RE: RE: Drilling on the Broulan!!! Load Up!!!I also talked to the office today and was told they will
drill the Broulan Reef -nose fold structure.
1500 meter hole planned, drill set-up on East side of the channel.
Also 21 property to be drilled, later this year.