RE:RE:RE:RE:RE:RE:RE:Underground gradeDouble current Detour open pit grade. Double the profit. The new MRE has one big open pit. The rock being removed will include some waste rock adjacent to the mineralization. As you know in an open pit scenario they are removing all the material, waste rock as well as productive mineralized rock. Consequently the cut off. Easily twice as profitable as Detour. And open in all directions. In 6 months the MRE will be over 10 million oz. WALLBRIDGE is the BIGGER HIGHER GRADE Detour.