RH # 17 158 feet Oil, 6 zones oil production Canacol will produce $110 oil from RH 17 in months after Mirador 20 feet produced, still 138 feet for CNE oil producing $110 barrel . Here Look, The RH 17 well was spud on February 12, 2012, and reached a total depth of 10,746 ft md on February 22, 2012 in the Ubaque reservoir. The well was drilled in a record time of 10 days. Good oil and gas shows were encountered in the C7, Mirador, Los Cuervos-Barco, Guadalupe, Gachet,a and Ubaque reservoirs while drilling. Petrophysical analysis of the open-hole logs indicates a total of 158 feet of net OIL pay within the well: 4 ft of net oil pay within the C7 reservoir with average porosity of 16%, 20 ft of oil pay in the Mirador reservoir with average porosity of 23%, 20 ft of net oil pay within the Los Cuervos-Barco reservoir with average porosity of 18%, 22 ft of net oil pay within the Guadalupe reservoir with average porosity of 25%, 32 ft of net oil pay within the Gacheta reservoir with an average porosity of 17%, and 60 ft of net oil pay within the Ubaque reservoir with average porosity of 24%..