the November Corporate Presentation.............. seems to be the same slide deck as that used in the technical session.
Look at slide 28 of that presentation - in the tech session Manson is discussing this slide (28) at about the 30 to 35 minute mark.
At one point he overlays the slide with a slightly darker pink area which he says is characteristic "main zone" mineralization.
The noteworthy thing though, is that this "main zone" darker pink area extends to the north east well beyond the current limits of the Berry infill drilling area as outlined bt the large red rectangle.
The large red rectangle "Berry" infill zone runs from section 13300E to section 14000E for about a 700 Meter distance.
The newly suggested "main zone" (darker pink) area though, appears truncated and shifted slightly at a point between sections 14300E and 14400E . After this truncation or break in the apparent main zone , the deeper pink zone then is interpreted at extending much furter northeat to about section 14800E for a total interpreted distance of 13300E to 14800E or about 1.5 km total distance.
Potential is reallly opening up here, isn't it?
BG