2014: A Year of Record Annual Production
TSX: ELD NYSE: EGO
VANCOUVER, Feb. 19, 2015 /CNW/ - Eldorado Gold Corporation, ("Eldorado"
or "the Company") is pleased to announce the Company's financial and
operational results for the year ended December 31, 2014. Eldorado
reported record gold production of 789,224 ounces (2013: 721,201 oz) at
an average cash cost of $500 per ounce (2013: $494/oz). Adjusted net
earnings for 2014 were $138.7 ($0.19 per share) compared to $192.9
million ($0.27 per share) in 2013.
"This past year was another milestone for the Company and our
employees," said Paul Wright, Chief Executive Officer of Eldorado Gold.
"We achieved record total gold production of nearly 800,000 ounces of
gold at industry leading cash costs of approximately $500 per ounce.
We made significant progress at Skouries, with the SAG and ball mill
installations now complete and the tailings dam construction well
underway. All of our mines delivered solid operational results, and
the same can be said for our employees who continue to work safer and
smarter. With approximately $875 million in total liquidity at
year-end, our balance sheet remains one of the strongest in the
industry, allowing us to internally fund our robust growth pipeline."
2014 Financial and Operational Highlights
-
Gold production of 789,224 ounces (including production from tailings retreatment at Olympias), in-line
with original 2014 guidance of 730,000-800,000 ounces of gold.
-
Adjusted net earnings of $138.7 million ($0.19 per share). Net profit attributable to shareholders of the Company was $102.6
million ($0.14 per share).
-
Gold revenues were $980.9 million on sales of 774,522 ounces of gold at an average realized gold price of $1,266 per ounce.
-
Liquidity of $876.3 million, including $501.3 million in cash, cash equivalents and term deposits,
and $375.0 million in unused lines of credit.
-
All-in sustaining cash costs averaged $779 per ounce; cash operating costs averaged $500 per ounce.
-
Significant developments at Skouries: mechanical installation of the SAG and ball mills complete;
construction of the tailings dam began in the fourth quarter.
-
Feasibility Study at Certej underway with completion slated for the second quarter of 2015.
Throughout this press release we use cash operating cost per ounce,
total cash costs per ounce, all-in sustaining cost per ounce, gross
profit from gold mining operations, adjusted net earnings and cash flow
from operating activities before changes in non-cash working capital as
additional measures of Company performance. These are non IFRS
measures. Please see our MD&A for an explanation and discussion of
these non IFRS measures. All dollar amounts in US $, unless stated
otherwise.
|
Reserves and Resources
The Company ended 2014 with proven and probable gold reserves of 662
million tonnes at 1.22 grams per tonne gold containing 26 million
ounces. The 6.4% decrease in gold reserves was driven by depletion
from mining during the year and a pit redesign at Kisladag (which led
to a 9% decrease in its proven and probable in-situ gold ounces
relative to the 2013 reserves). The two operations that replaced
depletion and added new reserves were White Mountain and Jinfeng.
|
|
|
|
|
|
|
Million Ounces
|
Proven and probable in-situ gold ounces as of January 1, 2014
|
|
|
27.73
|
Mined ounces including mining depletion during 2014
|
|
|
(1.16)
|
Net discovered ounces and converted resources during 2014
|
|
|
0.42
|
Net decrease due to engineering
|
|
|
(1.04)
|
Proven and probable in-situ gold ounces as of December 31, 2014
|
|
|
25.95
|
The complete mineral reserve and mineral resource data can be found at
the end of this news release and includes the data for tonnes, grades
and ounces.
During 2014, a total of $33.8 million was spent on exploration,
including capitalized exploration costs. Exploration drilling during
the year totaled approximately 58,000 meters and was conducted on 22
projects including early-stage exploration projects, resource
definition projects, brownfields exploration, and in-mine exploration
across Turkey, China, Brazil, Greece and Romania.
2014 Financial Results
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2014 ($ millions except as noted)
|
|
Q1
|
|
|
Q2
|
|
|
Q3
|
|
|
Q4
|
|
|
2014
|
|
|
2013
|
Revenues
|
|
279.9
|
|
|
265.5
|
|
|
263.5
|
|
|
259.0
|
|
|
1,067.9
|
|
|
1,124.0
|
Gold revenues
|
|
247.6
|
|
|
247.6
|
|
|
241.2
|
|
|
244.5
|
|
|
980.9
|
|
|
1,020.0
|
Gold sold (ounces)
|
|
190,628
|
|
|
190,621
|
|
|
189,321
|
|
|
203,952
|
|
|
774,522
|
|
|
725,095
|
Average realized gold price ($/ounce)
|
|
1,299
|
|
|
1,299
|
|
|
1,274
|
|
|
1,199
|
|
|
1,266
|
|
|
1,407
|
Cash operating costs ($/ounce)
|
|
519
|
|
|
489
|
|
|
488
|
|
|
505
|
|
|
500
|
|
|
494
|
All-in sustaining cash cost ($/ounce sold)
|
|
786
|
|
|
829
|
|
|
735
|
|
|
761
|
|
|
779
|
|
|
551
|
Gross profit from gold mining operations
|
|
95.4
|
|
|
100.8
|
|
|
102.0
|
|
|
84.5
|
|
|
382.7
|
|
|
481.1
|
Net profit (loss) attributable to
shareholders of the Company
|
|
31.3
|
|
|
37.6
|
|
|
19.8
|
|
|
13.9
|
|
|
102.6
|
|
|
(653.3)
|
Earnings (loss) per share attributable to
shareholders of the Company - Basic ($/share)
|
|
0.04
|
|
|
0.05
|
|
|
0.03
|
|
|
0.02
|
|
|
0.14
|
|
|
(0.91)
|
Earnings (loss) per share attributable to
shareholders of the Company - Diluted
($/share)
|
|
0.04
|
|
|
0.05
|
|
|
0.03
|
|
|
0.02
|
|
|
0.14
|
|
|
(0.91)
|
Cash flow from operating activities before
changes in non-cash working capital
|
|
94.7
|
|
|
92.2
|
|
|
78.7
|
|
|
77.3
|
|
|
342.9
|
|
|
382.0
|
Review of Annual Financial Results
Gold sales volumes increased 7% year over year, with increases from the
Company's Chinese mines and Kisladag offsetting a decrease in sales
from Efemcukuru. Total cash costs per ounce increased slightly in 2014
by $6 per ounce to $557, reflecting the Company's ongoing focus on
controlling operating costs. Gross profit from gold mining operations
of $382.7 million fell 20% year over year on decreasing gross margins
as a result of the drop in gold prices to an average realized price of
$1,266 per ounce, and an increase in depreciation, depletion and
amortization ("DD&A") per ounce sold. The combined DD&A rate increased
year over year due to the higher volume of ounces sold in 2014 from
Jinfeng and White Mountain, which have higher depreciation rates than
the other mines.
Net profit attributable to shareholders of the Company was $102.6
million, or $0.14 per share, compared to a loss attributable to
shareholders of the Company of $653.3 million, or $0.91 per share in
2013. The loss in 2013 was mainly due to an impairment loss, net of
tax, in the amount of $684.6 million related to Jinfeng and Eastern
Dragon, as well as a deferred income tax charge of $125.2 million
related to a change in income tax rates in Greece.
Adjusted net earnings were $138.7 million or $0.19 per share (2013:
$192.9 million or $0.27 per share), a decrease of $54.2 million year
over year. The main factor affecting the adjusted net earnings was the
$98.4 million decrease in gross profit from gold mining operations
described above. Offsetting this were the following factors: 1) an
$18.5 million decrease in exploration costs; 2) an $11.6 million
decrease in interest expense related to capitalization of interest on
the Company's development projects; and 3) a decrease in tax expense
related to lower taxable income. Please see the accompanying
Management's Discussion and Analysis for a reconciliation between loss
attributable to shareholders of the Company and adjusted net earnings.
Review of Quarterly Financial Results
Net profit attributable to shareholders of the Company for the fourth
quarter was $13.9 million, or $0.02 per share as compared to a loss for
the quarter ended December 31, 2013 of $687.5 million, or $0.96 per
share. The main factors that impacted earnings for the fourth quarter
year over year were: 1) the impairment charge, net of taxes, of $684.6
million recorded in 2013; and 2) higher gold sales volumes and lower
gold sales prices in the fourth quarter 2014.
2014 Review and 2015 Outlook
TURKEY
Kisladag
Gold production of 311,233 ounces at Kisladag in 2014 was 2% higher year
over year mainly as a result of an increase in ore placed on the leach
pad. Kisladag placed 17% more total tonnes on the leach pad
compensating for a lower head grade than 2013. Cash operating costs of
$443 per ounce were higher year over year as a result of the increased
volume of ore and operational waste mined, partly offset by the impact
of the decline in the Turkish lira on operating costs. Capital
expenditures at Kisladag of $41.6 million in 2014 included capitalised
waste stripping, and sustaining construction projects.
For 2015, Kisladag is expected to produce between 230,000-245,000 ounces
of gold at a cash cost in the $600-650 range. The sustaining capital
expenditure for the year is budgeted at $70.0 million.
Kisladag Phase IV Mine Expansion
In June 2014 the Company received a positive Environmental Assessment
decision from the Ministry of Environment and Urbanization of Turkey on
the Expansion project. Results of the optimization scenario studies
undertaken during 2014 indicated an optimum production rate of 20
million tonnes per year of crushed ore, taking into account existing
plant capacity and available equipment, as well as the additional
accelerated capital costs required for waste stripping and construction
of leach pads and waste dumps. Engineering work to support this
approach was completed during the year, including the development of
detailed design packages. Capital costs incurred in 2014 relating to
this expansion were $11.6 million.
