IFR is within sight of the Golden EyeSee below:
SPECIFICATIONS - GOLDENEYE GAS PLATFORM, NORTH SEA NORTHERN, UNITED KINGDOM
Key Data
Name Goldeneye
Operator Shell
Area North Sea
Located 100km northeast of St Fergus
Basin South Halibut Basin of the Outer Moray Firth
Discovery October 1996
Discovery well 14/29a-3
Block Mostly block 14/29, 14/28b, 20/30b and 20/4b
Equity Shell: 52.5 % (Operator), Esso: 39%, Lasmo: 4.5%, Paladin: 3%, Veba: 1%.
Platform Normally Unattended Installation (NUI)
Legs 4
Weight 3,500t
Piles eight
Weight 2,500t
Topsides 1,000t
Equipment Wellhead/MEG injection equipment , detection, measurement, control facilities.
Equpiment 12-man overnight accommodation as lifeboat safety equipment
Equipment crane
Equipment Lifeboat
Pipeline to shore 105km
Diameter Export 20in gas condensate line.
Drilling 5 wells
Reservoir Llower cretaceous Captain sandstone
Production more than 100mmscf/day/well.
Water depth 120m of water.
Depth 8,300 ft TVD, 9,000 and 15,000ft measured
Plateau production 300mmscf/d wet-gas, 10,000b/d condensate
Field life Seven and ten years
(source: Shell UK)