Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Mart Resources Inc MAUXF



OTCPK:MAUXF - Post by User

Post by wallywillon Jul 16, 2014 8:43am
603 Views
Post# 22749861

production update

production update
Mart Resources, Inc.: Operations and Production Update

 

CALGARY, ALBERTA--(Marketwired - July 16, 2014) -

  • Umusadege field production averaged 6,793 barrels of oil per day ("bopd") during June 2014 based on calendar days; average field production based on production days was 10,871 bopd during June 2014.
     
  • Umusadege field net deliveries into the export pipeline were approximately 203,786 barrels of oil ("bbls") in June 2014 before pipeline losses and approximately 157,433 bbls after deducting pipeline and export facility losses estimated by Mart for June 2014 based upon the 12-month rolling average rate of actual pipeline and export facility losses.
     
  • Pipeline and export facility losses reported and allocated to Mart and its co-venturers for May 2014 were 73,237 bbls, or 22.7% of total crude oil deliveries into the export pipeline.
     
  • Aggregate downtime during June 2014 totaled approximately 11.3 days.
     
  • Umugini pipeline construction is essentially complete and the upstream and downstream tie-ins are in progress.
     
  • The UMU-3 side-track horizontal well was completed and flow testing from the VI sand is scheduled to begin shortly. The rig is being moved to the UMU-4 location for a horizontal side-track well targeting a completion in the VII sand.
     

Mart Resources, Inc. (TSX:MMT) ("Mart" or the "Company") and its co-venturers, Midwestern Oil and Gas Company Plc. ("Midwestern", Operator of the Umusadege field) and SunTrust Oil Company Limited are providing the following updates on Umusadege field production for June 2014 and other operations.

June 2014 Production Update

Umusadege field production during June 2014 averaged 6,793 bopd. Aggregate Umusadege field downtime during June 2014 was approximately 11.3 days due to (1) a shutdown of the Nigerian Agip Oil Company Limited ("NAOC") export pipeline resulting from a lack of storage capacity at the Brass River export terminal due to export shipment delays, and (2) other operational interruptions resulting from general pipeline repairs and maintenance. There were two full down days during the month. The average field production based on producing days was 10,871 bopd in June 2014.

Total net crude oil deliveries into the NAOC export pipeline from the Umusadege field for June 2014 were approximately 203,786 bbls before pipeline losses. Based upon the 12-month rolling average rate of pipeline and export facility losses from June 2013 to May 2014 of 22.75%, Mart estimates pipeline and export facility losses for June 2014 will be approximately 46,353 bbls. Using this estimated pipeline and export facility loss volume, Mart estimates that the total net crude deliveries into the NAOC export pipeline from the Umusadege field for June 2014 less estimated pipeline losses will be 157,433 bbls.

Pipeline and export facility losses reported by NAOC and allocated to Mart and its co-venturers for May 2014 were 73,237 bbls, or 22.7% of total crude oil deliveries into the export pipeline for that month. Pipeline and export facility losses allocated to Mart and its co-venturers from January to May 2014 have averaged 16.6% of total crude oil deliveries into the export pipeline for 2014.

As previously announced, total net crude oil deliveries into the export pipeline from the Umusadege field for May 2014 were approximately 322,086 bbls. Accordingly, after deducting the actual pipeline and export facility losses allocated for May 2014, the total net crude oil deliveries less losses for May 2014 were 248,849 bbls. Mart previously estimated pipeline and export facility losses for May 2014 to be approximately 73,971 bbls, based upon the 12-month rolling average rate of pipeline and export facility losses of 22.97% between May 2013 and April 2014. June 2014 pipeline and export facility losses have not yet been reported by NAOC.

Umugini Pipeline Update

The Umugini pipeline construction and tie-in are nearing completion. Pressure testing of the 23- and 28-kilometer sections of the pipeline is now complete. Delays in obtaining work permits and specialty pipeline equipment have been resolved. Controls, tanks, pumps and pig launcher facilities (for cleaning the line) are being installed on the upstream end of the pipeline, while the measurement and pig receiver facilities are being installed on the downstream end. The final road crossing to the tie-in manifold is complete. Planning for the commissioning, start-up and operation of the pipeline including finalization of the Crude Handling Agreement is ongoing. Midwestern, which is managing the construction and operation of the Umugini pipeline, is targeting a completion date in late July or August 2014.

Umusadege Drilling Update

Drilling operations have been completed on the UMU-3 side-track horizontal well. Total depth of the UMU-3 well is 8,549 feet and a sand screen completion has been installed in the 787 foot lateral section in the VI sand. Extended production testing is expected to commence shortly with results expected by the end of July. Further updates will be provided once testing is completed. Meanwhile, the rig is being moved to the UMU-4 well to execute a similar horizontal side-track, targeting the VII sand. 