So tell me where this is from, buck.Sorry it came out this garbled, but I invite you to go t sedar and read the Queensway 43-101.
It's interesting. Have fun.
Bdog
Table 1–1. Summary of Phase 1 recommendations and estimated costs. Type of program Summary of components Estimated Cost ($C) Geophysics & Interpretation $8,415,000 QWN − Direct Current Induced Polarization survey $750,000 QWN − 3D seismic survey $7,000,000 Geophysical interpretation $300,000 Geological interpretation and modelling $300,000 Gander Lake bathymetry survey $65,000 Surface Exploration $1,620,000 QWS − Prospecting and geological mapping $1,000,000 QWS − Till program $200,000 QWS − Soil program $400,000 QWS − Trenching $350,000 QWN − Keats trenching $150,000 QWN − Joe Batt’s Pond trenching $150,000 Environmental and Social $1,100,000 Aquatics (streams and pond baseline studies) $100,000 Water monitoring program $250,000 Flora and fauna surveys $100,000 Seasonal 3D ground water modeling $100,000 Habitat studies $50,000 Incidental wildlife studies $50,000 Socioeconomic studies $100,000 Reclamation options $350,000 Drilling $62,900,000 QWN − AFZ and JBPFZ diamond drilling $56,180,000 QWS − Greenwood and Paul’s Pond diamond drilling $3,180,000 Twin Ponds − Diamond drilling $1,590,000 QWN − JBPFZ RC drilling $1,950,000 Analytical Procedures $190,000 PhotonAssays and screen fire assay comparison $100,000 Lab density measurements for gamma-gamma calibration $65,000 Gold grain size study $25,000 PHASE 1 TOTAL (with 15% contingency) $86,000,000