RE:RE:RE:Heliostar drills 88.3 g/t gold over 3.05 metres Just thought would post these other results as first timers to this board might not access the companies website yet. Very strong results at nice downhole depths.
Drilling Highlights at Apollo
- APSRC21-02
- 88.3 grams per tonne (‘g/t’) gold over 3.05 metres from 21.35 metres (‘m’) downhole
- SKRC21-03 (500m to the East)
- 7.98 g/t gold (10.0 g/t Aueq) over 4.57 metres from 13.72 m downhole and,
- 1.91 g/t gold (5.20 g/t Aueq) over 4.57 metres from 39.62 m downhole and,
- 8.65 g/t gold (9.09 g/t Aueq) over 10.67 metres from 54.86 m dowhnhole including;
- 19.3 g/t (20.1 g/t Aueq) gold over 4.57 metres from 56.39 m downhole and,
- 10.2 g/t gold (10.3 g/t Aueq) over 1.52 metres from 83.82 m downhole
- 27 holes have been completed at Apollo, definining parallel veins over a strike length of 725 metres and a vertical range of 140 metres. Mineralization remains open in all directions and drilling is ongoing.