The Company opted to defer the completion of the Kisladag Expansion
project at year end after taking into account prioritization of capital
resources for its other development projects in a period of weaker gold
prices. Over the next two years, the Company has committed to
progressing Phase II of the Olympias mine and completing the build of
the Skouries gold project, both capital intensive developments in
Halkidiki, Greece. Once the bulk of capital spending for these
projects is complete in late 2016, the Company plans to complete the
Kisladag Expansion project, with crushed ore throughput ramping up to
20 million tonnes per year beginning in 2018. Average mine grades in
the period 2015-2019 will range between 0.75 and 0.95 grams per tonne.
Kisladag Production Forecast
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2015
|
|
|
2016
|
|
|
2017
|
|
|
2018
|
|
|
2019
|
Ounces per year
|
|
|
230,000-245,000
|
|
|
235,000-250,000
|
|
|
255,000-270,000
|
|
|
310,000-325,000
|
|
|
375,000-390,000
|
Efemcukuru
Gold production of 98,829 ounces at Efemcukuru increased 9% year over
year as concentrate sales contracts were renegotiated to improve
payability. Gold ounces sold were lower due to a drawdown in the high
concentrate inventory levels that existed at the end of 2012. Lower
cash operating costs were the result of both the impact of the
weakening Turkish lira as well as payable gold production. Capital
spending of $25.6 million in 2014 included costs related to capitalized
underground development, mobile equipment, tailings dam construction,
and process improvements.
Exploration drilling programs primarily focused on surface targets at
the Efemcukuru mine site. Step-out drilling tested the central and
northern parts of the Kokarpinar vein, and an initial phase of drilling
was completed on the Dedebag vein, located in the footwall of the
Kestane Beleni vein.
For 2015, Efemcukuru is expected to produce 90,000-100,000 ounces of
gold at cash costs between $550-600 per ounce. Allocated sustaining
capital for 2015 is $25.0 million.
Exploration
The Company's reconnaissance exploration teams advanced early-stage
exploration projects at Dolek, Kisladag North and Bambal to drill-ready
stage, and conducted project generation work in northern and western
Turkey.
CHINA
In mid-2014, the Company announced that it was evaluating the merits of
pursuing a potential overseas listing on the Hong Kong Stock Exchange
in relation to its Chinese business. With Bank of America Merrill Lynch
retained as its sponsor, the Company is progressing with the work
involved in the listing requirements.
Jinfeng
Gold production of 168,503 ounces at Jinfeng in 2014 was 37% higher year
over year mainly due to a full year's production from the open pit,
higher average head grade and higher recovery rate. Production from the
open pit in 2013 recommenced mid-year after completion of a push-back.
Cash operating costs of $575 per ounce were 22% lower than 2013 due to
an increase in production as a result of higher average head grade.
Capital expenditures of $16.0 million for the year included capitalized
underground development, process plant upgrades, and tailings dam
construction.
Jinfeng is expected to produce between 135,000-145,000 ounces of gold at
cash costs between $660-700 per ounce in 2015. Sustaining capital for
the year is expected to be $30.0 million.
Tanjianshan
Gold production of 107,614 ounces at Tanjianshan in 2014 was 6% higher
year over year mainly due to higher average treated head grade as well
as gold-in-circuit inventory drawdown. Cash operating costs of $389 per
ounce in 2014 were lower than in 2013 mainly due to lower fuel and
reagent costs. Capital expenditures of $5.4 million for the year
included capitalized waste stripping and process plant upgrades.
Brownfields drilling programs included additional drilling at Qinlongtan
North, step-out drilling at the Xijingou deposit, and testing
within-pit targets at Jinlonggou. Underground development commenced
late in the fourth quarter 2014 at Qinlongtan North and is scheduled to
provide platforms for delineation drilling and further step-out
drilling beginning in mid to late 2015.
For 2015, Tajianshan is expected to produce between 90,000-100,000
ounces of gold at a cash cost between $475-500 per ounce. Sustaining
capital for the year is budgeted at $20.0 million.
White Mountain
Gold production of 85,308 ounces at White Mountain in 2014 was 17%
higher year over year due to higher average treated head grade, ore
throughput and average recovery rate. Cash operating costs per ounce of
$617 were 12% lower than 2013 as a result of the higher average treated
head grade and recovery rate. In addition, the mine generated cost
savings through optimization of backfill operations. Capital
expenditures of $20.4 million for the year included capitalized
underground development, process plant upgrades, tailings dam
construction, and the acquisition of underground mobile equipment.
At the White Mountain mine, underground exploration drilling during 2014
outlined down-dip extensions to the Central and North zones of the main
orebody. Additional drilling from both surface and underground stations
further defined the high-grade Northern Deeps zone.
For 2015, White Mountain is expected to produce between 70,000-75,000
ounces of gold at a cash cost between $650-690 per ounce at White
Mountain. The sustaining capital for the year is budgeted at $20.0
million.
Eastern Dragon
Eastern Dragon continued on care and maintenance during 2014, pending
resolution of permitting issues. Site management worked with local
authorities to maintain permits and environmental compliance in good
standing. Based on discussions with local and national authorities, the
EIA was resubmitted during the year. Capital costs incurred at Eastern
Dragon totalled $0.7 million.
Receipt of the Project Permit Approval is expected during 2015, allowing
the Company to complete the outstanding waste rock dump, tailings dam
construction and initial pre-stripping. Commissioning is included in
the Company's 2015 forecast of between 5,000-10,000 ounces of gold at
cash costs between $100-125 per ounce.
Exploration
Brownfields and in-mine exploration programs were the exploration focus
in China during 2014.
GREECE
The Company, and the mining industry generally, face turbulence in the
evolving economic, social and political landscape. This turbulence is
presently being experienced in Greece. Despite this backdrop, the
Company continues to operate its normal business, actively engaging all
stakeholders and confidently responding and adapting to the evolving
environment.
Eldorado now directly employs over 2,000 persons in Greece, with in
excess of 5,000 direct and indirect jobs attributable to Eldorado's
investment. Investments in 2015 will continue to result in further
increases in employment levels and significant ancillary benefits to
the local communities and the economy of Greece.
Skouries
During 2014, work at Skouries was primarily focused on advancing
engineering and procurement, as well as opening major work fronts on
the construction site. Engineering design work progressed over the year
with designs over 80% complete by year end. Major earthworks continued
in the process plant area and foundations for the SAG, Ball and Regrind
Mills were completed and the mills were installed to various stages of
completion. Pre-stripping commenced in the open pit, and over 500,000
cubic meters of topsoil and overburden were removed in advance of open
pit mining. The engineering design was completed for the Tailings
Management Facility, and initial earthworks, including a road to access
the base of the tailings dam commenced.
A scoping level study for the development of the Skouries underground
mine was completed during 2014 and results of the study confirmed that
sub-level open stoping is the preferred method of mining the deposit. A
prefeasibility study, to be completed during 2015, is expected to
further define the production profile and infrastructure required for
the underground operation. During 2014 a total of $108.2 million was
spent on Skouries, excluding capitalized exploration and capitalized
interest.
Development capital for 2015 at Skouries is expected to be approximately
$200.0 million.
Olympias
In 2014, the Olympias plant retreated 625,345 tonnes of tailings at a
grade of 2.70 grams per tonne. In 2014, 17,737 ounces of gold in
concentrate were produced. New mine development and underground
refurbishment continued at Olympias during 2014 and approximately 20%
of the planned 8.0 kilometer tunnel is now complete. Capital costs
incurred in 2014 were $68.5 million, excluding capitalized exploration
and capitalized interest.
2015 production from the tailings rehabilitation is expected to be
between 20,000-25,000 ounces of gold. Capital spending for the year is
expected to be $110.0 million. Conceptual designs were prepared for
conversion of the process concentrator from retreating tailings
material to handling run of mine ore as planned for Phase II.
Implementation of Phase II is scheduled to begin during 2015 with
underground mining on Phase II projected to begin in 2016.
Stratoni
Stratoni processed 2% fewer ore tonnes in 2014 than 2013 due to lower
mine output as a result of fewer production faces in the underground
mine. Concentrate tonnes produced were 2% lower than 2013, which was a
direct result of lower mill throughput. Tonnes of concentrate sold were
3% lower than 2013 due to lower production, however, this reduction was
offset by higher zinc prices which resulted in an increase in
concentrate revenues year over year. Capital expenditures of $5.0
million for the year included upgrades to health, safety and
environment equipment, upgrades to the water treatment plant, and
equipment upgrades in the mine.
In 2015, the Company expects to process 190,000 tonnes of ore at grades
of 6.6% lead, 9.3% zinc and 184 grams per tonne silver. Sustaining
capital for the year is budgeted at $6.0 million.
Perama Hill
During 2014, a front end engineering design study for Perama Hill was
completed. A design for the access roads, power supply and enabling
works was also completed to allow for quick start-up upon receipt of
the Environmental Impact Assessment. In 2014, a total of $6.8 million
was spent on the Perama Hill project.
In the Perama District, completion of the Glory Resources acquisition in
early 2014 added the Sapes project to the Company's project portfolio.
Exploration at Sapes during the year consisted of geological mapping of
the large alteration system hosting and surrounding the deposit, and
reinterpretation of the geological model for the Viper Zone.
Exploration
During 2014, 6,500 metres of drilling were completed at the Piavitsa
Project in Halkidiki, Greece. Most of this drilling targeted gaps in
the existing drill coverage. The deposit has now been defined over a
2.5 kilometer strike length along the mineralized Stratoni Fault zone.
At Tsikara, adjacent to the Skouries deposit, fieldwork was directed
towards identifying porphyry drill targets.
