RE:RE:RE:RE:RE:Look at the % change in shorts.....
Weeble, The casing would have been ordered long ago and would be available to move to rig site after the logging. To think it will take two weeks to run casing, without major problems, is simply foolish. In reality, it will take longer than tripping the drill pipe in, but two weeks is out of the question, unless you have trouble. If Cardiff 3 does not have casing to TD by now, it never will.