13 Holes And More Coming . Bring It.To date in 2022, the Company has completed 13 holes from 9 sites for 1,850 metres at Lappvattnet with drilling continuing. Initial assays from 2022 are expected in the coming weeks. Most of the drilling has been directed at areas below and down plunge of Gungnir's 2021 drill program which produced several hits of high-grade and wide-grade nickel mineralization over a strike length of approximately 140 metres (see below).