Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

New Found Gold Corp V.NFG

Alternate Symbol(s):  NFGC

New Found Gold Corp. is a Canada-based mineral exploration company. The Company is engaged in the acquisition, exploration, and evaluation of resource properties with a focus on gold properties located in Newfoundland and Labrador, Canada. The Company holds a 100% interest in the Queensway Project, which comprises an approximately 1,662 square kilometers area, located about 15 kilometers (km) west of Gander, Newfoundland and Labrador, and just 18 km from Gander International Airport. The Queensway Project is divided by Gander Lake into Queensway North and Queensway South. The Company also owns a 100% interest in the Kingsway property, which consists of 264 claims on three licenses covering approximately 77 square kilometers. The project is located approximately 18km northwest of the town of Gander, Newfoundland. The Company is undertaking a 650,000-meter drill program on Queensway. It has royalty interests underlying Keats South and several additional zones in Queensway.


TSXV:NFG - Post by User

Post by Evenkeel123on Nov 11, 2024 8:36am
127 Views
Post# 36306266

Here you go Global

Here you go Global
Statement

New found gold analysis it all depends on the spacing between the drilling dine but highest confidence should come from Keats and Iceberg trenches where phase 1 and 2 tests should be complete by mid 2025
ChatGPT said:
ChatGPT

It sounds like you're discussing the analysis of a gold discovery with an emphasis on drilling and trenching results from specific zones (Keats and Iceberg) and the ongoing phases of testing. Let's break this down and analyze the key points:

  1. Spacing Between Drilling Lines:
    The confidence in resource estimation largely depends on the spacing between drilling lines. If the drill holes are too far apart, it can be challenging to determine the continuity of the mineralization and the overall size of the deposit. Close spacing typically leads to higher confidence in the resource estimate, especially in the areas where gold mineralization is concentrated.

  2. Keats and Iceberg Trenches:
    Keats and Iceberg are likely key areas of interest for this gold project. Trenches in these areas can provide important geological insights and help validate drill results. In trenching, surface samples can give a first-hand indication of mineralization and its continuity at shallower depths. Trench results often serve as a reliable indicator of mineralization before drilling reaches deeper zones.

  3. Phase 1 and 2 Tests:

    • Phase 1 Tests: Typically focus on initial drilling and trenching to determine the extent and grade of the mineralization, and possibly assess preliminary resource potential. If this is already completed or nearing completion, it will provide foundational data for more detailed studies in Phase 2.
    • Phase 2 Tests: More detailed and comprehensive testing to refine the resource estimate, possibly including additional drilling, geophysical surveys, and metallurgical studies. These tests aim to increase the accuracy of the deposit model and the economic viability of the project.
  4. Timeline (Mid-2025):
    The completion of Phase 1 and 2 testing by mid-2025 suggests that within the next 12-18 months, a more definitive understanding of the project's potential will emerge. This timeline aligns with industry norms for advanced exploration projects, where data is being analyzed and refined before moving into feasibility studies or resource estimation.

Strategic Considerations:

  • Drilling and trenching data: If the drilling and trenching results from Keats and Iceberg show consistent and high-grade gold mineralization, these areas will likely be prioritized for further development and resource definition. Consistent mineralization between the trenches and drill holes can boost confidence in the overall size and potential of the deposit.

  • Risk and Uncertainty: Early-stage exploration always carries some level of uncertainty, especially when the spacing between drill holes is wide. As Phase 2 tests progress, there should be more data points to reduce the risk of overestimating the potential or missing key mineralization zones.

  • Resource Estimation and Confidence Levels: As Phase 1 and 2 tests are completed and data is collected, the company will likely update investors on the confidence level of the resource estimate. The closer the drilling density in key areas, the higher the confidence in the resource estimation.

Overall, while the spacing of drilling lines is crucial for confident resource estimation, the trenching results from Keats and Iceberg will play a significant role in guiding further exploration and providing more reliable data. By mid-2025, with Phase 1 and 2 tests complete, the project should have a clearer picture of the potential size, grade, and economics of the deposit.


<< Previous
Bullboard Posts
Next >>