GREY:ARGEF - Post by User
Post by
hcourtemon Aug 09, 2017 9:05am
137 Views
Post# 26559955
Argex Titanium Updates on Milestone Achievements
Argex Titanium Updates on Milestone AchievementsMONTREAL, QC / ACCESSWIRE / August 9, 2017 / Argex Titanium Inc. (RGX.TO) ("Argex" or "the Corporation") is pleased to provide an update on significant achievements at the Valleyfield laboratory, as well as on the basic and detail engineering for its planned Titanium Dioxide (TiO2) Technology Center and commercial plant. At its Valleyfield laboratory, Argex has completed the last finishing step of its process by concluding final validation runs, which fixes the flowsheet for the whole process. The database required for commercial plant design is also complete. We have provided product samples to off-takers for certification testing, and are very confident that our product meets or exceeds industry standards. Basic engineering for the construction of the Technology Center and the commercial plant is now 60% complete, and process simulations will be finished in August. CFD (computational fluid dynamics) work is underway at McGill University and leach system design will be completed shortly. The modern computing methods being used are well accepted in the industry, are less costly than semi-finished workings and accelerate the commercial plant design process. In addition to working with SCN-Lavalin and WSP on various engineering projects, Argex has retained the services of Thibault & Associates Inc., an independent engineering firm specialized in chemical processes, to validate the engineering work being done by Argex for its commercial plant design. Thibault & Associates will review the work and assist with incorporation into the final plant design. The review will cover all aspects of reaction chemistry, equipment configuration, and OPEX (plant operating cost) and CAPEX (capital investment) estimates, thus providing a thorough third-party review of the final basic engineering package. Preliminary PIDs (piping and instrumentation diagrams) are ready and the detailed equipment design for the commercial plant should commence soon. The instrumentation architecture has been completed and we are now working on field instruments and control mechanisms. Argex has arranged for external equipment vendors to test the hardware that will be supplied by the vendors with performance guarantees for the commercial facility. The Corporation is also in discussions with property owners for a plant site for both the Technology Center and the commercial facility in Quebec. The location will be announced as soon as the contracts have been signed. Finally, meetings have been held with the Quebec government's environmental divisions for permitting of both the Technology Center and the commercial plant. The required documents are currently being prepared for submission to the relevant authorities.