FROM THE FEBRUARY NEWS
The program is designed to define a bulk tonnage gold-silver resource over the extent of the mine area. The first set of 8-10 holes is being drilled to provide a broad geological section over the 800m width of the deposit as defined by the underground workings. Four holes have been completed to date totalling 801m, with another 5 or 6 holes planned to complete the profile. Subsequent step-out holes will be drilled on a 100m grid. The first batch of drill results should be available in mid March.
trave have not begin??