Trading at 90% discount!PAK PROJECT PEA ECONOMICS
An engineering economic model was prepared for the Project to estimate annual cash flows and assess sensitivities to certain economic parameters. The economic results of this report are based upon the services performed by BBA E&C Inc, Nordmin Engineering Ltd., JAC Mining Consultants and Frontier Lithium. The Project includes two open pits, surface infrastructure to support the mine operations (maintenance and office facilities), water management features, a run-of-mine stockpiling area, processing facility, a tailings storage facility and a chemical plant. The Project indicates an after-tax cash flow of $3.51 billion, after-tax NPV (8%) of $0.97 billion, and after-tax IRR of 21%.
We are trading at the moment at more than 90 % discount accordint to the last Project PEA conomics.....
Cheers