Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

KWG Resources Inc C.CACR

Alternate Symbol(s):  KWGBF | C.CACR.A

KWG Resources Inc. is a Canada-based exploration stage company. It is focused on acquisition of interests in, and the exploration, evaluation and development of deposits of minerals including chromite, base metals and strategic minerals. It is the owner of 100% of the Black Horse chromite project. It also holds other area interests, including a 100% interest in the Hornby claims, a 15% vested interest in the McFaulds copper/zinc project and a vested 30% interest in the Big Daddy chromite project. It has also acquired intellectual property interests, including a method for the direct reduction of chromite to metalized iron and chrome using natural gas. It also owns 100% of Canada Chrome Corporation, a business of KWG Resources Inc., (the Subsidiary), which staked mining claims between Aroland, Ontario (near Nakina) and the Ring of Fire. The Subsidiary has identified deposits of aggregate along the route and made an application for approximately 32 aggregate extraction permits.


CSE:CACR - Post by User

Post by Dragon23on Dec 23, 2021 1:10pm
192 Views
Post# 34258473

Someone comes calling? BHP my guess

Someone comes calling? BHP my guess

RING OF FIRE 10 Million TPA Rail-Veyor to Cost US$657 Million, Designation as Mining Works for Gitchiziibii Company Bond Issue

Toronto, Ontario--(Newsfile Corp. - December 23, 2021) - KWG Resources Inc. (CSE: KWG) (KWG.A) (FSE: KW61) ("KWG" or the "Company") and its subsidiary, Canada Chrome Corporation ("CCC"), are pleased to announce their receipt of an Engineering and Design Services Report from Rail-Veyor Technologies Inc. The report estimates that the capital cost of construction of a Rail-Veyor tramway system designed to transport 10 million tonnes of chromite yearly over 338 kilometres from the proposed underground workings of a potential mine at the Company's Black Horse Project in the Ring of Fire to a potential processing and/or transfer facility near Nakina, Ontario, will be US$656.7 million and that the operating cost will be US$2.88 per tonne. The report states that the estimates in the study are at +/- 25% confidence level.

The Company is also pleased to announce that it is in discussion with newly-incorporated The Gitchiziibii Company Inc., which has recently been formed to, among other things, assist with the creation of a Trust for members of the Matawa and Mushkegowuk First Nations. The Trust is being designed to be endowed with the beneficial interests in infrastructure assets required for mining in the Ring of Fire. The Gitchiziibii Company Inc., KWG and CCC are currently planning an application for designation of a proposed Rail-Veyor ore haulage tramway system as mining works under the Ontario Mining Act in preparation for flotation of a bond issue for construction financing.

About KWG:
KWG is the Operator of the Black Horse chromite project after acquiring a vested 50% interest through Bold Ventures Inc. which is carried for 10% (20% of KWG's equity in the JV) by KWG funding all exploration expenditures. KWG also owns 100% of CCC which staked mining claims between Aroland, Ontario and the Ring of Fire. CCC has conducted a surveying and soil testing program to assess the prospects for the engineering and construction of a railroad along that route between the Ring of Fire and Aroland, Ontario. Currently, CCC has engaged Cormorant Utilities and Rail-Veyor Technologies for completion of Engineering Proposals for the construction of a utility corridor within the route. KWG has also acquired intellectual property interests, including a method for the direct reduction of chromite to metalized iron and chrome using natural gas. KWG subsidiary Muketi Metallurgical LP has acquired two chromite-refining patents in Canada and one in the USA and in South Africa and is prosecuting an application in Turkey.

For further information, please contact:
Bruce Hodgman, Vice-President: 416-642-3575 ~ info@kwgresources.com

<< Previous
Bullboard Posts
Next >>