BRAZIL
Vila Nova
Vila Nova processed slightly fewer tonnes at the same grade year over
year. Iron ore sales were 12% higher than in 2013 as a result of
increased shipments in the first half of the year. Iron ore prices
declined throughout the year, ending the year below the net realizable
value of Vila Nova's inventory, resulting in an inventory write-down of
$13.5 million for the year. As a result, a decision was made during the
fourth quarter of 2014 to place the mine on care and maintenance. Iron
ore shipments are scheduled to continue through mid-2015 until existing
iron ore stockpiles are depleted.
Tocantinzinho
A detailed review and optimisation of the feasibility study for
Tocantinzinho was carried out in 2014. Significant improvements to the
project were realized in the areas of offsite infrastructure costs and
reduced taxes which reduced projected capital expenditures for the
project. A decision on the project has been deferred pending
availability of capital resources. Capital costs incurred at
Tocantinzinho in 2014 totalled $4.3 million and were spent on
engineering and site works to advance the design of the access road to
the site.
Drilling at Tocantinzinho further defined geological resources contained
within historical tailings overlying the main deposit. A first-pass
drilling program was completed on the approximate 6.0 kilometer long
copper-gold anomaly at Santa Patricia, located on the northern part of
the Tocantinzinho license area.
Exploration
During 2014, exploration programs in Brazil drill-tested early stage
projects at Goldfish, Anicuns, and Rubens Zilio.
ROMANIA
Certej
In April 2014 the Company filed a National Instruments 43-101 Technical
Report on the Certej project, including the findings of an updated
prefeasibility study. The study was based on revised mineral resources
and new data from metallurgical test work. The study identified a
number of opportunities to improve the economic performance of the
project, which are now being incorporated into a full feasibility study
to be released in 2015. During 2014 a total of $12.2 million was spent
at Certej, mainly on geotechnical and metallurgical testing, site
preparation and engineering studies.
During 2015, the Company expects to spend approximately $25.0 million at
Certej, primarily on land acquisition, the feasibility study and site
development costs.
Exploration
Exploration drilling was completed during the year at the Bocsa, Magura,
Muncel, Brad and Deva projects, all of which are situated in the
Apuseni district near the Certej deposit. The team also completed
re-logging 105,000 metres of Certej drill core, the results of which
form the basis for an updated geological interpretation and resource
model for the deposit.
Conference Call
Senior management of the Company will host a conference call on February
20, 2015 at 11:30 AM ET to discuss Eldorado's 2014 Results and 2015
Outlook. The call will be webcast and can be accessed at Eldorado's
website at www.eldoradogold.com. Participants may join the call by dialing toll-free 1-888-231-8191 or
1-647-427-7450. A replay is available until February 27, 2015 by
dialing toll-free 1-855-859-2056 or 416-849-0833 (pass code 7447 8006).
About Eldorado Gold
Eldorado is a leading low cost gold producer with mining, development
and exploration operations in Turkey, China, Greece, Romania and
Brazil. The Company's success to date is based on a low cost strategy,
a highly skilled and dedicated workforce, safe and responsible
operations, and long-term partnerships with the communities where it
operates. Eldorado's common shares trade on the Toronto Stock Exchange
(TSX: ELD) and the New York Stock Exchange (NYSE: EGO).
Certain of the statements made herein may contain forward-looking
statements or information within the meaning of the United States
Private Securities Litigation Reform Act of 1995 and applicable
Canadian securities laws. Often, but not always, forward-looking
statements and forward-looking information can be identified by the use
of words such as "plans", "expects", "is expected", "budget",
"scheduled", "estimates", "forecasts", "intends", "anticipates", or
"believes" or the negatives thereof or variations of such words and
phrases or statements that certain actions, events or results "may",
"could", "would", "might" or "will" be taken, occur or be achieved.
Forward-looking statements or information herein include, but are not
limited, to statements or information with respect to the Company's
2014 Full Year and Fourth Quarter Financial and Operating Results.
Forward-looking statements and forward-looking information by their
nature are based on assumptions and involve known and unknown risks,
uncertainties and other factors which may cause the actual results,
performance or achievements of the Company to be materially different
from any future results, performance or achievements expressed or
implied by such forward-looking statements or information. We have
made certain assumptions about the forward-looking statements and
information, including assumptions about the legal restrictions
regarding the payment of dividends by the Company; assumptions about
the price of gold; anticipated costs and expenditures; estimated
production, mineral reserves and metallurgical recoveries; financial
position, reserves and resources and gold production; and the ability to achieve our goals. Although our management believes
that the assumptions made and the expectations represented by such
statements or information are reasonable, there can be no assurance
that the forward-looking statements or information will prove to be
accurate. Furthermore, should one or more of the risks, uncertainties
or other factors materialize, or should underlying assumptions prove
incorrect, actual results may vary materially from those described in
forward-looking statements or information. These risks, uncertainties
and other factors include, among others, the following: gold price
volatility; risks of not meeting production and cost targets;
discrepancies between actual and estimated production, mineral reserves
and resources and metallurgical recoveries; mining operational and
development risk; litigation risks; regulatory restrictions, including
environmental regulatory restrictions and liability; risks of sovereign
investment and operating in foreign countries; currency fluctuations;
speculative nature of gold exploration; global economic climate;
dilution; share price volatility; competition; loss of key employees;
additional funding requirements; and defective title to mineral claims
or property, as well as those factors discussed in the sections
entitled "Forward-Looking Statements" and "Risk Factors" in the
Company's Annual Information Form & Form 40-F dated March 28, 2014
There can be no assurance that forward-looking statements or information
will prove to be accurate, as actual results and future events could
differ materially from those anticipated in such statements.
Accordingly, you should not place undue reliance on the forward-looking
statements or information contained herein. Except as required by law,
we do not expect to update forward-looking statements and information
continually as conditions change and you are referred to the full
discussion of the Company's business contained in the Company's reports
filed with the securities regulatory authorities in Canada and the U.S.
Cautionary Note Regarding Mineral Reserves and Mineral Resources
The terms "Mineral Reserve", "Proven Mineral Reserve" and "Probable
Mineral Reserve" used in this release are Canadian mining terms as
defined in accordance with National Instrument 43-101 - Standards of
Disclosure for Mineral Projects under the guidelines set out in the
Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM")
Standards on Mineral Resources and Mineral Reserves, adopted by the CIM
Council on August 20, 2000 as may be amended from time to time by the
CIM. These definitions differ from the definitions in the United
States Securities & Exchange Commission ("SEC") Guide 7. In the United
States, a mineral reserve is defined as a part of a mineral deposit
which could be economically and legally extracted or produced at the
time the mineral reserve determination is made.
The terms "Mineral Resource", "Measured Mineral Resource", "Indicated
Mineral Resource", "Inferred Mineral Resource" used in this release are
Canadian mining terms as defined in accordance with National
Instruction 43-101 - Standards of Disclosure for Mineral Projects under
the guidelines set out in the CIM Standards. Mineral Resources which
are not Mineral Reserves do not have demonstrated economic viability.
For a detailed discussion of resource and reserve estimates and related
matters see the Company's reports, including the Annual Information
Form and Form 40-F dated March 28, 2014 and technical reports filed
under the Company's name at www.sedar.com and www.sec.gov respectively.
Cautionary Note to US Investors Concerning Estimates of Measured,
Indicated and Inferred Resources
Note to U.S. Investors. While the terms "mineral resource", "measured
mineral resource," "indicated mineral resource", and "inferred mineral
resource" are recognized and required by Canadian regulations, they are
not defined terms under standards in the United States and normally are
not permitted to be used in reports and registration statements filed
with the SEC. As such, information contained in this report concerning
descriptions of mineralization and resources under Canadian standards
may not be comparable to similar information made public by U.S
companies in SEC filings. With respect to "indicated mineral resource"
and "inferred mineral resource" there is a great amount of uncertainty
as to their existence and a great uncertainty as to their economic and
legal feasibility. It cannot be assumed that all or any part of an
"indicated mineral resource" or "inferred mineral resource" will ever
be upgraded to a higher category. Investors are cautioned not to
assume that any part or all of mineral deposits in these categories
will ever be converted into reserves.
There can be no assurance that forward-looking statements or information
will prove to be accurate, as actual results and future events could
differ materially from those anticipated in such statements.
Accordingly, you should not place undue reliance on the forward-looking
statements or information contained herein. Except as required by law,
we do not expect to update forward-looking statements and information
continually as conditions change and you are referred to the full
discussion of the Company's business contained in the Company's reports
filed with the securities regulatory authorities in Canada and the U.S.
