Shepard Energy Centre is an 800MW gas fired power project. It is located in Alberta, Canada. The project is currently active. It has been developed in single phase. The project construction commenced in 2011 and subsequently entered into commercial operation in March 2015.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 800 800 Active Alberta, Canada  


Description
 

The project is co-owned by Capital Power and Enmax Green power, with their respective ownership stake of 50% each.

 

It is a Combined Cycle Gas Turbine (CCGT) power plant.

The project cost is $1,400m.


https://www.power-technology.com/marketdata/shepard-energy-centre-canada/?cf-view

***

- other AB ANCHOR generating units:

Jan 14, 2024 15:38

Genesee #3 unit is DUAL Coal and/or Natural Gas
 

DUAL FUEL

ASSET

MC

TNG

DCR

Genesee #3 (GN3) 466 465 0
COAL

ASSET

MC

TNG

DCR

Genesee #1 (GN1) 400 405 0
Genesee #2 (GN2) 420 413 0


- so BASICALLY; NG, COAL and the two large HYDRO units are KEEPING the Alberta GRID ENERGIZED during this BLISTERING COLD SPELLL