Record Gold Ounces and Revenues $15 Million in Cash Flows from Operating Activities Declares Ninth Consecutive Quarterly
Dividend of $0.04/share
MONTREAL, QUEBEC--(Marketwired - Nov. 9, 2016) - Osisko Gold Royalties Ltd (the "Company" or "Osisko")
(TSX:OR)(NYSE:OR) reports today third quarter net earnings of $17.7 million ($0.17 per basic share).
Third Quarter 2016 Highlights
- Record 9,902 gold ounces earned, a 20% increase compared to Q3 2015;
- Record revenues of $17.6 million, a 50% increase compared to Q3 2015;
- Net cash flows from operating activities of $15.0 million;
- Net earnings of $17.7 million, $0.17 per basic and diluted share;
- Cash and cash equivalents of $392.7 million as at September 30, 2016;
- Began trading on the New York Stock Exchange under the ticker "OR", on July 6, 2016;
- Announced an exploration earn-in agreement with Osisko Mining Inc. to streamline its operations;
- Declaration of ninth quarterly dividend of $0.04/share; and
- On October 17, 2016, announced the Toronto Stock Exchange ("TSX") approval for a Normal Course Issuer Bid to
acquire up to 5.3 million common shares.
Sean Roosen, Chair and Chief Executive Officer, commenting on the third quarter results:
"Our team continues to focus on increasing its exposure to cash-flowing assets to complement our flagship gold royalties on
the Canadian Malartic and Éléonore mines. We are also supporting the development of large projects held by associated companies
with the expectation that our investment will provide our shareholders with solid returns through increased portfolio value and
cash flows from streams and royalties on these assets. During the quarter, we continued to focus on activities in the
royalty/streaming sector as we negotiated an earn-in agreement for our exploration properties in the James Bay and Labrador
Trough areas. Our efforts in streamlining our operations should increase cash flows in the near-term."
Third Quarter 2016 Results
Revenues increased in the third quarter of 2016 as a result of higher in-kind royalties earned and sold. Gold royalties earned
from the Canadian Malartic mine decreased by 629 ounces or 8% (sales decreased by 178 ounces in comparison to Q3 2015), but the
decrease from the Canadian Malartic mine was more than offset by the gold royalties earned from the Éléonore, Island Gold and
Vezza net smelter return ("NSR") royalties. The Company earned and sold 1,570 ounces of gold from the Éléonore mine compared to
nil in the third quarter of 2015. The Company received and sold 430 ounces of gold from its Island Gold mine NSR royalty and 267
ounces of gold from its Vezza NSR royalty in the third quarter of 2016 compared to nil in the third quarter of 2015. These
royalties were acquired in the fourth quarter of 2015. The average selling price of gold in Canadian dollars was also higher in
the third quarter of 2016 at $1,743 compared to $1,485 in the third quarter of 2015.
In the third quarter of 2016, operating income amounted to $10.4 million compared to $7.1 million in the third quarter of
2015. The increase in net operating income in the third quarter of 2016 is mainly the result of higher revenues generated from
the sale of gold and silver and lower business development expenses, partially offset by the depletion of royalty interests and
higher general and administrative ("G&A") expenses. The increase in G&A expenses is mainly due to higher legal costs and
costs related to the listing on the NYSE, partially offset by lower share-based compensation expenses. The decrease in the
closing share price between the second and third quarter of 2016 (from $16.89 to $14.36) generated a lower share-based
compensation expense on the deferred share units and the restricted share units in the third quarter of 2016. The decrease in
business development expenses is mainly the result of lower share-based compensation.
The increase in net earnings in the third quarter of 2016 is mainly the result of the increase in operating income and net
gain on investments of $10.0 million (compared to a net loss on investments of $0.9 million in the third quarter of 2015),
partially offset by a decrease in the foreign exchange gain, a higher share of loss of associates, higher finance costs and an
increase in deferred income tax expense.
Net cash flows provided by operating activities before change in working capital items increased in the third quarter of 2016
mainly as a result of higher revenues when compared to the same period in 2015.
Focusing on the Royalty and Streaming Business
On October 5, 2016, Osisko announced the closing of its earn-in agreement transaction with Osisko Mining Inc. ("Osisko
Mining"). Under the terms of the agreement, Osisko Mining may earn a 100% interest in Osisko's in 28 exploration properties
located in the James Bay area (excluding the Coulon copper-zinc project and four other exploration properties) and Labrador
Trough (the "Properties") upon completing expenditures of $32.0 million over a 7-year period; Osisko Mining will earn a 50%
interest upon completing expenditures totaling $19.2 million over a 4-year period. These Properties were acquired as part of
the Virginia transaction in 2015.
Osisko will retain an escalating NSR royalty ranging from 1.5% to a maximum of 3.5% on precious metals and a 2.0% NSR royalty
on other metals and minerals produced from the Properties. Additionally, new properties acquired by Osisko Mining in the
designated area during a 7-year term will be subject to a royalty agreement in favour of Osisko with similar terms.
Osisko undertakes not to participate in any exploration activity and is bound not to compete with Osisko Mining in areas
covered by the agreement, except for the continuation of activities on its Coulon copper-zinc project held by Osisko and other
Québec institutional shareholders and on four other exploration properties.
As part of the transaction, Osisko's Québec based exploration team and Québec office lease were transferred to Osisko Mining.
The transaction in respect of the Properties is subject to third parties' approval, as applicable.
Following this transaction, the Company expects an annual reduction of approximately $3.0 million on its exploration and
evaluation expenditures, which were capitalized in exploration and evaluation assets in accordance with the Company's accounting
policy, and $4.0 million to $5.0 million on its expenses on the statement of income.
The Company will continue to review its strategic alternatives in respect to its Guerrero exploration properties and the
Coulon project.
Royalty Interests
The following table details the ounces of gold and silver earned from Osisko's producing royalty interests:
Royalties earned (in ounces)
|
For the three months ended September 30, |
For the nine months ended September 30, |
|
2016 |
2015 |
2016 |
2015 |
|
|
|
|
|
Gold |
|
|
|
|
|
|
|
|
|
Canadian Malartic |
7,635 |
8,264 |
21,999 |
22,136 |
Éléonore |
1,570 |
- |
5,225 |
- |
Island Gold |
430 |
- |
1,081 |
- |
Vezza |
267 |
- |
488 |
- |
|
9,902 |
8,264 |
28,793 |
22,136 |
|
|
|
|
|
Silver |
|
|
|
|
|
|
|
|
|
Canadian Malartic |
9,153 |
7,780 |
25,129 |
22,744 |
Vezza |
81 |
- |
81 |
- |
|
9,234 |
7,780 |
25,210 |
22,744 |
In addition to the in-kind royalties, the Company also earned cash royalties of $0.1 million in the third quarter of 2016 and
$0.3 million for the first nine months of 2016 (compared to nil in the corresponding periods of 2015), and dividend income from
its investment in Labrador Iron Ore Royalty Company ("LIORC") of $1.6 million in the third quarter of 2016 and $4.7 million for
the first nine months of 2016 (compared respectively to $1.6 million and $4.3 million for 2015).
Canadian Malartic
Osisko owns a 5% NSR royalty interest in the Canadian Malartic mine, which is owned and operated by Agnico Eagle Mines Limited
("Agnico") and Yamana Gold Inc. ("Yamana"), (together referred to as the "Partners").
