RE:RE:RE:Mineral Resource Estimate for Golden Meadows Tailings
My thought is that you should process all of the tailings material because most of it has good mineral value, they want to cut out about half of it because it is "low grade", low grade if you had to mine and mill it, much better grade if you just have to scoop it up and process it with a facility that is already there.
The processing costs for this stuff is next to nothing so a very low grade is economic, probably .25 g/t au.plus by products, to have a cut off rate of .75g/t au PLUS credits is crazy.
This material is in a very small area, 75m by 75m and shallow.
Keep it simple and process the whole thing.
Gotta do better boys.
JMHO