Post by
nozzpack on Jun 03, 2021 7:22am
Adumbi Drilling Results Qualifying for Tier 1
-
Holes below the proposed Pit shell include LADD009 - 32.15 m @ 6.17 g/t (including 1.46 metres @ 94.77 g/t gold) and 15.36 metres at 3.73 g/t gold (including 5.89 metres at 6.56 g/t gold)
-
Grades appear to be increasing with depth
-
Aim - To add significant ounces in line or better than Kibalis’ underground intercepts (+4 g/t grade, +10 metre wide), with a target of creating a Tier 1 deposit
The above is from the new presentation which uses Kibali underground intercepts as the standard for Tier 1 Adumbi rating ( (+4 g/t grade, over +10 metre wide)
So far only one hole has been drilled beneath the pit shell meets those guidelines........32.15 m @ 6.17 gms/ton and 15.36 metres at 3.73 g/t gold
Two more holes coming soon..
Be the first to comment on this post