RE: Obstacles left?1) Need to find a place to mill the ore (Strike does not have a mill on site). The closest mill is Richmonts Island Gold mine. Richmonts mill is only rated for 600-700 tpd and im sure they are at full capacity (its a really small operation). Strike needs to come up with some sort of arrangement (royalties ?).
2) Lots of drilling to actually determine how much gold is left.
Dont see them producing intil 2013-2014 at the earliest. IMHO