RE:RE:RE:Q2 contractsExcept this time, he did not mention “imminent”, that might explain the drop in sp. LOL
StairwayTo wrote: I would have like him to elaborate on his 2 statements, especially on a live webcast, but instead he went on to talk at length about a potential large contract that could take place in 2026-2027.
Deja-Vu?
StairwayTo wrote: So does anybody knows what the CEO was talking about?
All these contracts in Q2?
StairwayTo wrote: I’m assuming many of you listened to the Webcast today.
Can someone explain what the CEO was referring to when he mentioned;
“Contracts in Q2 came one after another” and later one “large numbers of contracts in Q2”
I can only see 2 contracts, 1 for $1.3M for Development and supply of thechnology and the second for $2.5M for engineering, design, and fabrication of a thermal swing adsorption (“TSA”) .
Was there some contracts not press released?