Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Pure Hydrogen Corporation Limited V.SXE


Primary Symbol: STRXF

Pure Hydrogen Corp Ltd is engaged in the hydrogen business. The company is focused on developing hydrogen and gas projects.


OTCPK:STRXF - Post by User

Post by brandonnon Aug 08, 2013 12:22pm
488 Views
Post# 21656790

EF Area activity worth noting

EF Area activity worth noting

The Action is getting closer and closer to Strata's lands.

Terrace re-enters Eagle Ford well at Maverick

2013-08-08 09:46 ET - News Release

 

Mr. Dave Gibbs reports

TERRACE MAKES SIGNIFICANT EAGLE FORD SHALE TEST IN MAVERICK COUNTY PROJECT

Terrace Energy Corp. and its partner have successfully completed a re-entry of an existing Eagle Ford shale well on its 147,000-acre Maverick County project.

Dave Gibbs, the Company's President commented: "The successful completion of an Eagle Ford Shale well is very significant for the development of this project. While our initial primary target continues to be the Pearsall Shale; these early results point to the prospect of multiple formations over a surface area of 200 square miles. We expect the Maverick County Project to develop into a major area of operations for many years to come."

The Chittim F-1H Eagle Ford Shale well was drilled by a predecessor operator in 2011 and completed with 15 stages of hydraulic stimulation over a horizontal interval of approximately 5,000 feet. During initial flowback testing, the well encountered operational difficulties and was temporarily shut in. After studying the well data, the current project operator, BlackBrush Oil & Gas, re-entered the well bore, installed production tubing and began additional flowback testing on a tightly controlled choke. Recent industry experience indicates that extended shut-in periods after fracture stimulation and carefully controlled flowback testing may result in significantly better long-term economics with shallower decline rates within the Eagle Ford Shale formation. The well production increased under careful control from initial rates of 30 barrels of oil per day ("BOPD") to rates over 300 BOPD and 151 thousand cubic feet of gas per day. Plans are underway to place the well on artificial lift and continue increasing the flow rate. Test results indicate that sustained production rates on artificial lift may be significantly higher than current test rates. Total capital costs for the re-entry were approximately US$280,000.

These test results indicate excellent flow characteristics are achievable in this "black oil" window of the Eagle Ford Shale on the western side of the trend, opening up a significant portion of the Maverick County Project to Eagle Ford Shale development. The Company and the project operator plan to follow on this success with an additional Eagle Ford Shale test well later this fall. Data from the Chittim F-1H will be used to optimize completion designs for the new drilling project including the evaluation of "Gas Frac" technology.

Evaluation work also continues on schedule for the recently drilled Chittim 1-H Pearsall Shale test well. The operator encountered significant hydrocarbon indicators in the Pearsall Shale during the drilling phase of the project as expected in the pre-drill prognosis. An initial 6-stage experimental fracture stimulation was performed and flow back testing has begun. Plans are to use the data from this initial experimental work to optimize further completion activity in the wellbore. An additional 9 fracture stimulation stages will be completed in the well as soon as theses analyses are completed.

The Chittim 1-H also encountered major hydrocarbon indicators during the shallow drilling phase before entering the Pearsall formation. Petrophysical analysis indicates strong reservoir characteristics in the Eagle Ford Shale approximately 10 miles northwest of the currently testing Chittim F-1H Eagle Ford Shale test well described above. These analyses also indicate highly prospective potential in the Buda Limestone as well as other secondary objectives. As a result, plans are underway to optimize a Buda Limestone test well later this year.

We seek Safe Harbor.

Bullboard Posts