RE:It is my suspicion--that----The completed drill program was only 7147.8 metres and even though FCU had a headline of wide mineralisation the mineralised intercepts were not all that great from an "Athabasca Standard" both in grade and length. I am not saying it was bad but from a relative perspective it was nothing really to get that excited about none the less the drilling needs to be done at some point by someone if this deposit is ever going to go into production which I think it will at some point but probably not as an FCU asset (is my prediction).
On behalf of myself an NXE fanboy thanks for the delineation work FCU.
C'mon admit it everyone we all know that the FCU ore will eventually end up in the NXE mill at some point.