For the third quarter of 2016, the Partners indicated that production at the Canadian Malartic mine was 152,855 ounces of gold
compared to 153,206 ounces of gold for the third quarter of 2015. In the first nine months of 2016, production at the Canadian
Malartic mine was 445,086 ounces of gold compared to 425,874 ounces of gold in the corresponding period of 2015.
During the third quarter of 2016, the Partners indicated that the Canadian Malartic mill processed an average of 53,989 tonnes
per day ("tpd"), compared to an average of 53,703 tpd in the corresponding period of 2015. For the first nine months of 2016, the
Canadian Malartic mill processed an average of 53,928 tpd compared to an average of 52,139 tpd in the corresponding period of
2015.
Annual production forecast
In February 2016, the Partners indicated the following forecast of annual gold production for the Canadian Malartic mine:
560,000 - 580,000 ounces in 2016, 590,000 - 600,000 ounces in 2017 and 610,000 ounces in 2018. The Partners indicated that the
2016 guidance has been slightly reduced as throughput levels are forecast to be approximately 53,000 tpd.
Pit extension
The Partners indicated that following the Québec Bureau des Audiences Publiques sur l'Environnement ("BAPE") public
hearings in June and July 2016, permitting of the Canadian Malartic extension project and Highway 117 deviation reached an
important milestone with the issue of the BAPE report on October 5, 2016. The report concluded that the project is acceptable and
provides several recommendations intended to enhance social acceptability. The next step is for the Ministre du Développement
durable, de l'Environnement et de la Lutte contre les changements climatiques to review the report and present his decision
to Cabinet for approval. No date for the approval has been set, but the Partners anticipate that this may occur in the first half
of 2017. Osisko expects that the Canadian Malartic extension would provide access to higher grade ore and would add more than 2.0
million ounces of gold over the life of the Canadian Malartic mine.
Odyssey zones
The Odyssey zones lie on the east side of the Canadian Malartic property, approximately 1.5 kilometres east of the current
limit of the Canadian Malartic open pit. The Odyssey prospect is composed of multiple mineralized bodies grouped into two
elongated zones - the Odyssey North and Odyssey South zones - that strike east-southeast and dip steeply south. Odyssey North has
been traced from a depth of 600 to 1,300 metres below surface along a strike length of approximately 1.5 kilometres. Odyssey
South currently has a strike length of 0.5 kilometre and has been located between approximately 200 and 550 metres below
surface.
The Partners indicated that in the third quarter of 2016, a total of 56 drill holes (40,019 metres) were completed at Odyssey,
bringing the year-to-date total to 113 holes (89,774 metres). Drilling will continue through year-end, at which time an inferred
mineral resource for the Odyssey North deposit is expected in early 2017.
The Partners have increased the 2016 exploration budget on Odyssey to 95,000 metres of drilling for a total budget of $13.5
million.
Osisko holds a 3% NSR royalty on the Odyssey North zone and a 5% NSR royalty on the Odyssey South zone.
For more information, please refer to the press releases of Agnico Eagle and Yamana filed on SEDAR (www.sedar.com) and EDGAR (www.sec.gov).
Éléonore
Osisko owns a 2.0 - 3.5% NSR sliding-scale royalty interest in the Éléonore mine, which is operated by Goldcorp Inc.
("Goldcorp").
Goldcorp indicated that third quarter gold production totaled 68,000 ounces compared to 87,000 ounces in the third quarter of
2015. Gold production decreased compared to the third quarter of 2015 as a result of lower tonnes and lower grades. Lower tonnage
milled in the third quarter of 2016 (458,000 tonnes compared to 536,000 tonnes in the third quarter of 2015) was the result of
mill feed consisting of only mine material while the comparative period in 2015 included significant feed from surface
stockpiles. The lower grade for the third quarter of 2016 (5.22 g/t Au compared to 5.78 g/t Au in the third quarter of 2015) was
consistent with the mine plan.
Goldcorp indicated that gold production for the nine months ended September 30, 2016 reached 209,000 ounces compared to
163,000 ounces for the nine months ended September 30, 2015 as Éléonore continues to ramp up production and productivity
improvements are realized. A total of 1,289,000 tonnes were milled in the first nine months of 2016 compared to 1,190,000 tonnes
in the corresponding period of 2015. Average mill grade for the first nine months of 2016 were 5.48 g/t Au compared to 5.19 g/t
Au for the first nine months of 2015.
Goldcorp indicated that at the end of the third quarter of 2016, the production shaft construction, including the ore handling
system on the 690 metre level, was completed and commissioned and hoisting commenced in early October 2016. Increased production
levels, development efficiencies and reduced operating costs are anticipated as a result of the production shaft completion.
Goldcorp indicated that mine production for the nine months ended September 30, 2016 was in line with the planned annual
average of between 4,700 to 5,000 tpd of ore from four production horizons. With the completion of the production shaft, the mine
will continue to ramp up ore production in line with the mine plan as a further two production horizons are brought on line by
2018. The production ramp-up to 7,000 tpd is expected to be completed in the first half of 2018.
Annual production forecast
In February 2016, Goldcorp indicated that a conservative ramp-up schedule at Éléonore is expected to lead to gold production
of between 250,000 and 280,000 ounces for 2016.
Exploration and evaluation
Goldcorp indicated that the focus of exploration at Éléonore since the acquisition of the project has been on the extensions
of known mineralization, which has now been traced to a vertical depth of 1,500 metres and is still open down plunge. Mine
exploration continues to test opportunities within the mine footprint, utilizing the increased understanding of orebody geometry
gained during the first years of mining. In addition, three priority exploration areas have been defined within a 10 kilometre
radius of the current mine. A north-east south-west glacial float train contains visibly mineralized boulders, several of which
have returned anomalous high grade gold from grab samples. Ground geophysics is underway to provide better definition of the
possible bedrock source, and to site future trenches and/or scout drill holes, planned for first quarter of 2017. The Old Camp
and Mayappo targets represent a style of diorite-hosted gold-copper mineralization similar to that exploited at the Troilus open
pit mine. Locally significant values of gold have been returned by bedrock grab samples at both sites and at the Old Camp
continuity of alteration and mineralization is reported in historical mapping and trenching data. The information from these
targets is being reviewed and reinterpreted to guide a field program in 2017.
Reserves and resources
Goldcorp published in October 2016 updated mineral reserve and resource estimates as at June 30, 2016 for the Éléonore mine.
Proven and probable gold mineral reserves totaled 4.57 million ounces as of June 30, 2016, compared to 5.35 million ounces as of
December 31, 2015. The decrease was primarily due to depletion and reserve ounces from 2015 being reclassified into resources.
During the year, efforts were focused on increasing drill density and optimizing the mine plan and stope design. The additional
information has allowed Éléonore to design smaller, higher grade stopes, although faster sequencing and additional ore
development will be required. The updated mine plan associated with the June 30, 2016 reserves is expected to provide lower
dilution, and higher grade feed, and increase average annual production compared to the previous reserve mine plan. Further
drilling and mine design updates will concentrate on converting the resources back into reserves. Osisko expects the updated mine
plan to increase royalties in the short-term as the updated mine plan would accelerate the gold production.