Table 1: Eldorado Gold Mineral Reserves, as of December 2014
|
Project
|
|
|
Proven Mineral Reserves
|
|
|
Probable Mineral Reserves
|
|
|
Total Proven and Probable
|
Gold
|
|
|
Tonnes
|
|
|
Au
|
|
|
In-situ Au
|
|
|
Tonnes
|
|
|
Au
|
|
|
In-situ Au
|
|
|
Tonnes
|
|
|
Au
|
|
|
In-situ Au
|
|
|
|
(x1000)
|
|
|
g/t
|
|
|
ounces (x1000)
|
|
|
(x1000)
|
|
|
g/t
|
|
|
ounces (x1000)
|
|
|
(x1000)
|
|
|
g/t
|
|
|
ounces (x1000)
|
Certej
|
|
|
20,441
|
|
|
1.91
|
|
|
1,255
|
|
|
26,543
|
|
|
1.41
|
|
|
1,203
|
|
|
46,984
|
|
|
1.63
|
|
|
2,458
|
Eastern Dragon
|
|
|
837
|
|
|
11.07
|
|
|
297
|
|
|
2,168
|
|
|
6.46
|
|
|
447
|
|
|
3,005
|
|
|
7.70
|
|
|
744
|
Efemcukuru
|
|
|
863
|
|
|
8.54
|
|
|
237
|
|
|
3,503
|
|
|
6.91
|
|
|
778
|
|
|
4,366
|
|
|
7.23
|
|
|
1,015
|
Jinfeng
|
|
|
7,166
|
|
|
3.91
|
|
|
900
|
|
|
9,362
|
|
|
3.73
|
|
|
1,122
|
|
|
16,528
|
|
|
3.81
|
|
|
2,022
|
Kisladag
|
|
|
66,561
|
|
|
0.84
|
|
|
1,795
|
|
|
295,686
|
|
|
0.66
|
|
|
6,294
|
|
|
362,247
|
|
|
0.69
|
|
|
8,089
|
Olympias
|
|
|
6,081
|
|
|
7.59
|
|
|
1,484
|
|
|
11,236
|
|
|
7.54
|
|
|
2,724
|
|
|
17,317
|
|
|
7.56
|
|
|
4,208
|
Perama
|
|
|
2,477
|
|
|
4.44
|
|
|
354
|
|
|
7,220
|
|
|
2.68
|
|
|
621
|
|
|
9,697
|
|
|
3.13
|
|
|
975
|
Skouries
|
|
|
68,762
|
|
|
0.87
|
|
|
1,928
|
|
|
81,311
|
|
|
0.67
|
|
|
1,752
|
|
|
150,073
|
|
|
0.76
|
|
|
3,680
|
Tanjianshan
|
|
|
2,252
|
|
|
2.71
|
|
|
196
|
|
|
1,061
|
|
|
2.70
|
|
|
92
|
|
|
3,313
|
|
|
2.70
|
|
|
288
|
Tocantinzinho
|
|
|
17,514
|
|
|
1.51
|
|
|
850
|
|
|
24,798
|
|
|
1.32
|
|
|
1,052
|
|
|
42,312
|
|
|
1.40
|
|
|
1,902
|
White Mountain
|
|
|
3,394
|
|
|
3.11
|
|
|
339
|
|
|
2,291
|
|
|
3.15
|
|
|
232
|
|
|
5,685
|
|
|
3.13
|
|
|
571
|
TOTAL GOLD
|
|
|
196,348
|
|
|
1.53
|
|
|
9,635
|
|
|
465,179
|
|
|
1.09
|
|
|
16,317
|
|
|
661,527
|
|
|
1.22
|
|
|
25,952
|
Silver
|
|
|
Tonnes
|
|
|
Ag
|
|
|
In-situ Ag
|
|
|
Tonnes
|
|
|
Ag
|
|
|
In-situ Ag
|
|
|
Tonnes
|
|
|
Ag
|
|
|
In-situ Ag
|
|
|
|
(x1000)
|
|
|
g/t
|
|
|
ounces (x1000)
|
|
|
(x1000)
|
|
|
g/t
|
|
|
ounces (x1000)
|
|
|
(x1000)
|
|
|
g/t
|
|
|
ounces (x1000)
|
Certej
|
|
|
20,441
|
|
|
10
|
|
|
6,283
|
|
|
26,543
|
|
|
12
|
|
|
9,967
|
|
|
46,984
|
|
|
11
|
|
|
16,250
|
Eastern Dragon
|
|
|
837
|
|
|
81
|
|
|
2,178
|
|
|
2,168
|
|
|
67
|
|
|
4,628
|
|
|
3,005
|
|
|
70
|
|
|
6,806
|
Olympias
|
|
|
4,851
|
|
|
124
|
|
|
19,339
|
|
|
11,236
|
|
|
130
|
|
|
46,962
|
|
|
16,087
|
|
|
128
|
|
|
66,301
|
Perama
|
|
|
2,477
|
|
|
3
|
|
|
254
|
|
|
7,220
|
|
|
4
|
|
|
897
|
|
|
9,697
|
|
|
4
|
|
|
1,151
|
Stratoni
|
|
|
524
|
|
|
174
|
|
|
2,931
|
|
|
263
|
|
|
182
|
|
|
1,539
|
|
|
787
|
|
|
177
|
|
|
4,470
|
TOTAL SILVER
|
|
|
29,130
|
|
|
33
|
|
|
30,985
|
|
|
47,430
|
|
|
42
|
|
|
63,993
|
|
|
76,560
|
|
|
39
|
|
|
94,978
|
Copper
|
|
|
Tonnes
|
|
|
Cu
|
|
|
In-situ Cu
|
|
|
Tonnes
|
|
|
Cu
|
|
|
In-situ Cu
|
|
|
Tonnes
|
|
|
Cu
|
|
|
In-situ Cu
|
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
Skouries
|
|
|
68,762
|
|
|
0.53
|
|
|
362
|
|
|
81,311
|
|
|
0.50
|
|
|
405
|
|
|
150,073
|
|
|
0.51
|
|
|
767
|
TOTAL COPPER
|
|
|
68,762
|
|
|
0.53
|
|
|
362
|
|
|
81,311
|
|
|
0.50
|
|
|
405
|
|
|
150,073
|
|
|
0.51
|
|
|
767
|
Lead
|
|
|
Tonnes
|
|
|
Pb
|
|
|
In-situ Pb
|
|
|
Tonnes
|
|
|
Pb
|
|
|
In-situ Pb
|
|
|
Tonnes
|
|
|
Pb
|
|
|
In-situ Pb
|
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
Olympias
|
|
|
4,851
|
|
|
4.1
|
|
|
199
|
|
|
11,236
|
|
|
4.4
|
|
|
494
|
|
|
16,087
|
|
|
4.3
|
|
|
693
|
Stratoni
|
|
|
524
|
|
|
6.6
|
|
|
35
|
|
|
263
|
|
|
7.2
|
|
|
19
|
|
|
787
|
|
|
6.9
|
|
|
54
|
TOTAL LEAD
|
|
|
5,375
|
|
|
4.4
|
|
|
234
|
|
|
11,499
|
|
|
4.5
|
|
|
513
|
|
|
16,874
|
|
|
4.4
|
|
|
747
|
Zinc
|
|
|
Tonnes
|
|
|
Zn
|
|
|
In-situ Zn
|
|
|
Tonnes
|
|
|
Zn
|
|
|
In-situ Zn
|
|
|
Tonnes
|
|
|
Zn
|
|
|
In-situ Zn
|
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
Olympias
|
|
|
4,851
|
|
|
5.1
|
|
|
247
|
|
|
11,236
|
|
|
6.0
|
|
|
674
|
|
|
16,087
|
|
|
5.7
|
|
|
921
|
Stratoni
|
|
|
524
|
|
|
10.1
|
|
|
53
|
|
|
263
|
|
|
10.2
|
|
|
27
|
|
|
787
|
|
|
10.2
|
|
|
80
|
TOTAL ZINC
|
|
|
5,375
|
|
|
5.6
|
|
|
300
|
|
|
11,499
|
|
|
6.1
|
|
|
701
|
|
|
16,874
|
|
|
5.9
|
|
|
1,001
|
Iron
|
|
|
Tonnes
|
|
|
Fe
|
|
|
|
|
|
Tonnes
|
|
|
Fe
|
|
|
|
|
|
Tonnes
|
|
|
Fe
|
|
|
|
|
|
|
(x1000)
|
|
|
%
|
|
|
|
|
|
(x1000)
|
|
|
%
|
|
|
|
|
|
(x1000)
|
|
|
%
|
|
|
|
Vila Nova
|
|
|
2,180
|
|
|
59.3
|
|
|
|
|
|
6,791
|
|
|
58.5
|
|
|
|
|
|
8,971
|
|
|
58.7
|
|
|
|
TOTAL IRON
|
|
|
2,180
|
|
|
59.3
|
|
|
|
|
|
6,791
|
|
|
58.5
|
|
|
|
|
|
8,971
|
|
|
58.7
|
|
|
|
Table 2: Eldorado Gold Mineral Resources as of December 2014
|
Project
|
|
|
Measured Resources
|
|
|
Indicated Resources
|
|
|
Total Measured and Indicated
|
|
|
Inferred Resources
|
Gold
|
|
|
Tonnes
|
|
|
Au
|
|
|
In-situ Au
|
|
|
Tonnes
|
|
|
Au
|
|
|
In-situ Au
|
|
|
Tonnes
|
|
|
Au
|
|
|
In-situ Au
|
|
|
Tonnes
|
|
|
Au
|
|
|
In-situ Au
|
|
|
|
(x1000)
|
|
|
g/t
|
|
|
ounces (x1000)
|
|
|
(x1000)
|
|
|
g/t
|
|
|
ounces (x1000)
|
|
|
(x1000)
|
|
|
g/t
|
|
|
ounces (x1000)
|
|
|
(x1000)
|
|
|
g/t
|
|
|
ounces (x1000)
|
Certej
|
|
|
25,680
|
|
|
1.75
|
|
|
1,448
|
|
|
85,435
|
|
|
1.23
|
|
|
3,368
|
|
|
111,115
|
|
|
1.35
|
|
|
4,816
|
|
|
29,002
|
|
|
1.08
|
|
|
1,010
|
Eastern Dragon
|
|
|
800
|
|
|
12.48
|
|
|
322
|
|
|
2,700
|
|
|
6.04
|
|
|
530
|
|
|
3,500
|
|
|
7.50
|
|
|
852
|
|
|
2,200
|
|
|
2.67
|
|
|
190
|
Efemcukuru
|
|
|
2,069
|
|
|
9.12
|
|
|
607
|
|
|
3,286
|
|
|
7.82
|
|
|
827
|
|
|
5,355
