RE:US Navy waste systemsSomeone asked “what was the point of this post”, placed me on “Iggy” he says.
Strange?, why ask if you don’t want an answer?
Anyway, there was no point to it really, just informing this board about PYR waste systems that I gathered through the past press releases.
I was not aware or too much informed about it until Uncle mentioned it on a previous post. (I got in after that, with iron ore torches story)
So I looked into it further, continuing my DD, after all, the website has this awesome USA war planes carrier floating on the ocean.
So no point made other then awareness between reality and what is portrayed on this bull board.
Do your DD, read all past releases.
StairwayTo wrote: Signed contract on September 4
th, 2020 for $11.5M
“The systems are expected to be built within the next 18 months”
That brings us to March 2022, assuming that “within 18 months” was without hiccups. But we know what happened with the “within 6 months” don’t we ?,
Anyway, I don’t see that these 2 systems are even delivered yet, it could be another 6 months with all the delivery delays and covid etc..
Then, maybe by January 2023, the Navy will certainly proceed with SAT (Site Acceptance Test).
They have lots of time, these carriers are not to sail until 2028 and 2032.
On the bright side, it might be the next NR; “Following our 9/4/2020 NR we are pleased to announce the first delivery 1 waste system to the US Navy”.
Some of you might freak out when they announce it, cause some of you seems to think that these 2 systems are on board and sailing as we speak.
(As for the previous contracts to the Navy, 2018 and 2019 totaling less than $1M, they were clearly not the same waste destruction systems)
Previous post: PyroGenesis Signs $11.5MM Contract for US Navy’s Two Ship Build; $4.8MM Down Payment; MONTREAL, Quebec (GlobeNewswire – September 4th, 2020) The Systems are expected to be built within the next 18 months, and are to be installed on the next Gerald R. Ford-class US aircraft carriers; the USS Enterprise (CVN-80) and the USS Doris Miller (CVN-81). USS Enterprise (CVN-80) will be the third
Gerald R. Ford-class aircraft carrier to be built for the
United States Navy.
[4][5] She will be the ninth United States naval vessel and third aircraft carrier to bear
the name, and is scheduled to be in operation by 2028.
USS Doris Miller (CVN-81) is a future
Gerald R. Ford-class aircraft carrier of the
United States Navy.
[6][7] Doris Miller is scheduled to be
laid down January 2026,
launched October 2029 and
commissioned in 2032. She will be built at
Newport News Shipbuilding, a division of
Huntington Ingalls Industries (formerly
Northrop Grumman Shipbuilding) in
Newport News, Virginia.
[4