The reserve and resources estimate at June 30, 2016 is presented in the table below:
Reserve and resource estimates |
|
|
|
|
Category |
Tonnes
(M) |
Grade
(g/t Au) |
Au
(M oz) |
|
|
|
|
|
|
|
|
Proven and Probable Reserves |
23.44 |
6.07 |
4.57 |
Measured and Indicated Resources(1) |
5.14 |
5.66 |
0.93 |
Inferred Resources |
9.73 |
7.52 |
2.35 |
(1) |
Excludes proven & probable reserves. |
For more information, refer to the press releases of Goldcorp and the Management Discussion and Analysis for the year ended
December 31, 2015 and for the three and nine months ended September 30, 2016, all filed on SEDAR (www.sedar.com) and EDGAR (www.sec.gov).
Island Gold
Osisko owns a 1.7% - 2.55% NSR royalty on the Island Gold mine, which is operated by Richmont Mines Inc. ("Richmont
Mines").
Richmont Mines reported that Island Gold produced 14,031 ounces of gold during the third quarter, in-line with the plan, as
slower production was forecasted due to required downtime related to the scheduled mine and mill electrical upgrade. The mine and
mill electrical upgrade would support the potential production growth scenarios that are currently under review. During the third
quarter, the mine reported higher than the planned mill head grade of 7.70 g/t Au. Richmont Mines also reported that underground
productivity averaged 890 tpd in the third quarter, excluding 16 days of downtime related to the electrical upgrade, and mill
processing averaged 878 tpd, excluding 25 days of downtime related to the electrical upgrade. Richmont Mines expects to deliver
improved performance and higher grades during the fourth quarter as it begins to develop in ore in the higher-grade third mining
horizon.
Richmont Mines indicated that gold production for the nine months ended September 30, 2016 reached 59,237 ounces.
Annual production forecast
On September 12, 2016, Richmont Mines indicated that the 2016 production guidance for the Island Gold mine was increased to
between 75,000 to 80,000 ounces of gold from the original guidance of between 62,000 to 67,000 ounces of gold as a result of
strong performance during the first six months of the year and following the completion of a 25-day shutdown for an electrical
upgrade in August 2016. On October 13, 2016, Richmont Mines reported to remain on track to meet, or exceed, revised guidance for
the year for the Island Gold mine.
Expansion Preliminary Economic Assessment Underway
On November 1st 2016, Richmont Mines provided a status update on its advancement of an expansion case preliminary
economic assessment ("PEA") for the Island Gold mine. The PEA is expected to be released in the first half of 2017 and will
incorporate the company's 2016 year-end resource estimates and will consider a potential ore mining and mill processing rate
increase to 1,100 tpd beginning in 2018, with minimal capital investment required. For the purposes of this Expansion Case PEA,
only the most contiguous portion of the resources located between the 450 metre and 1,000 metre levels will be incorporated.
Exploration and evaluation
On July 7, 2016, Richmont Mines announced that based on the positive results reported from the Phase 1 exploration drilling
program, a strategic Phase 2 exploration drilling program has been launched at the Island Gold mine. Richmont Mines indicated
that the Phase 1 exploration drilling program that commenced in September 2015 has met its objectives, which has supported the
launch of an aggressive Phase 2 exploration program of up to 142,000 metres that will be completed over the next 18 to 24 months.
The primary objective of the Phase 2 program is to expand the existing resource inventory laterally along strike, mainly to the
east of the main deposit, with a goal of extending mine life above the 1,000 metre level that could support the potential
expansion scenarios currently under review, as well as to identify the next million-plus ounces of high-grade inferred resource
at depth, between the 1,000 and 1,500 metre levels.
On September 12, 2016, Richmont Mines announced an increase in the exploration expenditure guidance estimates for 2016 to
$16.0 million from $14.4 million, which includes an additional 22,000 metres of drilling that will focus on defining new
resources in the fourth mining horizon located between the 860 and 1,000 metre levels, which could be incorporated into the short
to medium term mine plan.
For more information, refer to the press releases of Richmont Mines filed on SEDAR (www.sedar.com).
Lamaque Project
Osisko holds a 1.7% royalty on the Lamaque property located in Abitibi and owned by Integra Gold Corp. ("Integra").
On July 27, 2016, Integra announced that it has awarded the contract to construct the Triangle Deposit exploration ramp on the
Lamaque-South Gold Project in Val-d'Or, Québec. Integra indicated that the objective of the underground exploration program is to
conduct close-spaced drilling from within the upper portions of the Triangle Deposit (C1 and C2 zones) as well as exploration
drilling in order to continue growing the resource base. The proposed underground exploration program will also include a bulk
sample of more than 20,000 tonnes of gold mineralized rock required for the purposes of reconciling gold content versus
resource estimates as well as to allow for detailed metallurgical test work to be conducted. Integra indicated that work is
estimated to take between 12 months and 15 months. The company is fully funded to see this work through to completion and all
necessary permits are currently in place.
On October 13, 2016, Integra announced additional assay results from its 2016 drill program on the Triangle Deposit and
indicated that the results continue to support gold zone continuity with infill drilling generally intersecting significantly
higher grades and wider intervals than anticipate.
On August 3, 2016, Integra announced the initiation of a 2,000 metre pilot hole on its Lamaque Deep target, situated on the
Lamaque property. Once the pilot hole has been completed (estimated completion in the fourth quarter of 2016), the target will be
tested with a minimum of 15 wedged holes originating from the pilot hole at various intervals. The Company is anticipating the
entire program including wedges will total 10,000 metres of drilling.
For more information, refer to the press releases of Integra filed on SEDAR (www.sedar.com).
Cariboo Gold Project
The Company holds a 1.5% NSR royalty on the Cariboo Gold Project, which is owned by Barkerville Gold Mines Ltd.
("Barkerville"), an associate of Osisko, and located in British Columbia, Canada.
The Cariboo Gold Project consists of 2,119 square kilometres of land along a strike length of 60 kilometres which includes
several past producing mines in the Cariboo Gold District, a historically profitable yet still underexplored area of
south-central British Columbia. Based upon historic estimates, historical gold production in the Cariboo area is approximately
4.5 million ounces. Barkerville is carrying out a 20,000 metre drilling program at Island Mountain and has made applications
to amend current mining permits to allow the resumption of mining in early 2017.
Osisko and Barkerville have also agreed to negotiate a gold stream agreement ("Gold Stream Agreement") following the
completion by Barkerville of a feasibility study on the Cariboo Gold Project. Following a 60 day negotiation period, if Osisko
and Barkerville have not entered into a Gold Stream Agreement, Barkerville shall either grant a right to Osisko to purchase an
additional 0.75% NSR royalty for consideration of $12.5 million, or make a payment of $12.5 million to Osisko.
For more information, refer to the press releases of Barkerville filed on SEDAR (www.sedar.com).
Hermosa Project
The Company acquired a 1% NSR royalty on any lead/zinc/silver sulfide ores mined from the Hermosa Project owned by Arizona
Mining Inc. ("Arizona Mining") for $10.0 million. The Hermosa Project is located in Santa Cruz County, Arizona.
