Post by
frankman on Jul 09, 2021 12:30pm
Just had a chat with Mr Halleran
I wanted to confirm the Saturn rig could be adjusted for the drilling of the two wells to be drilled in shallow waters. He gave me a detailed answer however it will be adjusted via hydraulics. The two discovered unproduced gas pools Alapli and Bayhanli, both of which were drilled, mapped, and drill stem tested +7 MMcf/d gas from similar 15 metres of perforated gas reservoirs. Both discover wells had an additional 4 to 5 gas reservoirs that were not tested adding further gas potential. These first two wells are the immediate goal.
Comment by
doggiestyle on Jul 09, 2021 5:59pm
Thanks for sharing Frankma anytjing else of interest from your chat? When are we expecting an update on the financing ? cheers