Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Aecon Group Inc T.ARE

Alternate Symbol(s):  AEGXF

Aecon Group Inc. is a Canada-based construction and infrastructure development company. The Company delivers integrated solutions to private and public sector clients throughout Canada and other countries. It operates through two segments within the infrastructure development industry: Construction and Concessions. Its Construction segment includes all aspects of the construction of both public and private infrastructure, primarily in Canada, and internationally and focuses primarily on the civil infrastructure, urban transportation solutions, nuclear power infrastructure, utility infrastructure and industrial infrastructure. Its Concessions segment include the development, financing, build and operation of construction projects primarily by way of public-private partnership contract structures, as well as integrating the services of all project participants. The Company’s projects include Annacis Water Supply Tunnel, Bell Canada Gigabit Fiber Service, Finch West LRT, and others.


TSX:ARE - Post by User

Post by Gabrielon May 23, 2024 5:43pm
128 Views
Post# 36054816

Finch literally completed

Finch literally completed

https://youtu.be/w2PqIsFRUTs


https://www.metrolinx.com/en/news/major-vehicle-testing-milestone-on-finch-west-lrt

 

LRV approaching Westmore Stop

Major vehicle testing milestone on Finch West LRT

  • Press Room
  • Major vehicle testing milestone on Finch West LRT

JUMP TO

SHARE

Light rail vehicles travel along the entire Finch West route for the first time. 

Significant progress and construction milestones continue to take place for the Finch West LRT project.

The most recent and notable being the first ever test trip by Finch West LRT vehicles across the full alignment, with trains being able to safely reach speeds of up to 60 km/h.

This is a major milestone which brings the Finch West LRT closer to completion and opening.

What else goes on during vehicle testing?

Crews are looking at a wide variety of systems and functions including how the vehicle moves, how communications systems perform, doors opening and closing properly, overhead electrical connectivity, and power transfers, as well as seeing how the vehicles perform while accelerating and braking.

Testing a light rail vehicle on the Finch West LRT

Testing a light rail vehicle on the Finch West LRT. (Metrolinx photo)

More milestones and progress

On top of vehicle testing, a lot of exciting progress is happening on this project.

• The overhead catenary systems providing power to the line along with rail is completed

• All 116 pedestrian canopies have been installed with the finishing touches being put on each stop

• The full fleet of 18 light rail vehicles have been delivered to site and are currently being housed at the maintenance and storage facility

Safety during vehicle testing

With testing and commissioning ramping up, residents and commuters will notice an increase in light rail vehicle traffic across the Finch West LRT route.

During testing, there will be extra police officers and construction crews to assist with traffic flow to allow the trains to move through intersections safely, as well as assisting with pedestrian traffic.

More safety info to keep in mind:

• Please don’t enter the track area on foot, with a bike or when driving – it’s prohibited at all times

• Wait until an oncoming light rail vehicle clears the intersection before crossing

• While the vehicles are being tested, their doors will be opening and closing, similar to regular operations. Please do not board a transit vehicle during testing.


<< Previous
Bullboard Posts
Next >>