On October 31, 2016, Arizona Mining released a mineral resource update for the Taylor deposit located on its 100%-owned
Hermosa Project. The Taylor deposit now comprises 31.1 million tonnes in the Indicated Mineral Resource category grading
10.9% zinc equivalent ("ZnEq") plus 82.7 million tonnes of Inferred Mineral Resource grading 11.1% ZnEq, both reported in
accordance with NI 43-101 guidelines utilizing a 4% ZnEq cutoff grade. The Taylor Deposit remains open to the north, west and
south over land controlled by Arizona Mining and drilling has commenced to test the limits of the resource. Arizona Mining
completed metallurgical test work on drill core from the Taylor Deposit that projects overall recoveries of 92.9% Pb; 85.5% Zn
and 91% Ag using industry standard froth flotation processing technology.
For more information on resources, refer to the press releases of Arizona Mining filed on SEDAR (www.sedar.com).
Horne 5 Project
The Company has provided a $10.0 million loan to Falco Resources Ltd. ("Falco") with an 18 month maturity and bearing interest
at 7%. Under the terms of the loan, Falco and Osisko shall negotiate, by the end of October 2017, the terms, conditions and form
of a silver and/or gold stream agreement ("Stream Agreement") whereby Osisko may provide Falco with a portion of the development
capital required to build the Horne 5 Project. In this case, the principal amount of the loan and any accrued interest will be
applied against the stream deposit. At the maturity date, if Falco and Osisko have not concluded a Stream Agreement, the
principal amount of the loan will be converted into a 1% NSR royalty on the Horne 5 Project and accrued interests will be
paid in cash.
On September 6, 2016, Falco announced that it has retained full ownership of the Horne 5 Project as Glencore Canada
Corporation has elected not to exercise its back-in right. Glencore Canada Corporation retains a 2% NSR royalty on all metals
produced and has rights of first refusal with respect to purchase or toll process all or any portion of the concentrates and
other mineral products.
On October 3, 2016, Falco reported an updated mineral resource estimate for its wholly-owned Horne 5 Project. The updated
resource estimate now includes and combines the newly assembled historical underground channel sample database, new economic
parameters as per Falco's recently published PEA, including lowering of the NSR cut-off, additional 2016 drilling results and
revised commodity pricing assumptions. New measured, indicated and inferred resources have been updated for the Horne 5 Deposit,
which now contains 6 high grade zones. Falco reported that this updated resource estimate increases gold equivalent measured and
indicated resources by 32%.
At a $55/tonne NSR cut-off, Horne 5 is now estimated to host:
- A measured resource of 736,000 gold equivalent ounces ("oz AuEq"), including 475,410 oz Au contained in 9.4 million tonnes
averaging 2.45 g/t AuEq (1.58 g/t Au; 16.33 g/t Ag; 0.18% Cu; 0.81% Zn);
- An indicated resource of 6,336,000 oz AuEq, including 4,088,383 oz Au contained in 81.7 million tonnes averaging 2.41 g/t
AuEq (1.56 g/t Au; 14.19 g/t Ag; 0.18% Cu; 0.86% Zn);
- An inferred resource of 1,710,000 oz AuEq, including 1,053,061 oz Au contained in 22.3 million tonnes averaging 2.39 g/t
AuEq (1.47 g/t Au; 22.98 g/t Ag; 0.2% Cu; 0.68% Zn).
- The measured and indicated resources represents 81% of the total resources in AuEq content (oz) and the measured resources
represent 10% of the measured & indicated resources in AuEq content (oz).
A 43-101 technical report was filed on SEDAR on November 7 2016. Falco also reported that the company plans to drill 20,000
metres at the Horne 5 West and Quemont Extension exploration targets in 2016.
On November 2nd, 2016, Falco announced an upsized bought deal offering of $32.5 million and concurrent private
placement for up to an additional $25.0 million with strategic investors. Osisko will acquire up to $3.0 million in flow-through
shares as part of the bought deal transactions.
For more information, refer to the press releases of Falco filed on SEDAR (www.sedar.com). For more information on the PEA, refer to the NI 43-101 Technical Report of Falco
titled Preliminary Economic Assessment of the Horne 5 Project dated April 28, 2016 and filed on SEDAR.
Windfall Project
The Company holds a 1.5% NSR royalty on the Windfall property owned by Osisko Mining.
On October 5, 2016, Osisko exercised its option to acquire a 1% NSR royalty on the Windfall property for $5.0 million.
Osisko was already the holder of a 0.5% NSR royalty on Windfall. Therefore, the royalty on the Windfall property increased to a
total of 1.5%.
In April 2016, Osisko Mining indicated that, at Windfall, a 55,000 metre drill program commenced in October 2015. This program
was subsequently increased to 100,000 meters in June and to 150,000 meters in September 2016. On September 19, 2016, Osisko
Mining indicated that in recent weeks, the corporate and exploration focus has turned solidly to the Windfall project. The
exploration team is having increasing success at intersecting new extensions of the currently known zones, and have also
successfully begun to define new parallel mineralized zones like the previously announced Wolf Zone within the primary
mineralized corridors. Osisko Mining reported that all indications at this point are leading to believe that Osisko Mining will
continue to expand the main deposit as they advance drilling, particularly to the east-north-east and at depth.
For more information, refer to the press releases of Osisko Mining filed on SEDAR (www.sedar.com).
Marban Project
Osisko is the holder of a 0.425% NSR royalty on the Marban gold project, owned by Osisko Mining, and is entitled to receive a
payment of $4.25 million on a production decision.
Osisko Mining provided in June 2016 an updated resource estimate for its 100%-owned Marban gold project, located near the town
of Malartic, Québec. This update is the result of 92,900 metres of infill drilling and historical core re-sampling executed since
the last published resource estimates on the Marban and Norlartic deposits. The new estimate has produced an increase in the
overall gold resource and an upgrading of the bulk of the resources to measured and indicated ("M&I"), pit-constrained
categories.
Osisko Mining provided the following highlights for its updated resource estimate on Marban:
- In-pit M&I resource (total of both Marban and Norlartic) now stands at 1.48 million ounces of gold in 37.0 million
tonnes at an undiluted grade of 1.24 g/t Au, with in-pit inferred resource adding 0.13 million ounces of gold in
3.6 million tonnes at an undiluted grade of 1.15 g/t Au. Pit-constrained resources are based on a Whittle-optimized
pit shell using a gold price of US$1,250 per ounce and a calculated external lower cut-off of 0.4 g/t Au.
- At a higher cut-off grade of 1.0 g/t Au, the in-pit M&I resources stand at 1.04 million ounces of gold in 16.5 million
tonnes at an undiluted grade of 1.97 g/t Au, representing 70% of the overall pit-constrained M&I ounces.
- The new global M&I mineral inventory currently stands at 1.83 million ounces of gold in 47.6 million tonnes with an
average grade of 1.20 g/t Au and the global inferred mineral inventory stands at 0.41 million ounces of gold in 12.2 million
tonnes at an average grade of 1.03 g/t Au (based on 0.40 g/t Au lower cut-off).
- Both Marban and Norlartic are open at depth and further drilling is planned to establish the potential for additional
resources that may be mined by underground methods.
For more information, refer to the press releases of Osisko Mining filed on SEDAR (www.sedar.com).
