Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Thermal Energy International Inc V.TMG

Alternate Symbol(s):  TMGEF

Thermal Energy International Inc. provides energy efficiency and emissions reduction solutions to the fortune 500 and other multinational companies. It operates primarily in North America and Europe but also sells its products and services through representative agents throughout the rest of the world. It markets, sells, engineers, fabricates, constructs, installs and supports two technology lines, such as heat recovery solutions, including direct contact heat recovery solutions (FLU-ACE), indirect contact heat recovery solutions (HEATSPONGE and SIDEKICK), and condensate return system solutions (GEMTM steam traps). It is also developing several other technology lines, including low temperature biomass drying systems (DRY-REX). Its solutions can recover up to 80% of energy lost in typical boiler plant and steam system operations. It has two primary operational bases of operation, one in Ottawa, Canada and the other in Bristol, United Kingdom, covering Europe and the rest of the world.


TSXV:TMG - Post by User

Post by proneon Dec 08, 2023 9:15am
81 Views
Post# 35774603

What the PDAs includes reflects the climate requirements ..

What the PDAs includes reflects the climate requirements ..---->

What TMG engineers do at client sites to reduce their..

Carbon Footprint.

---> The comprehensive environmental and energy solution analysis being undertaken by Thermal Energy’s engineering team will involve the preliminary design of the heat recovery system, an operational evaluation of the client’s existing boilers, gas turbine, Central Heating Plant, and relevant district heating and HVAC systems.

---> Thermal will also audit and review existing thermal energy production and heat distribution systems to determine the energy savings achievable as a result of implementing different solution options.

--->Thermal will also determine the capital costs and the corresponding project schedules, perform an economic and financial analysis for the optimum solution option selected and prepare preliminary engineering design including schematic and scale layout drawings.

<< Previous
Bullboard Posts
Next >>