Kibby Lithium Project in Nevada generates optimism.MarqueeCommences Drilling-Kibby Basin Lithium Project, Nevada•Marquee commences drilling at the highly anticipated Kibby Lithium Project in Nevada. TheProject is fully permitted for water extraction forthe use ofbrine processing and production of lithium compounds within the 2,560 acres (~10.35sqkm) Project,a key feature should a Large-Scale brine and clay lithium depositbe identified.•The two (2)stage drill program for a total 3,000metres across three(3)drill holes will target a highly conductive geophysical anomaly, which has the signature for a potential lithium enriched aquifer beneath the Kibby Playa (dried lakebed).•The Project is located ~4 hours from Tesla’s Gigafactory Number 1 and ~50kmsnorth of ASX-listed Ioneer Ltd's(ASX: INR) flagship Rhyolite Ridge Lithium-Boron Project which has recently been Joint Ventured with Sibanye Stillwater Limited (Sibanye-Stillwater) to develop the project, with Sibanye-Stillwater contributing US$490 million for a 50%interest in the Joint Venture.•The setting of the Kibby Valley is a 7.4km long structure identified with characteristics interpreted to be akin to major structures bounding the south side of Clayton Valley, indicatinga basin large enough to develop layers that could act as aquifers,as well as allow for development of a favourable hydrogeologic setting to host lithiumbearing brines.Marquee Resources Limited (Company or Marquee) (ASX: MQR) is pleased to announce that drilling at the highly prospective Kibby Basin Lithium Project(Project)in Nevada, USA has commenced.The two (2) stage –3,000metre drill program across three drill holes will target a highly conductive geophysical anomaly, which has the signature for a potential lithium enriched aquifer beneath the Kibby Playa (dried lakebed).Figure 1 -Kibby Basin Section and Proposed Drill Holes