transistion miningI believe that MQR will start with one of the 3 properties and then transition to the next . Mackenzie looks the best as a quick open pit with railway access( no tailings pond) and then Swanson ( no tailings pond). after that they can move the equipment to Croiner. This will leave Wasamac as the toiling mine or wait a few years and use the 2 mills to process the ore. They could also use a DMS like nemaska at the mine sites to reduce shipping costs