RE:ran across thisspitfireIVX wrote: https://www.epa.gov/uic/uic-class-iii-situ-production-copper-permit-no-r9uic-az3-fy11-1-florence-copper-project-florence
Wonder when they will post something about admendment.
The permit for the test facility was THE PERMIT. The amendment was applied for last summer which expands the test facility permit to a full production permit. So, all that we are waiting for is the approval of the amendment.
This actually was brilliant. Get a small permit for a test facility and convert it with an amendment to the full production permit. Get your nose in the door first, prove viability, and then it should be much easier to finish out.