drilling at 2750 adding to new 43-101at Storm counting the 17 Historic previous holes and 9 new drilled from last summer is detailing a large high grade surface deposit just at the 2750 zone..
Looking at a checker board seeing the black and red squares,.Add the 330 Ft @ /2.5 % cu.
into a black center square. The in-fill drilling done with 9 holes will now be added to the checker board following the pattern seen here on slide showing the placement of last summer drilling.
The 9 holes should be added into the red squares around the ceter black hole/ Now add the 17 historic holes into the black squares around the center 330 ft square and you shoud see a pattern here of Continuity of copper.. Notice spacing of continuity at surface seen here between the yellow dots and 100 m distance scale..
The 330 ft x 300 ft x 300 ft = 27,million cubic feet
27,000,000 div by 15 = 1,800,000 tons of ore
1,800,000 TONS DIV BY 33 TNS = 55,000 TONS OF CONCENTRATE
55,000 X $ 6,000 PER TON = $ 325 MILLION..JUST FROM 2750 ZONE ..
10 THO M OF of infill drilling will establish a large surface ORE body....
.t.”
Figure 1: Plan view of the 2750N Zone showing drilling and gossans over aerial photography. Stated drill hole intersections are all core length, and true width is expected to be 60% to 95% of core length.