RE:RE:RE:RE:RE:RE:If your not sure
The % barite (4.45sg) is the amount of high grade barite in the zone. Take the % and multiply it by the zone length. ie. 15.22m x 37.65% = 5.73m of barite. That barite is the high grade that can be recovered. The ore is 37.65% barite over 15m. The actual barite is grading 96%-99% BaSO4. Its a breccia zone (mix of dolomite and barite) and the ore will be mined crushed and gravity seperated.