Drilling at Porphyry CreekSent an e-mail to the President, Michael Rowley and got a quick response.
Thanks for your email, I'm happy to answer your questions.
We are using one drill rig. The rocks are hard, which is a good sign as they appear to be silicified which fits our model, so drilling has been slower than it could otherwise be. I would expect 16 days drilling plus a day mobing between sites. The sites are only a few hundred m apart in total.
Essentially we are drilling 3 holes from the inside of our 'donut' (ring-shaped anomaly) towards the outside, down into the conductive high. These holes also go under very high copper and molybdenum in soils (geochem) and, in the case of our second hole, also under the historic drill and trench results from 1969.
GLTA
Malibu