Total Scint readings this morning That is nearly a total of another
69 meters of composite off-scale (>9999 cps) radioactivity in this last batch of readings:
Drilling Highlights include: Hole PLS14-215 (line 660E)
- 119.5m total composite mineralization (between 65.0m - 218.5m) including:
- 24.05m total composite off-scale (>9999 cps) radioactivity
Hole PLS14-214 (line 645E)
- 153.5m total composite mineralization (between 58.5m - 239.5m) including:
- 23.0m total composite off-scale (>9999 cps) radioactivity
Hole PLS14-209 (line 510E)
- 96.0m total composite mineralization (between 53.5m - 193.0m) including:
- 14.21m total composite off-scale (>9999 cps) radioactivity
Hole PLS14-213 (line 810E)
- 74.0m total composite mineralization (between 117.0m - 272.0m) including:
- 7.74m total composite off-scale (>9999 cps) radioactivity
Ross McElroy, President, COO, and Chief Geologist for Fission, commented,
| "Ten holes drilled in the R780E zone and ten hits. We are particularly pleased by the shallow depth, strength and width of mineralization encountered in many of the holes. In addition, a second mineralized hole in the new R1620E zone, makes this a promising new target that will require further follow-up. A remarkably strong set of drill results overall and another big step forward for PLS." | |
The twelve holes announced today represent the completion of the delineation drill program, which consisted of 82 drill holes: 1 hole testing the R00E zone, 1 hole in-between the R00E and R780E zone, 77 holes testing the