Drilling should have started last week From the company's last NR saying they were ready to drill:
2020 Drill Program
MB Silver target:
The first drill target will be in the vicinity of the historic mining and is designed to follow up on the 2006 drill program, which intersected multi-kilogram silver values over significant widths. The first drill target will be in the vicinity of the historic mining and is designed to follow up on the 2006 drill program, which intersected silver values in excess of 1 kg/tonne in 5 holes, including Hole 2006-10 which encountered 5.18 metres of 5258 g/t silver (MTB news release January 30, 2007). The drilling is intended to test for continuity of the high-grade zone both along strike and at depth.
Dorothy target:
The second drill target is the northern extension of the silver-bearing veins onto the recently optioned Dorothy property. On-going geological work, including mapping and structural interpretation, is enhancing the understanding of the mineralization and the orientations of these multiple silver-bearing veins.
Wolfmoon target:
The IP survey focused on the third target – the recently discovered Wolfmoon zone, where 28.5 g/t gold and 1,200 g/t silver were recently discovered in separate rock grab samples (see News Release January 14th, 2020). Surface samples with high grades of gold and silver were identified within an extensive alteration zone, which has recently emerged from ice cover. IP surveys have been useful in a similar geological setting on Ascot Resources Ltd.’s Premier Gold Mine, immediately to the west. The IP survey has helped to identify the orientation and width of the mineralized structures sampled at surface optimizing the prospects of intersecting mineralization with the drilling.
cg