|
|
|
8.32
|
|
|
1,434
|
|
|
5,404
|
|
|
4.99
|
|
|
867
|
Jinfeng
|
|
|
8,070
|
|
|
4.09
|
|
|
1,061
|
|
|
13,398
|
|
|
3.77
|
|
|
1,623
|
|
|
21,468
|
|
|
3.89
|
|
|
2,684
|
|
|
8,080
|
|
|
3.78
|
|
|
982
|
Kisladag
|
|
|
70,750
|
|
|
0.80
|
|
|
1,827
|
|
|
456,824
|
|
|
0.59
|
|
|
8,607
|
|
|
527,574
|
|
|
0.62
|
|
|
10,434
|
|
|
380,719
|
|
|
0.40
|
|
|
4,921
|
Olympias
|
|
|
5,694
|
|
|
8.55
|
|
|
1,565
|
|
|
10,644
|
|
|
8.55
|
|
|
2,926
|
|
|
16,338
|
|
|
8.55
|
|
|
4,491
|
|
|
3,955
|
|
|
8.34
|
|
|
1,060
|
Perama
|
|
|
3,064
|
|
|
4.30
|
|
|
424
|
|
|
9,375
|
|
|
3.18
|
|
|
958
|
|
|
12,439
|
|
|
3.46
|
|
|
1,382
|
|
|
8,766
|
|
|
1.96
|
|
|
554
|
Piavitsa
|
|
|
|
|
|
|
|
|
|
|
|
0
|
|
|
0.00
|
|
|
0
|
|
|
0
|
|
|
0.00
|
|
|
0
|
|
|
10,542
|
|
|
5.70
|
|
|
1,932
|
Sapes
|
|
|
|
|
|
|
|
|
|
|
|
2,423
|
|
|
6.08
|
|
|
474
|
|
|
2,423
|
|
|
6.08
|
|
|
474
|
|
|
1,011
|
|
|
10.65
|
|
|
347
|
Skouries
|
|
|
99,135
|
|
|
0.80
|
|
|
2,552
|
|
|
184,493
|
|
|
0.49
|
|
|
2,853
|
|
|
283,628
|
|
|
0.60
|
|
|
5,405
|
|
|
168,063
|
|
|
0.31
|
|
|
1,673
|
Tanjianshan
|
|
|
2,410
|
|
|
2.60
|
|
|
202
|
|
|
2,903
|
|
|
3.13
|
|
|
292
|
|
|
5,313
|
|
|
2.89
|
|
|
494
|
|
|
5,890
|
|
|
3.15
|
|
|
597
|
Tocantinzinho
|
|
|
17,530
|
|
|
1.51
|
|
|
851
|
|
|
31,202
|
|
|
1.26
|
|
|
1,264
|
|
|
48,732
|
|
|
1.35
|
|
|
2,115
|
|
|
2,395
|
|
|
0.90
|
|
|
69
|
White Mountain
|
|
|
3,976
|
|
|
3.41
|
|
|
436
|
|
|
3,450
|
|
|
3.43
|
|
|
381
|
|
|
7,426
|
|
|
3.41
|
|
|
817
|
|
|
2,558
|
|
|
7.50
|
|
|
617
|
TOTAL GOLD
|
|
|
239,178
|
|
|
1.47
|
|
|
11,295
|
|
|
806,133
|
|
|
0.93
|
|
|
24,103
|
|
|
1,045,311
|
|
|
1.05
|
|
|
35,398
|
|
|
628,585
|
|
|
0.73
|
|
|
14,819
|
Silver
|
|
|
Tonnes
|
|
|
Ag
|
|
|
In-situ Ag
|
|
|
Tonnes
|
|
|
Ag
|
|
|
In-situ Ag
|
|
|
Tonnes
|
|
|
Ag
|
|
|
In-situ Ag
|
|
|
Tonnes
|
|
|
Ag
|
|
|
In-situ Ag
|
|
|
|
(x1000)
|
|
|
g/t
|
|
|
ounces (x1000)
|
|
|
(x1000)
|
|
|
g/t
|
|
|
ounces (x1000)
|
|
|
(x1000)
|
|
|
g/t
|
|
|
ounces (x1000)
|
|
|
(x1000)
|
|
|
g/t
|
|
|
ounces (x1000)
|
Certej
|
|
|
25,680
|
|
|
9
|
|
|
7,150
|
|
|
85,435
|
|
|
9
|
|
|
24,611
|
|
|
111,115
|
|
|
9
|
|
|
31,761
|
|
|
29,002
|
|
|
6
|
|
|
5,268
|
Eastern Dragon
|
|
|
800
|
|
|
91
|
|
|
2,400
|
|
|
2,700
|
|
|
67
|
|
|
5,900
|
|
|
3,500
|
|
|
73
|
|
|
8,300
|
|
|
2,200
|
|
|
20
|
|
|
1,500
|
Olympias
|
|
|
4,464
|
|
|
142
|
|
|
20,380
|
|
|
10,644
|
|
|
147
|
|
|
50,305
|
|
|
15,108
|
|
|
146
|
|
|
70,685
|
|
|
3,955
|
|
|
118
|
|
|
15,050
|
Perama
|
|
|
3,064
|
|
|
3
|
|
|
335
|
|
|
9,375
|
|
|
9
|
|
|
2,833
|
|
|
12,439
|
|
|
8
|
|
|
3,168
|
|
|
8,766
|
|
|
7
|
|
|
1,860
|
Piavitsa
|
|
|
|
|
|
|
|
|
|
|
|
0
|
|
|
0
|
|
|
0
|
|
|
0
|
|
|
0
|
|
|
0
|
|
|
10,542
|
|
|
57
|
|
|
19,156
|
Stratoni
|
|
|
689
|
|
|
206
|
|
|
4,563
|
|
|
434
|
|
|
216
|
|
|
3,014
|
|
|
1,123
|
|
|
210
|
|
|
7,577
|
|
|
490
|
|
|
169
|
|
|
2,662
|
TOTAL SILVER
|
|
|
34,697
|
|
|
31
|
|
|
34,828
|
|
|
108,588
|
|
|
25
|
|
|
86,663
|
|
|
143,285
|
|
|
26
|
|
|
121,491
|
|
|
54,955
|
|
|
26
|
|
|
45,496
|
Copper
|
|
|
Tonnes
|
|
|
Cu
|
|
|
In-situ Cu
|
|
|
Tonnes
|
|
|
Cu
|
|
|
In-situ Cu
|
|
|
Tonnes
|
|
|
Cu
|
|
|
In-situ Cu
|
|
|
Tonnes
|
|
|
Cu
|
|
|
In-situ Cu
|
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
Skouries
|
|
|
99,135
|
|
|
0.49
|
|
|
484
|
|
|
184,493
|
|
|
0.41
|
|
|
750
|
|
|
283,628
|
|
|
0.43
|
|
|
1,234
|
|
|
168,063
|
|
|
0.34
|
|
|
575
|
TOTAL COPPER
|
|
|
99,135
|
|
|
0.49
|
|
|
484
|
|
|
184,493
|
|
|
0.41
|
|
|
750
|
|
|
283,628
|
|
|
0.43
|
|
|
1,234
|
|
|
168,063
|
|
|
0.34
|
|
|
575
|
Lead
|
|
|
Tonnes
|
|
|
Pb
|
|
|
In-situ Pb
|
|
|
Tonnes
|
|
|
Pb
|
|
|
In-situ Pb
|
|
|
Tonnes
|
|
|
Pb
|
|
|
In-situ Pb
|
|
|
Tonnes
|
|
|
Pb
|
|
|
In-situ Pb
|
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
Olympias
|
|
|
4,464
|
|
|
4.7
|
|
|
210
|
|
|
10,644
|
|
|
5.0
|
|
|
532
|
|
|
15,108
|
|
|
4.9
|
|
|
742
|
|
|
3,955
|
|
|
3.9
|
|
|
153
|
Stratoni
|
|
|
689
|
|
|
7.8
|
|
|
54
|
|
|
434
|
|
|
8.0
|
|
|
35
|
|
|
1,123
|
|
|
7.9
|
|
|
89
|
|
|
490
|
|
|
6.4
|
|
|
31
|
TOTAL LEAD
|
|
|
5,153
|
|
|
5.1
|
|
|
264
|
|
|
11,078
|
|
|
5.1
|
|
|
567
|
|
|
16,231
|
|
|
5.1
|
|
|
831
|
|
|
4,445
|
|
|
4.1
|
|
|
184
|
Zinc
|
|
|
Tonnes
|
|
|
Zn
|
|
|
In-situ Zn
|
|
|
Tonnes
|
|
|
Zn
|
|
|
In-situ Zn
|
|
|
Tonnes
|
|
|
Zn
|
|
|
In-situ Zn
|
|
|
Tonnes
|
|
|
Zn
|
|
|
In-situ Zn
|
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
|
|
(x1000)
|
|
|
%
|
|
|
tonnes (x1000)
|
Olympias
|
|
|
4,464
|
|
|
5.8
|
|
|
259
|
|
|
10,644
|
|
|
6.8
|
|
|
724
|
|
|
15,108
|
|
|
6.5
|
|
|
983
|
|
|
3,955
|
|
|
4.3
|
|
|
171
|
Stratoni
|
|
|
689
|
|
|
10.5
|
|
|
72
|
|
|
434
|
|
|
10.7
|
|
|
46
|
|
|
1,123
|
|
|
10.5
|
|
|
118
|
|
|
490
|
|
|
8.8
|
|
|
43
|
TOTAL ZINC
|
|
|
5,153
|
|
|
6.4
|
|
|
331
|
|
|
11,078
|
|
|
7.0
|
|
|
770
|
|
|
16,231
|
|
|
6.8
|
|
|
1,101
|
|
|
4,445
|
|
|
4.8
|
|
|
214
|
Iron
|
|
|
Tonnes
|
|
|
Fe
|
|
|
|
|
|
Tonnes
|
|
|
Fe
|
|
|
|
|
|
Tonnes
|
|
|
Fe
|
|
|
|
|
|
Tonnes
|
|
|
Fe
|
|
|
|
|
|
|
(x1000)
|
|
|
%
|
|
|
|
|
|
(x1000)
|
|
|
%
|
|
|
|
|
|
(x1000)
|
|
|
%
|
|
|
|
|
|
(x1000)
|
|
|
%
|
|
|
|
Vila Nova
|
|
|
2,212
|
|
|
59.3
|
|
|
|
|
|
10,982
|
|
|
58.5
|
|
|
|
|
|
13,194
|
|
|
58.7
|
|
|
|
|
|
9,519
|
|
|
59.7
|
|
|
|
TOTAL IRON
|
|
|
2,212
|
|
|
59.3
|
|
|
|
|
|
10,982
|
|
|
58.5
|
|
|
|
|
|
13,194
|
|
|
58.7
|
|
|
|
|
|
9,519
|
|
|
59.7
|
|
|
|
Notes on Mineral Resources and Reserves
|
1)
|
|
Mineral reserves and mineral resources are as of December 31, 2014.
