Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Bullboard - Stock Discussion Forum High River Gold Mines Ltd HRIVF

GREY:HRIVF - Post Discussion

High River Gold Mines Ltd > HUNT FOR RED OCTOBER
View:
Post by cjsell on Sep 27, 2012 5:34pm

HUNT FOR RED OCTOBER

NORDGOLD is doing a "CRAZY IVAN" they have had this info for the past 3 weeks. I wonder what the numbers would look like if they lowered the cut-off's. So when you do the math, you get really close to 300,000 oz of proven & probable. So YEARS of continued production. Then add 100,000 from BISSA.

CJ

High River Announces Updated Reserve and Resource Estimate and Files Technical Reports for Irokinda and Zun-Holba

Press Release: High River Gold Mines Ltd.

The Technical Reports audit and convert the results of the exploration work of High River for both projects into mineral resources and mineral reserves that comply with both the Australasian Joint Ore Reserves Committee and the Canadian Institute of Mining, Metallurgy and Petroleum. The Technical Reports are compliant with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Highlights

The updated reserves and resources estimates as of April 1, 2012 for:

  • The Irokinda mine
    • 226,000 tonnes of ore with 11.34 g/t gold grade resulting in 2,570 kg of proven and probable gold reserves
    • 692,900 tonnes of ore with 9.68 g/t gold grade resulting in 6,700 kg of measured and indicated gold resources
    • 203,600 tonnes of ore with 10.23 g/t gold grade resulting in 2,100 kg of inferred gold resources
  • The Zun-Holba mine
    • 889,000 tonnes of ore with 8.54 g/t gold grade resulting in 7,600 kg of proven and probable gold reserves
    • 712,900 tonnes of ore with 11.03 g/t gold grade resulting in 7,800 kg of measured and indicated gold resources
    • 91,900 tonnes of ore with 10.73 g/t gold grade resulting in 1,000 kg of inferred gold resources

Mineral Resource/Reserve Estimates

Mineral resources and reserves have been estimated and classified according to the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (2004) (the "JORC Code") and the CIM Standards on Mineral Resources and Reserves - Definitions and Guidelines (November 2010) (the "CIM Guidelines"). Wherever in this press release the term reserves appears in quotations ("reserves" or "operational reserves") it refers to reserve estimates conducted according to the Russian classification system or terminology. The Technical Reports convert the Russian "reserves" into JORC and CIM compliant mineral resources and reserves.

Irokinda

A summary of the current mineral reserve and resource estimates for the Irokinda mine are shown in the tables below.

Mineral Reserve Estimate (April 1, 2012)
Tonnes Au g/t Au, kg
Proven 225,000 11.36 2,560
Probable 1,000 6.59 10
Proven + Probable 226,000 11.34 2,570
Mineral Resource Estimate (April 1, 2012)
Tonnes Au g/t Au, kg
Measured 319,600 12.67 4,050
Indicated 373,300 7.12 2,650
Inferred 203,600 10.23 2,100
Measured + Indicated 692,900 9.68 6,700

The current exploration-mining parameters used at the Irokinda mine are:

  • The minimum (cut-off) gold grade in marginal intersections to delineate the mineralized zones along strike and dip, as well as in the samples taken to outline the width of the mineralization or vein, is 3 g/t gold.
  • The minimum gold grade in an estimated block is 6.8 g/t gold.
  • The minimum mining width included in a "reserve" estimate is 1 m and, in the case of smaller widths, corresponding grade x thickness values (3.0 m and 6.8 g/t gold) are to be applied to determine if the areas with smaller widths can be included.
  • The maximum low grade mineralized vein (zone) strike extension included in an estimated "reserve" outline is 12 m.
  • The cut-off gold grade necessary to delineate off-balance "reserves" is 1 g/t gold.
  • The minimum mineralized vein width needed to estimate off-balance "reserves" is 1 m.

Zun-Holba

A summary of the current mineral reserve and resource estimates for the Zun-Holba mine are shown in the tables below.

Mineral Reserve Estimate (April 1, 2012)
Tonnes Au g/t Au, kg
Proven 505,300 9.06 4,600
Probable 383,700 7.85 3,000
Proven + Probable 889,000 8.54 7,600
Mineral Resource Estimate (April 1, 2012)
Tonnes Au g/t Au, kg
Measured 451,600 11.36 5,100
Indicated 261,300 10.45 2,700
Inferred 91,900 10.73 1,000
Measured + Indicated 712,900 11.03 7,800

The current exploration-mining parameters used at the Zun-Holba mine are:

  • Cut-off grade of 3 g/t gold to outline the boundaries of the mineralized zones.
  • Minimum gold grade of 7 g/t over a mineralized zone composite intercept.
  • Minimum mining thickness of 0.8 m. When thickness is less, but the gold grade is higher it is recommended to use the metrogram.
  • Maximum thickness of 3.0 m for waste rock and low grade mineralization being included in the "reserve" estimation.

Data Verification

William J. Lewis, B.Sc., P.Geo., Tania Ilieva, P. Geo., and Barnard Foo, P.Eng., employed by Micon, are "qualified persons" as defined by 43-101 and, as qualified persons, completed the verification of data on which the above mineral reserve and resource estimates were based. This verification included a site visit to both Irokinda and Zun-Holba and a review of the resource block model, including a review of the cut-off grade, estimation procedures, capping of high grade assays and block estimation protocols. In addition, a review of the spreadsheets of tabulated Russian "reserves" for each vein and by polygon block was undertaken to verify the following:

  • The appropriate methodology and parameters had been used to estimate the in-situ geological resources.
  • The methodology and parameters for the quantities of dilution and recovery of the broken material within the stoping areas were appropriate and had been applied correctly.
  • The estimates had been recorded correctly.
  • The summary tables had correctly listed total tonnages, grades and contained metal within the "reserve" categories.
  • The classification of the "reserves" had been applied in a consistent manner throughout the estimation process.
  • The reconciliation between the "reserves" and the mine and mill production provided support for the validity of the reserve estimate.

