Post by
Yajne on Aug 06, 2023 10:50pm
KPI's
Although they announced several KPI's, the flow rate is the one that I will be most focussed on, which will confirm how economically they can extract the lithium. This is why IMO it will take a few days to properly tune the process before they can confirm the DLE success we expect very soon. GLTA longs!!
KPI: flow rate ratio greater or equal to 3 (Brine flow rate divided by the system volumetric capacity)
Flow Rate: The flow rate ratio is a measure of the rate at which the lithium can be extracted from the brine within a fixed capacity. The higher the ratio, the smaller the DLE commercial plant required, which is a proxy for the capital costs of this system.
Comment by
NoBigDealbcl on Aug 07, 2023 9:14pm
Agree flow rate is very important. Expecting good results.