|
2)
|
|
Mineral reserves are included in the mineral resources.
|
3)
|
|
The mineral reserves and mineral resources are disclosed on a total
project basis.
|
4)
|
|
The Olympias mineral reserves and mineral resources include 1.230
million tonnes of economically recoverable old tailings that grade 3.4
g/t Au. These are added into the gold Proven reserve and Measured
resource categories, respectively.
|
|
|
|
Mineral Reserve Notes
|
1)
|
|
Gold price used was $1,250/oz except for the Skouries underground
project which used $1,000. Silver price was $16.50/oz. Copper price
was $3.00/lb. Pb and Zn prices were $2,100/t and $2,100/t,
respectively.
|
2)
|
|
Cut-off grades (gold g/t): Kisladag: 0.27 to 0.32 g/t sulphide;
Efemcukuru: 3.5 g/t; Perama: 0.8 g/t; Tanjianshan: 1.53 g/t JLG
sulphide, 1.33 g/t JLG transition, 1.36 g/t QLT South; Jinfeng: 0.6
g/t open pit, 2.3g/t underground; White Mountain: 1.5 g/t; Eastern
Dragon: 1.0 g/t open pit, 1.7g/t underground; Tocantinzinho: 0.41 g/t
sulphide, 0.43 g/t oxide; Skouries: $10.00 NSR open pit, $24.87 NSR
underground; Olympias: $76.00 NSR. Cut-off grade for Stratoni is based
on a 18.02% Zn Equivalent grade (=Zn%+Pb%*1.39+Ag%*85). Cut-off grade
for Certej is based on a 0.90 g/t Au Equivalent grade
(=Au(g/t)+Ag(g/t)*0.00811).
|
3)
|
|
Qualified Persons:
|
|
|
Richard Miller, P.Eng., General Manager, Kisladag Mine, is responsible
for the Kisladag and Perama reserves; John Nilsson, P.Eng., of Nilsson
Mine Services, is responsible for the Skouries open pit and Certej
reserves; Doug Jones (Registered Member - SME), Senior Vice
President, Operations for the Company, is responsible for the
Tanjianshan, Jinfeng, White Mountain, Eastern Dragon, Efemcukuru,
Olympias, and Stratoni reserves; Norm Pitcher, P.Geo., President for
the Company, is responsible for the Tocantinzinho and Skouries
underground reserves; Roberto Costa, principal of Roberto Costa
Engenharia Ltda, is responsible for the Vila Nova reserves.
|
|
|
|
Mineral Resource Notes
|
1)
|
|
Cut-off grades (gold g/t): Kisladag: 0.25 g/t; Efemcukuru: 2.5 g/t;
Perama: 0.5 g/t; Jinfeng: 0.5 g/t open pit, 2.0 g/t underground;
Tanjianshan: 1.0 g/t; White Mountain: 1.0 g/t; Eastern Dragon: 1.0
g/t; Tocantinzinho: 0.3 g/t ; Certej: 0.7 g/t; Skouries: 0.20 g/t Au
Equivalent grade open pit, 0.60 Au Equivalent grade underground
(AuEQV=Au g/t + 1.6*Cu%); Piavitsa: 3.5 g/t; Sapes: 2.5 g/t
underground, 1.0 g/t open pit. Resource cut-offs for Olympias and
Stratoni are geological based due to the sharpness of the mineralized
contacts and the high grade nature of the mineralization.
|
2)
|
|
Qualified Persons:
|
|
|
Stephen Juras, Ph.D., P.Geo. and Director, Technical Services for the
Company is responsible for all of the Company's mineral resources
except for those associated with Vila Nova and Sapes. Peter Lewis,
P.Geo. is responsible for the Sapes resources and Roberto Costa,
principal of Roberto Costa Engenharia Ltda, is responsible for the Vila
Nova resources.
|
Table 3: Q4 and Full Year 2014 Gold Production Highlights (in US$)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Q4 2014
|
|
|
Q4 2013
|
|
|
2014
|
|
|
2013
|
|
|
2015 Outlook5
|
Gold Production
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ounces Sold
|
|
|
203,952
|
|
|
160,372
|
|
|
774,522
|
|
|
725,095
|
|
|
n/a
|
|
Ounces Produced1
|
|
|
199,572
|
|
|
168,842
|
|
|
789,224
|
|
|
721,201
|
|
|
640,000 to 700,000
|
|
Cash Operating Cost ($/oz)2,4
|
|
|
505
|
|
|
526
|
|
|
500
|
|
|
494
|
|
|
570 to 615
|
|
Total Cash Cost ($/oz)3,4
|
|
|
557
|
|
|
577
|
|
|
557
|
|
|
551
|
|
|
n/a
|
|
Realized Price ($/oz - sold)
|
|
|
1,199
|
|
|
1,264
|
|
|
1,266
|
|
|
1,407
|
|
|
n/a
|
Kişladağ Mine, Turkey
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ounces Sold
|
|
|
89,410
|
|
|
74,217
|
|
|
311,451
|
|
|
306,176
|
|
|
n/a
|
|
Ounces Produced
|
|
|
89,148
|
|
|
74,464
|
|
|
311,233
|
|
|
306,182
|
|
|
230,000 to 245,000
|
|
Tonnes to Pad
|
|
|
4,687,620
|
|
|
3,743,315
|
|
|
15,501,790
|
|
|
13,296,621
|
|
|
n/a
|
|
Grade (grams / tonne)
|
|
|
0.96
|
|
|
0.71
|
|
|
1.01
|
|
|
1.12
|
|
|
n/a
|
|
Cash Operating Cost ($/oz)4
|
|
|
464
|
|
|
370
|
|
|
443
|
|
|
338
|
|
|
600 to 650
|
|
Total Cash Cost ($/oz)3,4
|
|
|
480
|
|
|
384
|
|
|
461
|
|
|
358
|
|
|
n/a
|
Efemçukuru Mine, Turkey
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ounces Sold
|
|
|
24,602
|
|
|
19,231
|
|
|
101,717
|
|
|
121,119
|
|
|
n/a
|
|
Ounces Produced
|
|
|
19,988
|
|
|
21,235
|
|
|
98,829
|
|
|
90,818
|
|
|
90,000 to 100,000
|
|
Tonnes Milled
|
|
|
112,703
|
|
|
111,644
|
|
|
436,852
|
|
|
413,513
|
|
|
n/a
|
|
Grade (grams / tonne)
|
|
|
7.77
|
|
|
9.13
|
|
|
8.34
|
|
|
8.87
|
|
|
n/a
|
|
Cash Operating Cost ($/oz)4
|
|
|
674
|
|
|
696
|
|
|
573
|
|
|
580
|
|
|
550 to 600
|
|
Total Cash Cost ($/oz)3,4
|
|
|
698
|
|
|
700
|
|
|
595
|
|
|
604
|
|
|
n/a
|
Tanjianshan Mine, China
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ounces Sold
|
|
|
28,058
|
|
|
19,127
|
|
|
107,614
|
|
|
101,451
|
|
|
n/a
|
|
Ounces Produced
|
|
|
28,058
|
|
|
19,127
|
|
|
107,614
|
|
|
101,451
|
|
|
90,000 to 100,000
|
|
Tonnes Milled
|
|
|
221,741
|
|
|
258,526
|
|
|
1,045,440
|
|
|
1,064,058
|
|
|
n/a
|
|
Grade (grams / tonne)
|
|
|
4.73
|
|
|
3.25
|
|
|
3.69
|
|
|
3.47
|
|
|
n/a
|
|
Cash Operating Cost ($/oz)4
|
|
|
359
|
|
|
458
|
|
|
389
|
|
|
415
|
|
|
475 to 500
|
|
Total Cash Cost ($/oz)3,4
|
|
|
513
|
|
|
655
|
|
|
559
|
|
|
601
|
|
|
n/a
|
Jinfeng Mine, China
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ounces Sold
|
|
|
42,177
|
|
|
32,401
|
|
|
168,432
|
|
|
123,289
|
|
|
n/a
|
|
Ounces Produced
|
|
|
42,219
|
|
|
32,403
|
|
|
168,503
|
|
|
123,246
|
|
|
135,000 to 145,000
|
|
Tonnes Milled
|
|
|
380,818
|
|
|
360,142
|
|
|
1,470,824
|
|
|
1,412,548
|
|
|
n/a
|
|
Grade (grams / tonne)
|
|
|
3.92
|
|
|
3.51
|
|
|
3.99
|
|
|
3.24
|
|
|
n/a
|
|
Cash Operating Cost ($/oz) 4
|
|
|
531
|
|
|
719
|
|
|
575
|
|
|
736
|
|
|
660 to 700
|
|
Total Cash Cost ($/oz) 3,4
|
|
|
612
|
|
|
801
|
|
|
658
|
|
|
823
|
|
|
n/a
|
White Mountain Mine, China
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ounces Sold
|
|
|
19,705
|
|
|
15,396
|
|
|
85,308
|
|
|
73,060
|
|
|
n/a
|
|
Ounces Produced
|
|
|
19,705
|
|
|
15,396
|
|
|
85,308
|
|
|
73,060
|
|
|
70,000 to 75,000
|
|
Tonnes Milled
|
|
|
217,859
|
|
|
198,841
|
|
|
850,782
|
|
|
810,389
|
|
|
n/a
|
|
Grade (grams / tonne)
|
|
|
3.45
|
|
|
3.23
|
|
|
3.47
|
|
|
3.39
|
|
|
n/a
|
|
Cash Operating Cost ($/oz) 4
|
|
|
638
|
|
|
748
|
|
|
617
|
|
|
705
|
|
|
650 to 690
|
|
Total Cash Cost ($/oz) 3,4
|
|
|
678
|
|
|
786
|
|
|
657
|
|
|
745
|
|
|
n/a
|
Olympias, Greece
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ounces Sold
|
|
|
-
|
|
|
-
|
|
|
-
|
|
|
-
|
|
|
n/a
|
|
Ounces Produced1
|
|
|
454
|
|
|
6,217
|
|
|
17,737
|
|
|
26,444
|
|
|
20,000 to 25,000
|
|
Tonnes Milled
|
|
|
175,244
|
|
|
161,461
|
|
|
625,345
|
|
|
552,557
|
|
|
n/a
|
|
Grade (grams / tonne)
|
|
|
2.27
|
|
|
2.78
|
|
|
2.70
|
|
|
3.32
|
|
|
n/a
|
|
Cash Operating Cost ($/oz)4
|
|
|
-
|
|
|
-
|
|
|
-
|
|
|
-
|
|
|
n/a
|
|
Total Cash Cost ($/oz)3,4
|
|
|
-
|
|
|
-
|
|
|
-
|
|
|
-
|
|
|
n/a
|
1
|
Ounces produced include production from tailings retreatment at
Olympias.
