RE:Concerted pull backLAC is targeted to complete the mine by 2022.. full production by 2024.. there is nothiing up in thacker pass.. a power line and a couple of ranch roads..
the 15 to 30$ range on the stok, is the reflection of the intrinsic value of the permit, and zone for the final mine..