 g/t gold
# A 16.9 line-km Induced Polarization survey outlined 20 anomalies that could be related to mineralization
# 18 to 20 hole drill program to commence in November, 2007