|
2
|
Cost figures calculated in accordance with the Gold Institute Standard.
|
3
|
Cash operating costs, plus royalties and the cost of off-site
administration.
|
4
|
Cash operating costs and total cash costs are non-IFRS measures. Please
see our MD&A for an explanation and discussion of these.
|
5
|
Outlook assumes the following metal prices: Gold $1,200 per ounce;
Silver $20 per ounce.
|
Eldorado Gold Corporation
Consolidated Balance Sheets
(Expressed in thousands of U.S. dollars)
|
Note
|
|
|
December 31, 2014
|
|
|
December 31, 2013
|
|
|
|
|
$
|
|
|
$
|
ASSETS
|
|
|
|
|
|
|
|
Current assets
|
|
|
|
|
|
|
|
|
Cash and cash equivalents
|
6
|
|
|
498,514
|
|
|
589,180
|
|
Term deposits
|
|
|
|
2,800
|
|
|
34,702
|
|
Restricted cash
|
|
|
|
262
|
|
|
262
|
|
Marketable securities
|
|
|
|
4,251
|
|
|
4,387
|
|
Accounts receivable and other
|
7
|
|
|
117,995
|
|
|
89,231
|
|
Inventories
|
8
|
|
|
223,412
|
|
|
244,042
|
|
|
|
|
847,234
|
|
|
961,804
|
Investments in associates
|
9
|
|
|
-
|
|
|
10,949
|
Deferred income tax assets
|
17
|
|
|
104
|
|
|
997
|
Other assets
|
10
|
|
|
43,605
|
|
|
37,330
|
Defined benefit pension plan
|
16
|
|
|
12,790
|
|
|
13,484
|
Property, plant and equipment
|
11
|
|
|
5,963,611
|
|
|
5,684,382
|
Goodwill
|
12
|
|
|
526,296
|
|
|
526,296
|
|
|
|
|
7,393,640
|
|
|
7,235,242
|
LIABILITIES & EQUITY
|
|
|
|
|
|
|
|
Current liabilities
|
|
|
|
|
|
|
|
|
Accounts payable and accrued liabilities
|
13
|
|
|
184,712
|
|
|
211,406
|
|
Current debt
|
14
|
|
|
16,343
|
|
|
16,402
|
|
|
|
|
201,055
|
|
|
227,808
|
Debt
|
14
|
|
|
587,201
|
|
|
585,006
|
Other non-current liability
|
5(b)
|
|
|
49,194
|
|
|
-
|
Asset retirement obligations
|
15
|
|
|
109,069
|
|
|
85,259
|
Deferred income tax liabilities
|
17
|
|
|
869,207
|
|
|
842,305
|
|
|
|
|
1,815,726
|
|
|
1,740,378
|
Equity
|
|
|
|
|
|
|
|
Share capital
|
18
|
|
|
5,318,950
|
|
|
5,314,589
|
Treasury stock
|
|
|
|
(12,949)
|
|
|
(10,953)
|
Contributed surplus
|
|
|
|
38,430
|
|
|
78,557
|
Accumulated other comprehensive loss
|
|
|
|
(18,127)
|
|
|
(17,056)
|
Deficit
|
|
|
|
(53,804)
|
|
|
(143,401)
|
Total equity attributable to shareholders of the Company
|
|
|
|
5,272,500
|
|
|
5,221,736
|
Attributable to non-controlling interests
|
|
|
|
305,414
|
|
|
273,128
|
|
|
|
|
5,577,914
|
|
|
5,494,864
|
|
|
|
|
7,393,640
|
|
|
7,235,242
|
Approved on behalf of the Board of Directors
(Signed) Robert R. Gilmore Director
(Signed) Paul N. Wright Director
The accompanying notes are an integral part of these consolidated
financial statements.
Eldorado Gold Corporation
Consolidated Income Statements
(Expressed in thousands of U.S. dollars)
For the year ended December 31
|
|
Note
|
|
|
2014
|
|
|
2013
|
|
|
|
|
|
$
|
|
|
$
|
Revenue
|
|
|
|
|
|
|
|
|
|
Metal sales
|
|
|
|
|
1,067,899
|
|
|
1,123,992
|
|
|
|
|
|
|
|
|
|
Cost of sales
|
|
|
|
|
|
|
|
|
|
Production costs
|
|
26
|
|
|
508,280
|
|
|
481,892
|
|
Inventory write-down
|
|
|
|
|
13,469
|
|
|
-
|
|
Depreciation and amortization
|
|
|
|
|
177,227
|
|
|
149,068
|
|
|
|
|
|
698,976
|
|
|
630,960
|
Gross profit
|
|
|
|
|
368,923
|
|
|
493,032
|
|
|
|
|
|
|
|
|
|
Exploration expenses
|
|
|
|
|
16,230
|
|
|
34,686
|
General and administrative expenses
|
|
|
|
|
68,196
|
|
|
68,291
|
Defined benefit pension plan expense
|
|
16
|
|
|
1,620
|
|
|
2,478
|
Share based payments
|
|
19
|
|
|
18,775
|
|
|
19,492
|
Impairment loss on property, plant and equipment and goodwill
|
|
11, 12
|
|
|
-
|
|
|
808,414
|
Foreign exchange loss
|
|
|
|
|
7,176
|
|
|
6,799
|
Operating profit (loss)
|
|
|
|
|
256,926
|
|
|
(447,128)
|
|
|
|
|
|
|
|
|
|
Loss on disposal of assets
|
|
|
|
|
1,926
|
|
|
830
|
Loss on marketable securities and other investments
|
|
|
|
|
2,415
|
|
|
2,421
|
Loss on investments in associates
|
|
|
|
|
102
|
|
|
1,285
|
Impairment loss on investment in associates
|
|
9
|
|
|
-
|
|
|
14,051
|
Other income
|
|
|
|
|
(9,436)
|
|
|
(6,201)
|
Asset retirement obligation accretion
|
|
15
|
|
|
2,326
|
|
|
1,337
|
Interest and financing costs
|
|
27
|
|
|
28,779
|
|
|
40,412
|
Writedown of assets
|
|
|
|
|
3,001
|
|
|
3,990
|
|
|
|
|
|
|
|
|
|
Profit (loss) before income tax
|
|
|
|
|
227,813
|
|
|
(505,253)
|
Income tax expense
|
|
17
|
|
|
121,269
|
|
|
144,362
|
Profit (loss) for the year
|
|
|
|
|
106,544
|
|
|
(649,615)
|
|
|
|
|
|
|
|
|
|
Attributable to:
|
|
|
|
|
|
|
|
|
Shareholders of the Company
|
|
|
|
|
102,607
|
|
|
(653,329)
|
Non-controlling interests
|
|
|
|
|
3,937
|
|
|
3,714
|
Profit (loss) for the year
|
|
|
|
|
106,544
|
|
|
(649,615)
|
|
|
|
|
|
|
|
|
|
Weighted average number of shares outstanding (thousands)
|
|
28
|
|
|
|
|
|
|
Basic
|
|
|
|
|
716,288
|
|
|
715,181
|
Diluted
|
|
|
|
|
716,300
|
|
|
715,181
|
|
|
|
|
|
|
|
|
|
Earnings per share attributable to shareholders of the Company:
|
|
|
|
|
|
|
|
|
Basic earnings (loss) per share
|
|
|
|
|
0.14
|
|
|
(0.91)
|
Diluted earnings (loss) per share
|
|
|
|
|
0.14
|
|
|
(0.91)
|
The accompanying notes are an integral part of these consolidated
financial statements.