Royalties - Summary of Producing and Advanced Non-producing
The following table describes the Company's key royalty interests in producing and advanced-stage exploration projects:
Asset |
Operator |
Interest(1) |
Commodities |
Jurisdiction |
Stage |
Canadian Malartic |
Agnico/Yamana |
5.0% NSR royalty |
Au |
Québec |
Production |
Éléonore |
Goldcorp |
2.0-3.5% NSR royalty |
Au |
Québec |
Production |
Island Gold(2) |
Richmont Mines |
1.7-2.55% NSR royalty |
Au |
Ontario |
Production |
Hewfran Block(2) |
Metanor Resources |
1.7% NSR royalty |
Au |
Québec |
Production |
Vezza |
Ressources Nottaway Inc. |
5% NSR royalty & 40% NPI royalty |
Au |
Québec |
Production |
Horne 5 |
Falco |
Gold/silver stream or 1% NSR royalty |
Au, Ag, Cu |
Québec |
Exploration |
Lamaque(2) |
Integra Gold |
1.7% NSR royalty |
Au |
Québec |
Exploration |
Cariboo |
Barkerville |
1.5% NSR royalty |
Au |
British Columbia |
Exploration |
Windfall |
Osisko Mining |
1.5% NSR Royalty |
Au |
Québec |
Exploration |
Marban |
Osisko Mining |
0.425% NSR royalty |
Au |
Québec |
Exploration |
Hermosa |
Arizona Mining |
1% NSR royalty |
Zn, Pb, Ag |
Arizona, USA |
Exploration |
Pandora |
Agnico/Yamana |
2% NSR royalty |
Au |
Québec |
Exploration |
Malartic - Odyssey North |
Agnico/Yamana |
3% NSR royalty |
Au |
Québec |
Exploration |
Malartic - Odyssey South |
Agnico/Yamana |
5% NSR royalty |
Au |
Québec |
Exploration |
Upper Beaver |
Agnico/Yamana |
2% NSR royalty |
Au, Cu |
Ontario |
Exploration |
Hammond Reef |
Agnico/Yamana |
2% NSR royalty |
Au |
Ontario |
Exploration |
Kirkland Lake Camp |
Agnico/Yamana |
2% NSR royalty |
Au, Cu |
Ontario |
Exploration |
Copperwood |
Highland Copper |
3% NSR royalty(3) |
Ag, Cu |
Michigan, USA |
Exploration |
James Bay properties |
Osisko Mining |
1.5-3.5% NSR royalty(4) |
Au, Ag |
Québec |
Exploration |
James Bay properties |
Osisko Mining |
2.0 NSR royalty(4) |
Other than
Au, Ag |
Québec |
Exploration |
|
|
|
|
|
|
Options on royalties - Summary of Advanced Non-producing
Asset |
Operator |
Interest |
Price to Exercise |
Commodities |
Jurisdiction |
Stage |
Neita |
Unigold |
2% NSR Royalty |
$2.0 million |
Au |
Dominican Republic |
Exploration |
Yellowknife City Gold |
TerraX |
3% NSR Royalty |
$4.0 million |
Au |
Northwest Territories |
Exploration |
(1) |
In 2015, the Company acquired a portfolio of 28 Canadian royalties held by Teck Resources Limited ("Teck").
for a cash consideration of $24.2 million. |
(2) |
After the sale of a 15% interest in the royalties acquired from Teck to Caisse de dépôt et placement du
Québec. |
(3) |
3.0% NSR royalty on the Copperwood project. Upon closing of the acquisition of the White Pine project,
Highland Copper will grant Osisko a 1.5% NSR royalty on all metals produced from the White Pine project, and Osisko's
royalty on Copperwood will be reduced to 1.5%. |
(4) |
Effective October 4, 2016, Osisko entered into an earn-in agreement with Osisko Mining where Osisko Mining
may earn a 100% interest in Osisko's 28 exploration properties located in the James Bay area and Labrador Through
(excluding the Coulon copper-zinc project and four other exploration properties) upon completing expenditures of $32.0
million over a 7-year period; Osisko Mining may earn a 50% interest upon completing expenditures totaling $19.2 million
over a 4-year period. Osisko will retain an excalating NSR royalty ranging from 1.5% to 3.5% on precious metals and a 2.0%
NSR royalty on other metals and minerals produced from the properties. New properties acquired by Osisko Mining in a
designated area during the 7-year term will be subject to a royalty agreement in favour of Osisko with similar terms. The
transaction in respect of the properties is subject to third parties' approval, as applicable. |
Portfolio of Investments
The Company's assets include a portfolio of shares of publicly traded companies. Osisko invests, and intends to continue from
time to time investing, in various companies within the mining industry for investment purposes, and with the objective of
improving its ability to acquire interests in exploration assets, future royalties or revenue streams. In addition to investment
objectives, in some cases, the Company may decide to take a more active role, including providing management personnel, technical
and/or administrative support, as well as nominating individuals to the investee's board of directors.
Osisko may, from time to time and without further notice except as required by law, increase or decrease its investments at
its discretion.
Osisko Mining Inc.
As at September 30, 2016, Osisko holds an interest of 13.9% in Osisko Mining.
In July 2016, Osisko Mining completed a $25.0 million private placement of flow-through shares and in September 2016, Osisko
Mining completed a $32.3 million private placement of common shares.
For more information, please refer to the press releases of Osisko Mining and Osisko Mining's profile on SEDAR (www.sedar.com).
Labrador Iron Ore Royalty Corporation
Osisko holds a 9.8% interest in the shares of LIORC. The Company views this investment as an opportunity to provide
asset/commodity diversification to its current portfolio of royalties. LIORC is entirely focused on the Iron Ore Company of
Canada ("IOC") operations through:
- A 7% gross royalty on the IOC iron ore operations;
- A $0.10 per tonne marketing fee on all products sold by IOC; and
- A 15% direct interest in IOC.
IOC is a major Canadian iron ore producer held by Rio Tinto (59%), Mitsubishi Corporation (26%) and LIORC. The mine, located
in the Newfoundland and Labrador Province in Canada, has been producing and processing iron ore concentrate and pellets since
1954.
On August 4, 2016, LIORC indicated that the outlook for the balance of the year looks promising as IOC still expects to
produce close to 21 million tonnes of concentrate using 11 million tonnes to produce 10 million tonnes of pellets leaving
approximately 10 million tonnes of concentrate for sale. IOC expects to be able to sell all the pellets and concentrate it can
produce. Pricing of iron ore and especially the premium for pellets is currently quite firm following the lows reached at the end
of last year. While there are mixed predictions of the direction prices will follow, the sentiment in the market seems to have
improved. With expected increased production of concentrate and if prices remain at current levels and the Canadian dollar does
not materially strengthen against the U.S. dollar, the results for the balance of the year should be positive as per LIORC.
LIORC historically has distributed its income, net of its limited operating expenses, to shareholders. The Company acquired
its interest in LIORC for $105.7 million and has received to date $10.5 million in dividends, including $6.3 million in 2016
($4.7 million for the first nine months).
For more information, refer to the press releases of LIORC filed on SEDAR (www.sedar.com) and the press releases of Rio Tinto and LIORC available on their web sites (www.riotinto.com and www.labradorironore.com).
Financial Position
As at September 30, 2016, the Company's cash and cash equivalents amounted to $392.7 million compared to $258.5 million
as at December 31, 2015.
