PEA Parts Required
The PEA is quick and cheap if you have all the pieces. Yes you need the resource and the metallurgical process to be used. You also need to estimate mining costs based on the shape and size of the deposit(s) and realistic pit slopes. You need a location for waste rock and a location for talings and their costs to create and maintain. You need an estimate of the cost of the recovery plant to build and operate.
Comment by
TeckPro on Jan 15, 2024 12:42pm
OMG, you are still @ 17 likes and NO MTT - :)))
Comment by
Larry60 on Jan 15, 2024 3:02pm
I gotta believe they already have internal scoping studies that deal with those items. THe only one they may have let lie dormant is the met. I hope note, but they may be waiting to find the right process before they lay it out in a scoping study. Late spring or early summer if they want to.
Comment by
highper on Jan 15, 2024 3:59pm
ken covers the topic in the presentation and follow up q and a