RE:RE:RE:Slides from Africa Energy Corp looking at 2B geology. The gazania-1 well is a low cost well with gross cost of only 25m$. I do believe they will farm out and if they wont they will need to raise only 15m$, after contracting the drill ship and selecting the orinduik next target and potentially farming out some of the namibian blocks, the mc should be around 300m$ cad, so dillution kept on minimum and the investing company should be aoi so thats a good thing for eco.