Furthermore, the Company has access to up to $200.0 million in cash under its revolving credit facility to acquire royalties
and metal revenue streams.
Quarterly Dividend
On November 9, 2016, the Board of Directors has declared the ninth quarterly dividend of $0.04 per common share payable on
January 16, 2017 to shareholders of record as of the close of business on December 31, 2016.
The Company has implemented a Dividend Reinvestment Plan ("DRIP") that allows Canadian shareholders to reinvest their cash
dividends into additional common shares. The Company will issue the additional common shares from treasury at a 3 % discount to
the weighted average price of the common shares on the TSX during the five (5) trading days immediately preceding the dividend
payment date. No commissions, service charges or brokerage fees are payable by shareholders who elect to participate in the
DRIP.
New York Stock Exchange Listing
On July 6, 2016, Osisko Gold Royalties' common shares began trading on the New York Stock Exchange ("NYSE") under the symbol
"OR". Osisko continues to be listed on the TSX under the symbol "OR".
The addition of a US listing provides Osisko's existing US shareholders with a greater ability to trade the Company's shares
and allows the Company to increase its shareholder base in the U.S.
Normal Course Issuer Bid
The Company continuously seeks out ways to support the value of its common shares in the market place.
On October 17, 2016, Osisko announced that the TSX has approved the Company's notice of intention to make a normal course
issuer bid (the "NCIB Program"). Under the terms of the NCIB Program, Osisko may acquire up to 5,330,217 of its common shares
from time to time in accordance with the normal course issuer bid procedures of the TSX.
As of November 9, 2016, the Company has not purchased any common shares under the NCIB program.
Senior Management Changes
In August 2016, John Burzynski, Senior Vice President, New Business Development, and Robert Wares, Chief Geologist, resigned
from the Company to concentrate their efforts on Osisko Mining. Mr. Burzynski will continue as a Director of the Company.
Mr. André Gaumond, Senior Vice President, Northern Development, has announced his retirement effective early November. The
Company will continue to benefit from his relationships and knowledge as he will continue his participation on the Board of
Directors. Mr Gaumond is the founder of Virginia Mines and one of the Company's largest individual shareholders.
The Company is pleased to announce the appointment of Vincent Metcalfe and Frédéric Ruel as Vice President, Investor Relations
and Vice President and Corporate Controller respectively. Both individuals have contributed to the development of Osisko Gold
Royalties and will continue to actively participate in the growth of the Company.
Mr. Paul Archer, formerly Vice President, Northern Exploration, will now assume the role of Chief Geologist for the Company.
Mr. Archer joined Osisko as part of the Virginia Mines transaction in February 2015 and was a member of the Éléonore discovery
team.
Outlook
Osisko's 2016 outlook on royalties is based on publicly available forecasts, in particular forecasts for the Canadian Malartic
mine published by Yamana and Agnico Eagle, forecasts for the Éléonore mine published by Goldcorp and forecasts for the Island
Gold mine from Richmont Mines. For royalties earned on properties where no public information is available, Osisko obtains
internal forecasts from the producers.
Attributable royalty production for 2016 is still estimated at 28,000 to 29,000 gold ounces for the Canadian Malartic mine,
between 5,500 and 6,200 gold ounces for the Éléonore mine and between 1,000 and 2,000 ounces from other royalties.
Following the farm-out agreement reached with Osisko Mining, the Company expects a significant reduction in its exploration
and evaluation expenses starting October 1, 2016. Expenses for 2016 are now estimated at $7.8 million ($4.8 million net of
estimated tax credits) compared originally to $10.3 million ($8.3 million net of estimated exploration tax credits), of which
about $3.8 million will be financed by Québec institutions and other partners. As of September 30, 2016, $7.4 million have been
spent in exploration and evaluation activities (excluding the variation in accounts payable).
Q3 2016 Conference Call Information
Osisko will host a conference call on Thursday, November 10, 2016 at 11:00 am EST, where senior management will discuss the
financial results and provide an update on the Company's activities.
Those interested in participating in the conference call should dial in at 1-(647) 788-4922 (international), or 1-(877)
223-4471 (North American toll free). An operator will direct participants to the call.
The conference call replay will be available from 2:00 pm EST on November 10, 2016 until 11:59 pm EST on November 17, 2016
with the following dial in numbers: 1-(800) 585-8367 (North American toll free) or 1-(416) 621-4642, access code 5673354.
About Osisko Gold Royalties Ltd
Osisko Gold Royalties is an intermediate precious metal royalty company focused on the Americas that commenced activities in
June 2014. It holds over 50 royalties, including a 5% NSR royalty on the Canadian Malartic Mine (Canada) and a 2.0-3.5% NSR
royalty on the Éléonore Mine (Canada). It maintains a strong financial position with cash resources of $393 million at September
30, 2016 and has distributed dividends to its shareholders during the past eight consecutive quarters.
Osisko's head office is located at 1100 Avenue des Canadiens-de-Montréal, Suite 300, Montréal, Québec, H3B 2S2.
Forward-looking statements
Certain statements contained in this press release may be deemed "forward-looking statements". All statements in this
release, other than statements of historical fact, that address future events, developments or performance that Osisko expects to
occur including management's expectations regarding Osisko's growth, results of operations, estimated future revenues,
requirements for additional capital, mineral reserve and mineral resource estimates, production estimates, production costs and
revenue, future demand for and prices of commodities, business prospects and opportunities are forward looking statements. In
addition, statements (including data in tables) relating to reserves and resources and gold equivalent ounces are forward looking
statements, as they involve implied assessment, based on certain estimates and assumptions, and no assurance can be given that
the estimates will be realized. Forward looking statements are statements that are not historical facts and are generally, but
not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects",
"potential", "scheduled" and similar expressions or variations (Including negative variations), or that events or conditions
"will", "would", "may", "could" or "should" occur including, without limitation, the performance of the assets of Osisko, the
realization of the anticipated benefits deriving from its portfolio of investments and the transaction with Osisko Mining,
determination of strategic alternatives for the Guerrero and Coulon project, achievement of production and operation forecasts
published by Osisko and by operators of properties in which Osisko holds a royalty or an interest, timeliness of delivery of the
Cabinet's decision with respect to the pit extension at Canadian Malartic, timeliness of full ramp-up by the operator and the
realization of the anticipated benefits of the updated mine plan at Éléonore, conclusion of a Stream Agreement with Falco and
successful results of planned and current exploration work conducted by by operators of properties in which Osisko holds a
royalty or an interest, timely delivery of the PEA by Richmont Mines, timely and successful closing of Falco's financing.
Although Osisko believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such
statements involve known and unknown risks, uncertainties and other factors and are not guarantees of future performance and
actual results may accordingly differ materially from those in forward looking statements.
