Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Mountain Lake Resources Inc V.MOA



TSXV:MOA - Post by User

Post by Ridgebackon Oct 27, 2011 8:28am
268 Views
Post# 19185535

MOZ and MOA Expand AU Resource

MOZ and MOA Expand AU Resource

MARATHON GOLD EXPANDS LEPRECHAUN GOLD DEPOSIT WITH INTERCEPTS OF 5.99 G/T AU OVER 10.8 M AND 3.69 G/T AU OVER 12.4 M

Marathon Gold Corp. and Mountain Lake Resources Inc. have had continued success with the intersection of high grade, mineralization, in the "Heart of Gold" area of the Leprechaun Gold Deposit (Figure 1). Significant new main zone intercepts include 5.99 g/t Au over 10.8 meters including 28.88 g/t Au over 1.8 meters in VL-11-345, and 3.69 g/t Au over 12.4 meters including 39.80 g/t Au over 1.0 meter in VL-11-343.

"Our exploration initiatives have proven advantageous for Marathon. As we approach the end of our 2011 drill program, we continue to discover wide intervals of high grade mineralization as well as significant hanging wall and foot wall mineralization. These new high grade gold intercepts will have a positive impact on the new Leprechaun Gold Deposit resource which is on track for release in the fourth quarter of 2011", said Phillip Walford, President and CEO of Marathon Gold Corporation.

The Valentine Lake Project, including the Leprechaun Gold Deposit, is a 50/50 Joint Venture between Marathon and Mountain Lake Resources Inc. Both companies are equal contributors to the 25,000 m drilling program in which Marathon is the operator. All grades in this release are uncut, and all thicknesses are estimated true thicknesses. A total of 145 drill holes totaling 24,938 m (99.8%) of the planned 25,000 m 2011 drilling campaign have now been completed. It is expected that the remaining drilling will be completed shortly, with a resource estimation to follow before year end.

Highlights: In-fill drill holes within the "Heart of Gold" area continue to confirm along-strike continuity of high grade mineralization with intervals of 5.99 g/t Au over 10.8 m including 28.88 g/t Au over 1.8 m in VL-11-345, 3.69 g/t Au over 12.4 m including 39.80 g/t Au over 1.0 m in VL-11-343, and 3.34 g/t Au over 9.0 m including 9.52 g/t Au over 2.7 m in VL-11-344.

The new Hanging Wall Zone reported on October 3, 2011 and October 6, 2011, continues to expand with significant new mineralization intersected in drill holes VL-11-345 with 6.53 g/t Au over 2.6 m, VL-11-347 with 4.41 g/t Au over 2.9 m, and VL-11-343 with 2.15 g/t Au over 2.9 m.

Significant new Footwall Zone intercepts include 5.73 g/t Au over 2.4 m with 17.09 g/t Au over 0.8 m in VL-11-353 and 3.20 g/t Au over 2.8 m in VL-11-355.

The successful 2011 drill program is now completed at the Leprechaun Gold Deposit, and the drill rigs have moved 1.5 km along-strike to the southwest to conduct initial exploration drilling in the newly discovered J. Frank Zone.

TABLE 1: Significant Assay Intervals for the Leprechaun Gold Deposit*

                                CoreDDH       From     To      LengthTT (m)Gold (g/t) UncutVL-11-343     52      56           4      3.6        1.5290      93           3      2.9        2.15141      154         13      12.4       3.69including    152      153          1      1.0       39.80VL-11-344    110      113          3      2.7        1.51191      201         10      9.0        3.34including    194      197          3      2.7        9.52VL-11-345     50      53           3      2.6        1.7994      97           3      2.6        6.61121      128          7      6.3        1.23187      199         12      10.8       5.99including    187      189          2      1.8       28.88VL-11-346     67      70           3      2.9        1.63169      173          4      3.8        2.71184      187          3      2.9        6.96VL-11-347     10      13           3      2.9        1.8084      87           3      2.9        4.41224      236         12      11.4       0.82VL-11-353     75      78           3      2.4        2.92124      129          5      4.0        5.41including    125      126          1      0.8       26.04148      151          3      2.4        5.73including    148      149          1      0.8       17.09164      168          4      3.2        1.26VL-11-354     67      72           5      5.0        0.94264      267          3      2.3        1.73VL-11-355    124      137         13      10.4       1.61including    136      137          1      0.8       12.76142      145          3      2.4        1.34155      160          5      4.0        2.23209      212          3      2.1        5.94217      220          3      2.1        2.14239      242          3      2.1        1.53247      251          4      2.8        3.20

*Assay results for drill holes VL-11-348, 349, 350, 351 and 352 were released in October 6, 2011 press release. VL-11-356 drilled into mafic dike and had no significant assay results.

All of the samples were analyzed at Eastern Analytical Laboratory Ltd., in Springdale, Newfoundland. Samples were assayed using lead collection fire assay with AA (atomic absorption) finish. Due to the coarse nature of the gold at the Leprechaun Gold Deposit, the metallic screening method is used on economically important intersections using standard fire assay techniques. The reported values in this release are fire assay results.

Sherry Dunsworth, M.Sc., P. Geo., VP of Exploration, Marathon's Qualified Person, has reviewed the contents for accuracy and has approved this press release on behalf of Marathon.

<< Previous
Bullboard Posts
Next >>