Onwards and UpwardsThere are 41 production wells. 16 injection and 25 recovery wells arranged in a 5 spot pattern. Beyond that there are further point of compliance wells to ensure hydraulic control and compliance with the APP/UIC. Copper production is a function of flow rate x PLS grade (pregnant leach solution). The 5 spot pattern means acid solution flows from an injection well to numerous recovery wells leaching the copper which is found on the surfaces of the rock fractures. Individual wells will have different flow rates (some high, some low) but what matters is the overall wellfield flowrate and PLS grade.The copper mineral is mainly chysocolla which leaches well. Have a look at the Florence website for announcements and timings for acid break through and leach curves to ramp up to full production in the feasibility. It takes a while but what a great time to be ramping up production into a rising copper price. The project capex was mainly funded by the triple flag stream so there is not a rigid senior secured debt instrument hanging round the neck of management. Covid has disrupted many copper mines. Relax and give the process some more time.