RE:RE:new presentationWhat I found interesting in the updated dilling pofile is the lengths of the sections sent for assay results
Compare the assay lengths on ST20-11a/B with those of ST20-12 and ST20-14.
The later two are longer which to me suggests that the mineralized zones in the later two holes was considerably longer with much higher grade potential.
As suggested in the presentation the grade of gold at the standby project in the shallower zones may be higher than that found at Homestake, which bodes well for the potential of a tier 1 deposit