Eldorado Gold Corporation
Consolidated Statements of Comprehensive Income
(Expressed in thousands of U.S. dollars except per share amounts)
For the year ended December 31
|
|
Note
|
|
|
2014
|
|
|
2013
|
|
|
|
|
|
$
|
|
|
$
|
|
|
|
|
|
|
|
|
|
Profit (loss) for the year
|
|
|
|
|
106,544
|
|
|
(649,615)
|
Other comprehensive income (loss):
|
|
|
|
|
|
|
|
|
Change in fair value of available-for-sale financial assets
|
|
|
|
|
(2,353)
|
|
|
(1,258)
|
Realized losses (gains) on disposal of available-for-sale financial
assets transferred to net income
|
|
|
|
|
1,878
|
|
|
(17)
|
Actuarial gains (losses) on defined benefit pension plans
|
|
16
|
|
|
(596)
|
|
|
8,754
|
Total other comprehensive income (loss) for the year
|
|
|
|
|
(1,071)
|
|
|
7,479
|
Total comprehensive income (loss) for the year
|
|
|
|
|
105,473
|
|
|
(642,136)
|
|
|
|
|
|
|
|
|
|
Attributable to:
|
|
|
|
|
|
|
|
|
Shareholders of the Company
|
|
|
|
|
101,536
|
|
|
(645,850)
|
Non-controlling interests
|
|
|
|
|
3,937
|
|
|
3,714
|
|
|
|
|
|
105,473
|
|
|
(642,136)
|
The accompanying notes are an integral part of these consolidated
financial statements.
Eldorado Gold Corporation
Consolidated Statements of Cash Flows
(Expressed in thousands of U.S. dollars)
For the year ended December 31
|
|
Note
|
|
|
2014
|
|
|
2013
|
|
|
|
|
|
$
|
|
|
$
|
Cash flows generated from (used in):
|
|
|
|
|
|
|
|
|
Operating activities
|
|
|
|
|
|
|
|
|
Profit (loss) for the year
|
|
|
|
|
106,544
|
|
|
(649,615)
|
Items not affecting cash
|
|
|
|
|
|
|
|
|
Asset retirement obligation accretion
|
|
|
|
|
2,326
|
|
|
1,337
|
Depreciation and amortization
|
|
|
|
|
177,227
|
|
|
149,068
|
Unrealized foreign exchange loss
|
|
|
|
|
1,154
|
|
|
775
|
Deferred income tax expense
|
|
|
|
|
27,795
|
|
|
27,516
|
Loss on disposal of assets
|
|
|
|
|
1,926
|
|
|
830
|
Loss on investment in associates
|
|
|
|
|
102
|
|
|
1,285
|
Impairment loss on investment in associates
|
|
|
|
|
-
|
|
|
14,051
|
Writedown of assets
|
|
|
|
|
3,001
|
|
|
3,990
|
Impairment loss on property, plant and equipment and goodwill
|
|
|
|
|
-
|
|
|
808,414
|
Loss on marketable securities and other investments
|
|
|
|
|
2,415
|
|
|
2,421
|
Share based payments
|
|
|
|
|
18,775
|
|
|
19,492
|
Defined benefit pension plan expense
|
|
|
|
|
1,620
|
|
|
2,478
|
|
|
|
|
|
342,885
|
|
|
382,042
|
|
|
|
|
|
|
|
|
|
Property reclamation payments
|
|
|
|
|
(3,038)
|
|
|
-
|
Changes in non-cash working capital
|
|
20
|
|
|
(56,502)
|
|
|
(25,669)
|
|
|
|
|
|
283,345
|
|
|
356,373
|
Investing activities
|
|
|
|
|
|
|
|
|
Net cash paid on acquisition of subsidiary
|
|
5(a)
|
|
|
(30,318)
|
|
|
-
|
Purchase of property, plant and equipment
|
|
|
|
|
(410,690)
|
|
|
(481,986)
|
Proceeds from the sale of property, plant and equipment
|
|
|
|
|
147
|
|
|
2,086
|
Proceeds on production of tailings retreatment
|
|
|
|
|
26,599
|
|
|
24,877
|
Purchase of marketable securities
|
|
|
|
|
(3,313)
|
|
|
-
|
Proceeds from the sale of marketable securities
|
|
|
|
|
1,521
|
|
|
2,025
|
Investments in associates
|
|
|
|
|
-
|
|
|
(6,357)
|
Redemption of (investment in) term deposits
|
|
|
|
|
31,902
|
|
|
(34,702)
|
Decrease (increase) in restricted cash
|
|
|
|
|
31
|
|
|
(12)
|
|
|
|
|
|
(384,121)
|
|
|
(494,069)
|
Financing activities
|
|
|
|
|
|
|
|
|
Issuance of common shares for cash
|
|
|
|
|
1,996
|
|
|
7,003
|
Proceeds from contributions net of dispositions from
|
|
|
|
|
|
|
|
|
non-controlling interest
|
|
5(b)
|
|
|
40,000
|
|
|
2,321
|
Dividend paid to non-controlling interests
|
|
|
|
|
(12,466)
|
|
|
(13,281)
|
Dividend paid to shareholders
|
|
|
|
|
(13,010)
|
|
|
(84,948)
|
Purchase of treasury stock
|
|
|
|
|
(6,413)
|
|
|
(6,462)
|
Long-term and bank debt proceeds
|
|
|
|
|
32,625
|
|
|
15,977
|
Long-term and bank debt repayments
|
|
|
|
|
(32,622)
|
|
|
(10,354)
|
Loan financing costs
|
|
|
|
|
-
|
|
|
(223)
|
|
|
|
|
|
10,110
|
|
|
(89,967)
|
Net decrease in cash and cash equivalents
|
|
|
|
|
(90,666)
|
|
|
(227,663)
|
Cash and cash equivalents - beginning of year
|
|
|
|
|
589,180
|
|
|
816,843
|
|
|
|
|
|
|
|
|
|
Cash and cash equivalents - end of year
|
|
|
|
|
498,514
|
|
|
589,180
|
The accompanying notes are an integral part of these consolidated
financial statements.
Eldorado Gold Corporation
Consolidated Statements of Changes in Equity
(Expressed in thousands of U.S. dollars)
For the year ended December 31,
|
Note
|
|
|
2014
|
|
|
2013
|
|
|
|
|
$
|
|
|
$
|
Share capital
|
|
|
|
|
|
|
|
Balance beginning of year
|
|
|
|
5,314,589
|
|
|
5,300,957
|
|
Shares issued upon exercise of share options, for cash
|
|
|
|
1,996
|
|
|
7,003
|
|
Transfer of contributed surplus on exercise of options
|
|
|
|
2,141
|
|
|
2,934
|
|
Transfer of contributed surplus on exercise of deferred phantom
|
|
|
|
|
|
|
|
|
units
|
|
|
|
224
|
|
|
3,695
|
Balance end of year
|
|
|
|
5,318,950
|
|
|
5,314,589
|
|
|
|
|
|
|
|
|
Treasury stock
|
|
|
|
|
|
|
|
Balance beginning of year
|
|
|
|
(10,953)
|
|
|
(7,445)
|
|
Purchase of treasury stock
|
|
|
|
(6,413)
|
|
|
(6,462)
|
|
Shares redeemed upon exercise of restricted share units
|
|
|
|
4,417
|
|
|
2,954
|
Balance end of year
|
|
|
|
(12,949)
|
|
|
(10,953)
|
|
|
|
|
|
|
|
|
Contributed surplus
|
|
|
|
|
|
|
|
Balance beginning of year
|
|
|
|
78,557
|
|
|
65,382
|
|
Share based payments
|
|
|
|
18,503
|
|
|
19,847
|
|
Shares redeemed upon exercise of restricted share units
|
|
|
|
(4,417)
|
|
|
(2,954)
|
|
Recognition of other non-current liability and related costs
|
5(b)
|
|
|
(51,848)
|
|
|
-
|
|
Partial reversal of non-controlling interest acquired on buy-out
|
|
|
|
-
|
|
|
2,911
|
|
Transfer to share capital on exercise of options and deferred
|
|
|
|
|
|
|
|
|
phantom units
|
|
|
|
(2,365)
|
|
|
(6,629)
|
Balance end of year
|
|
|
|
38,430
|
|
|
78,557
|
|
|
|
|
|
|
|
|
Accumulated other comprehensive loss
|
|
|
|
|
|
|
|
Balance beginning of year
|
|
|
|
(17,056)
|
|
|
(24,535)
|
|
Other comprehensive gain (loss) for the year
|
|
|
|
(1,071)
|
|
|
7,479
|
Balance end of year
|
|
|
|
(18,127)
|
|
|
(17,056)
|
|
|
|
|
|
|
|
|
Deficit
|
|
|
|
|
|
|
|
Balance beginning of year
|
|
|
|
(143,401)
|
|
|
594,876
|
|
Dividends paid
|
|
|
|
(13,010)
|
|
|
(84,948)
|
|
Profit (loss) attributable to shareholders of the Company
|
|
|
|
102,607
|
|
|
(653,329)
|
Balance end of year
|
|
|
|
(53,804)
|
|
|
(143,401)
|
Total equity attributable to shareholders of the Company
|
|
|
|
5,272,500
|
|
|
5,221,736
|
|
|
|
|
|
|
|
|
Non-controlling interests
|
|
|
|
|
|
|
|
Balance beginning of year
|
|
|
|
273,128
|
|
|
284,100
|
|
Profit attributable to non-controlling interests
|
|
|
|
3,937
|
|
|
3,714
|
|
Dividends declared to non-controlling interests
|
|
|
|
(11,651)
|
|
|
(14,096)
|
|
Increase (decrease) during the period
|
5(b)
|
|
|
40,000
|
|
|
(590)
|
Balance end of year
|
|
|
|
305,414
|
|
|
273,128
|
|
|
|
|
|
|
|
|
Total equity
|
|
|
|
5,577,914
|
|
|
5,494,864
|
The accompanying notes are an integral part of these consolidated
financial statements.
Click here for the Consolidated Financial Statements for the year ended
Dec 31, 2014.
SOURCE Eldorado Gold Corporation
Krista Muhr, Vice President Investor Relations, Eldorado Gold Corporation, 604.601.6701 or 1.888.353.8166