RE:NO PLAN
Actually the plan has been outlined several times in documents and interviews. I was expecting lower q1 based on this info. Right now they are mining some leftover ore that is lower grade and the top part of Argyle I think, which is also lower grade snd it won't be until later in the year when they get to the better ore from argyle. Argyle has about 2 years of production left. The plan is then to move on to stoger tight and zone 278 to feed point rousse. These should be much higher grade deposits. After that, there is a lot of exploration at tilt cove happening. However, I agree that the news release should have laid this out.