A detailed block-by-block review of the Russian classified "reserves" was conducted, along with a review of the parameters by which these were converted to "operational reserves." Discussions were also held as to the appropriate category in which to place the individual blocks according to the JORC and CIM classification system.

Micon concluded that the Russian estimate, as audited by Micon, had been reasonably prepared and could be used as the basis for the conversion of the Russian "reserves" into mineral resources and the Russian "operational reserves" into mineral reserves which conform to both the current JORC code and CIM standards and definitions

Qualified Person

William J. Lewis, B.Sc., P.Geo., Tania Ilieva, P. Geo., and Barnard Foo, P.Eng., employed by Micon, are the qualified persons responsible for supervising the preparation of the Technical Reports and have reviewed and approved the scientific and technical information included in this press release. Each qualified person is independent of High River.

Cautionary Note

The grades presented in the above tables are not meant to imply recoverable gold. Mineral resources and reserves have been estimated and classified according to the JORC Code and the CIM Guidelines. High River is not aware of any known environmental, permitting, legal, title, taxation, socio-economic, marketing or other relevant issues that could potentially affect the estimate of mineral resources or reserves. The mineral resources and reserves may be affected by subsequent assessments of mining, environmental, processing, permitting, taxation, socio-economic and other factors.

About High River

High River is an unhedged gold company with interests in producing mines, development and advanced exploration projects in Russia and Burkina Faso. Two underground mines, Zun-Holba and Irokinda, are situated in the Lake Baikal region of Russia. Two open pit gold mines, Berezitovy in Russia and Taparko-Bouroum in Burkina Faso, are also in production. Finally, High River has a 90% interest in a development project, the Bissa gold project in Burkina Faso, and a 50% interest in an advanced exploration project with NI 43-101 compliant resource estimates, the Prognoz silver project in Russia.

FORWARD LOOKING INFORMATION

This release contains forward-looking statements. Wherever possible, words such as "intends", "expects", "scheduled", "estimates", "anticipates", "believes", and similar expressions or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, have been used to identify these forward-looking statements. Although the forward-looking statements contained in this release reflect management's current beliefs based upon information currently available to management and based upon what management believes to be reasonable assumptions, High River cannot be certain that actual results will be consistent with these forward-looking statements. A number of factors could cause events and achievements to differ materially from the results expressed or implied in the forward-looking statements. These factors should be considered carefully and prospective investors should not place undue reliance on the forward-looking statements. Forward-looking statements necessarily involve significant known and unknown risks, assumptions and uncertainties that may cause High River's actual results, events, prospects and opportunities to differ materially from those expressed or implied by such forward-looking statements. Although High River has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors and risks that cause actions, events or results not to be anticipated, estimated or intended, including those risk factors discussed in the Company's 2011 Annual Information Form. There can be no assurance that the forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, prospective investors should not place undue reliance on forward-looking statements. Any forward-looking statements are made as of the date of this release, and High River assumes no obligation to update or revise them to reflect new events or circumstances, unless otherwise required by law.

Contact:
High River Gold Mines Ltd.
Yury Lopukhin
CEO
011 7 495 981 0910 ext. 6821
info@hrg.ca
www.hrg.ca
Comment by discern1 on Sep 27, 2012 5:55pm
I get about 24000 kg adding reserves and resources together for over 800K ounces.
Comment by 1marketmaker on Sep 27, 2012 7:48pm
The cut off is a joke.  
Comment by cjsell on Sep 27, 2012 9:55pm
I plugged the numbers into my Li'L Tykes super computer and it thinks there are 32.15 troy OZ per Kilo.  So below is the data!  Yes I agree, the cut-off seems a bit high for underground mines.  Perhaps others could offer some insight.  Also, bear in mind, these are the minimum numbers and very conservative, if the grades are higher, or tonnage is ...more  
Comment by discern1 on Sep 27, 2012 10:19pm
cjsell   we are on the same team.  Are you adding the reserves/resources of both mines ?     The Irokinda mine: 226,000 tonnes of ore with 11.34-gram-per-tonne-gold grade, resulting in 2,570 kilograms of proven and probable gold reserves; 692,900 tonnes of ore with 9.68-gram-per-tonne-gold grade, resulting in 6,700 kilograms of measured and indicated gold ...more  
Comment by peego on Sep 28, 2012 1:07am
LOL... the cut off grades are a fakking joke!   If more "normal" cut off grades were used, the resources would be way higher than what they're reporting. Another pathetic attempt by the russians to making things look worse to supress the share price.   I wouldn't be surprised to see a MASSIVE upward revision of reserves and resources if they successfully steal all of ...more  
Comment by cjsell on Sep 28, 2012 8:48am
Ops, the li'Tykes super computer had a really bad virus.  YES I concur 892,280 OZ as at April 2012.  Guess I can re-order the 911 this morning~ CJ  
The Market Update
{{currentVideo.title}} {{currentVideo.relativeTime}}
< Previous bulletin
Next bulletin >

At the Bell logo
A daily snapshot of everything
from market open to close.

{{currentVideo.companyName}}
{{currentVideo.intervieweeName}}{{currentVideo.intervieweeTitle}}
< Previous
Next >
Dealroom for high-potential pre-IPO opportunities