Factors that could cause the actual results to differ materially from those in forward-looking statements include, without
limitation: fluctuations in the prices of the commodities that drive royalties held by Osisko (gold and silver);
fluctuations in the value of the Canadian dollar relative to the U.S. dollar; regulatory changes in national and local
government, including permitting and licensing regimes and taxation policies; regulations and political or economic developments
in any of the countries where properties in which Osisko holds a royalty or other interest are located or through which they are
held; risks related to the operators of the properties in which Osisko holds a royalty, influence of macroeconomic developments;
business opportunities that become available to, or are pursued by Osisko; continued availability of capital and financing and
general economic, market or business conditions; litigation; title, permit or license disputes related to interests on any of the
properties in which Osisko holds a royalty or other interest; development, permitting, infrastructure, operating or technical
difficulties on any of the properties in which Osisko holds a royalty or other interest; rate and timing of production
differences from resource estimates or production forecasts by operators of properties in which Osisko holds a royalty or other
interest ; risks and hazards associated with the business of exploring, development and mining on any of the properties in which
Osisko holds a royalty or other interest, including, but not limited to unusual or unexpected geological and metallurgical
conditions, slope failures or cave-ins, flooding and other natural disasters or civil unrest or other uninsured risks. The
forward looking statements contained in this press release are based upon assumptions management believes to be reasonable,
including, without limitation: the ongoing operation of the properties in which Osisko holds a royalty or other interest by the
owners or operators of such properties in a manner consistent with past practice; the accuracy of public statements and
disclosures made by the owners or operators of such underlying properties; no material adverse change in the market price of the
commodities that underlie the asset portfolio; no adverse development in respect of any significant property in which Osisko
holds a royalty, stream or other interest; the accuracy of publicly disclosed expectations for the development of underlying
properties that are not yet in production; and the absence of any other factors that could cause actions, events or results to
differ from those anticipated, estimated or intended.
For additional information with respect to these and other factors and assumptions underlying the forward-looking
statements made in this press release, see the section entitled "Risk Factors" in the most recent Annual Information Form of
Osisko which is filed with the Canadian securities commissions and available electronically under Osisko's issuer profile on
SEDAR at www.sedar.com and with the U.S. Securities and Exchange Commission on
EDGAR at www.sec.gov. The forward-looking information set forth herein reflects
Osisko's expectations as at the date of this press release and is subject to change after such date. Osisko disclaims any
intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events
or otherwise, other than as required by law.
Cautionary Note to U.S. Investors Regarding the Use of Mineral Reserve and Mineral Resource
Estimates
Osisko is subject to the reporting requirements of the applicable Canadian securities laws, and as a result reports its
mineral reserves according to Canadian standards. Canadian reporting requirements for disclosure of mineral properties are
governed by NI 43-101. The definitions of NI 43-101 are adopted from those given by the Canadian Institute of Mining, Metallurgy
and Petroleum ("CIM"). U.S. reporting requirements are governed by the Commission's Industry Guide 7 ("Guide 7"). This press
release includes estimates of mineral reserves and mineral resources reported in accordance with NI 43-101. These reporting
standards have similar goals in terms of conveying an appropriate level of confidence in the disclosures being reported, but
embody different approaches and definitions. For example, under Guide 7, mineralization may not be classified as a "reserve"
unless the determination has been made that the mineralization could be economically and legally produced or extracted at the
time the reserve determination is made. Consequently, the definitions of "Proven Mineral Reserves" and "Probable Mineral
Reserves" under CIM standards differ in certain respects from the standards of the Commission. Osisko also reports estimates of
"mineral resources" in accordance with NI 43-101. While the terms "Mineral Resource," "Measured Mineral Resource," "Indicated
Mineral Resource" and "Inferred Mineral Resource" are recognized by NI 43-101, they are not defined terms under standards of the
Commission and, generally, U.S. companies are not permitted to report estimates of mineral resources of any category in documents
filed with the Commission. As such, certain information contained in this press release concerning descriptions of mineralization
and estimates of mineral reserves and mineral resources under Canadian standards is not comparable to similar information made
public by United States companies subject to the reporting and disclosure requirements of the Commission. Readers are cautioned
not to assume that all or any part of Measured Mineral Resources or Indicated Mineral Resources will ever be converted into
Mineral Reserves. Readers are also cautioned not to assume that all or any part of an Inferred Mineral Resource exists, or is
economically or legally mineable. Further, an "Inferred Mineral Resource" has a great amount of uncertainty as to its existence
and as to its economic and legal feasibility, and a reader cannot assume that all or any part of an Inferred Mineral Resource
will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis
of feasibility or other economic studies.
Osisko Gold Royalties Ltd |
Consolidated Balance Sheets |
(Unaudited) |
(tabular amounts expressed in thousands of Canadian dollars) |
|
|
September 30, |
December 31, |
|
2016 |
2015 |
|
$ |
$ |
|
|
|
Assets |
|
|
|
|
|
Current assets |
|
|
|
|
|
|
Cash and cash equivalents |
392,717 |
258,509 |
|
Short-term investments |
100 |
200 |
|
Accounts receivable |
9,002 |
6,244 |
|
Other assets |
1,158 |
508 |
|
402,977 |
265,461 |
|
|
|
Non-current assets |
|
|
|
|
|
|
Investments in associates |
73,783 |
44,011 |
|
Other investments |
209,822 |
105,485 |
|
Royalty interests |
492,596 |
449,439 |
|
Property and equipment |
744 |
835 |
