RE:realitynofluff wrote: After market liked it.
I did not look. But was there any volume?
We have been procuring equip for over 6 months, yet have yet to do so.
We have been engineeriing for 20 years, yet still r only 60% done.
We have been going to seamlessly get final permit. Yet nothing.
U can not issue a permit that is only 60% done. This is all a big con game.
Show me the data and in one hr I will give u the engineering parameters.
nf
NF. The permit is for the groundwater injection. It is not for the construction of the facility. All of that is a strictly local matter. No EPA involved. Concrete hardness, steel building structural spans, electrolysis tanks etc. None of that is EPA related. All the EPA is permitting is water in the ground and water and and mitigation plans.