|
Exploration and evaluation |
100,229 |
96,220 |
|
Goodwill |
111,204 |
111,204 |
|
Deferred income taxes |
7,657 |
8,778 |
|
1,399,012 |
1,081,433 |
|
|
|
Liabilities |
|
|
|
|
|
Current liabilities |
|
|
|
|
|
|
Accounts payable and accrued liabilities |
5,586 |
11,469 |
|
Dividends payable |
4,264 |
3,783 |
|
Provisions and other liabilities |
4,053 |
1,264 |
|
13,903 |
16,516 |
|
|
|
Non-current liabilities |
|
|
|
|
|
|
Long-term debt |
45,552 |
- |
|
Provisions and other liabilities |
11,479 |
8,912 |
|
Deferred income taxes |
127,344 |
118,766 |
|
198,278 |
144,194 |
|
|
|
Equity |
|
|
|
|
|
|
Share capital |
908,764 |
745,007 |
|
Warrants |
30,901 |
18,072 |
|
Contributed surplus |
9,972 |
10,164 |
|
Equity component of convertible debenture |
3,091 |
- |
|
Accumulated other comprehensive income (loss) |
9,360 |
(41,203) |
|
Retained earnings |
236,818 |
203,800 |
Equity attributable to Osisko Gold Royalties Ltd shareholders |
1,198,906 |
935,840 |
|
Non-controlling interests |
1,828 |
1,399 |
Total equity |
1,200,734 |
937,239 |
|
1,399,012 |
1,081,433 |
|
|
|
|
|
|
|
|
|
Osisko Gold Royalties Ltd |
Consolidated Statements of Income |
For the three and nine months ended September 30, 2016 and 2015 |
(Unaudited) |
(tabular amounts expressed in thousands of Canadian dollars, except per share amounts) |
|
|
Three months ended
September 30, |
|
Nine months ended
September 30, |
|
|
2016 |
|
2015 |
|
2016 |
|
2015 |
|
|
$ |
|
$ |
|
$ |
|
$ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenues |
17,570 |
|
11,724 |
|
48,968 |
|
32,604 |
|
|
|
|
|
|
|
|
|
|
Expenses |
|
|
|
|
|
|
|
|
|
Depletion of royalty interests |
(2,629 |
) |
- |
|
(8,463 |
) |
- |
|
|
General and administrative |
(3,445 |
) |
(2,829 |
) |
(12,732 |
) |
(10,806 |
) |
|
Business development |
(1,597 |
) |
(2,194 |
) |
(6,419 |
) |
(7,491 |
) |
|
Exploration and evaluation |
(241 |
) |
(521 |
) |
(936 |
) |
(1,445 |
) |
|
Gain (loss) on disposal of exploration and evaluation assets |
- |
|
500 |
|
(312 |
) |
500 |
|
|
Cost recoveries from associates |
763 |
|
405 |
|
2,166 |
|
838 |
|
Operating income |
10,421 |
|
7,085 |
|
22,272 |
|
14,200 |
|
|
Interest income |
932 |
|
987 |
|
2,249 |
|
3,308 |
|
|
Dividend income |
1,572 |
|
1,560 |
|
4,716 |
|
4,295 |
|
|
Finance costs |
(963 |
) |
(162 |
) |
(2,516 |
) |
(444 |
) |
|
Foreign exchange gain (loss) |
1,909 |
|
5,245 |
|
(11,177 |
) |
6,653 |
|
|
Share of loss of associates |
(1,334 |
) |
(504 |
) |
(3,730 |
) |
(2,271 |
) |
|
Other gains (losses), net |
9,992 |
|
(931 |
) |
29,542 |
|
4,476 |
|
Earnings before income taxes |
22,529 |
|
13,280 |
|
41,356 |
|
30,217 |
|
|
Income tax expense |
(4,854 |
) |
(3,471 |
) |
(8,156 |
) |
(6,237 |
) |
Net earnings |
17,675 |
|
9,809 |
|
33,200 |
|
23,980 |
|
|
|
|
|
|
|
|
|
|
Net earnings (loss) attributable to: |
|
|
|
|
|
|
|
|
|
Osisko Gold Royalties Ltd's shareholders |
17,757 |
|
9,872 |
|
33,433 |
|
24,135 |
|
|
Non-controlling interests |
(82 |
) |
(63 |
) |
(233 |
) |
(155 |
) |
|
|
|
|
|
|
|
|
|
Net earnings per share |
|
|
|
|
|
|
|
|
|
Basic |
0.17 |
|
0.10 |
|
0.32 |
|
0.28 |
|
|
Diluted |
0.17 |
|
0.10 |
|
0.32 |
|
0.28 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Osisko Gold Royalties Ltd |
Consolidated Statements of Cash Flows |
For the three and nine months ended September 30, 2016 and 2015 |
(Unaudited) |
(tabular amounts expressed in thousands of Canadian dollars) |
|
|
|
|
|
|
Three months ended
September 30, |
|
Nine months ended
September 30, |
|
|
2016 |
|
2015 |
|
2016 |
|
2015 |
|
|
$ |
|
$ |
|
$ |
|
$ |
|
|
|
|
|
|
|
|
|
|
Operating activities |
|
|
|
|
|
|
|
|
Net earnings |
17,675 |
|
9,809 |
|
33,200 |
|
23,980 |
|
Adjustments for: |
|
|
|
|
|
|
|
|
|
Share-based compensation |
942 |
|
1,461 |
|
5,722 |
|
3,889 |
|
|
Accretion on note receivable |
- |
|
(363 |
) |
- |
|
(1,077 |
) |
|
Depletion and amortization |
2,698 |
|
44 |
|
8,647 |
|
120 |
|
|
Loss (gain) on disposal of exploration and evaluation assets |
- |
|
(500 |
) |
312 |
|
(500 |
) |
|
Share of loss of associates |
1,334 |
|
504 |
|
3,730 |
|
2,271 |
|
|
Net gain on disposal of investments |
- |
|
(58 |
) |
(3,410 |
) |
(5,590 |
) |
|
Change in fair value of financial assets at fair value through profit and loss |
(6,301 |
) |
151 |
|
(10,309 |
) |
236 |
|
|
Deferred income tax expense |
4,854 |
|
3,471 |
|
8,156 |
|
6,237 |
|
|
Foreign exchange loss (gain) |
(1,906 |
) |
(5,240 |
) |
11,170 |
|
(6,641 |
) |
|
Other |
(3,292 |
) |
925 |
|
(14,759 |
) |
1,102 |
|
Net cash flows provided by operating activities before changes in non-cash working capital
items |
16,004 |
|
10,204 |
|
42,459 |
|
24,027 |
|
Changes in non-cash working capital items |
(1,026 |
) |
2,390 |
|
(1,797 |
) |
(3,481 |
) |
Net cash flows provided by operating activities |
14,978 |
|
12,594 |
|
40,662 |
|
20,546 |
|
|
|
|
|
|
|
|
|
|
Investing activities |
|
|
|
|
|
|
|
|
Cash acquired - acquisition of Virginia |
- |
|
- |
|
- |
|
34,900 |
|
Net decrease in short-term investments |
100 |
|
4,707 |
|
200 |
|
32,696 |
|
Acquisition of investments |
(45,563 |
) |
(28,548 |
) |
(64,462 |
) |
(139,582 |
) |
Proceeds on disposal of investments |
2,858 |
|
- |
|
12,204 |
|
- |
|
Acquisition of royalty interests |
(750 |
) |
(5,000 |
) |
(50,250 |
) |
(6,000 |
) |
Proceeds on sale of royalty interests |
- |
|
- |
|
3,630 |
|
- |
|
Property and equipment |
(13 |
) |
(2 |
) |
(93 |
) |
(143 |
) |
Exploration and evaluation |
(2,533 |
) |
(2,352 |
) |
(7,617 |
) |
(5,909 |
) |
Net cash flows used in investing activities |
(45,901 |
) |
(31,195 |
) |
(106,388 |
) |
(84,038 |
) |
|
|
|
|
|
|
|
|
|
Financing activities |
|
|
|
|
|
|
|
|
Convertible debenture |
- |
|
- |
|
50,000 |
|
- |
|
Issuance of common shares and warrants |
1,095 |
|
328 |
|
177,608 |
|
3,711 |
|
Investment from non-controlling interests |
- |
|
- |
|
3,637 |
|
- |
|
Issuance of special warrants |
- |
|
- |
|
- |
|
200,020 |
|
Issue expenses |
(57 |
) |
(6 |
) |
(8,066 |
) |
(10,794 |
) |
Financing fees |
- |
|
- |
|
(844 |
) |
- |
|
Dividends paid |
(3,795 |
) |
(2,830 |
) |
(11,231 |
) |
(7,166 |
) |
Net cash flows provided by (used in) financing activities |
(2,757 |
) |
(2,508 |
) |
211,104 |
|
185,771 |
|
Increase (decrease) in cash and cash equivalents before effects of exchange rate changes on
cash and cash equivalents |
(33,680 |
) |
(21,109 |
) |
145,378 |
|
122,279 |
|
Effects of exchange rate changes on cash and cash equivalents |
1,906 |
|
5,240 |
|
(11,170 |
) |
6,641 |
|
Increase (decrease) in cash and cash equivalents |
(31,774 |
) |
(15,869 |
) |
134,208 |
|
128,920 |
|
Cash and cash equivalents - beginning of period |
424,491 |
|
319,960 |
|
258,509 |
|
175,171 |
|
Cash and cash equivalents - end of period |
392,717 |
|
304,091 |
|
392,717 |
|
304,091 |
|